Bazooka Power Rail Bar Supplemental Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Bazooka Power Rail Bar Supplemental Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Supplemental
Mounting Options
Installation Instructions
Screw 4 bolts (4) with washers into threaded mounting plates (5). Rotate
bolts and mounting plates until bolts are against rack tubing. Then tighten
all 4 bolts evenly. You will have a 1/8 inch gap between spacers (2) and
mounting arm after mounting plate is tightened against the atv rack
tubbing.
1/8 inch gap
Tighten 6mm x 40mm bolt (1) until
gap is gone and rail is tight. There will
be a slight bend of the Power Rail
Mounting arms.
Remove all mounting hardware from the end of the Power
Rail arms. Place 6mm x 40mm bolt (1) through arm mounting
hole. Add two 3mm spacers (2) between arm and mounting
plate. Hand tighten 6 mm nylon locking nut (3). Place Power
Rail center of the ATV rack.
1.
2.
3.
4.
4.
5.
5.
2.
1.
/