Lefroy Brooks BK 1150 Installation & Servicing Guide

Category
Sanitary ware
Type
Installation & Servicing Guide

This manual is also suitable for

1150
RADIATOR VALVES
INSTALLATION GUIDE
47mm
R ½
15mm copper
2
IMPORTANT INFORMATION
Professional installation
We recommend that our products are fitted
by a fully qualified professional plumber. They
should be installed correctly and in accordance
with all local water regulations.
Flushing system
It is most important to flush out all pipework
thoroughly before connecting the valves. This
is the single most common cause of cartridge
failure.
Water quality
In hard water areas, a suitable water treatment
system should be provided to prevent limescale
deposits (calcium deposits) which may eect the
long term performance of the cartridge.
Servicing
All serviceable parts are available to maintain
your Lefroy Brooks product.
Bleeding & balancing system
Before balancing a system, all radiators should
be bled to remove any airlocks in the system.
DIMENSIONS
Not to scale
3
INSTALLATION
1 Apply suitable sealant or tape to the threads
of the adapter.
2 Pass the adapter through the nut and locate
into the radiator.
3 Secure using a 13mm hexagonal key.
4 Oer the radiator valve to the nut. Rotate the
nut onto the valve thread.
Do not tighten the nut at this stage.
5 Unscrew and remove the nut and olive from
the bottom of the radiator valve.
4
INSTALLATION
6 Place the nut on to the copper pipe with the
internal thread facing upward.
7 Place the olive on to the copper pipe.
8 Repeat the previous stages for the other side
of the radiator using the other valve.
9 Gently lower the radiator and valve assembly
onto the copper pipes.
10 Slide the olives and nuts up the copper pipes
and tighten to secure.
11 Tighten the nut between the radiator valve
and radiator.
The radiator is now ready for bleeding and
balancing. Please see ‘Balancing the heating
system’ section. Check all joints for leaks.
Splines
5
LOCKSHIELD CONVERSION
Note: Lefroy Brooks supply identical pairs of
radiator valves. It is possible to make one into a
‘lockshield’ cover.
To do this:
Remove the cross handle/handwheel
assembly.
Using an 8mm (5/16) diameter drill bit, drill
out the splines in the end of the spindle.
This will allow the cross handle/handwheel
to spin freely without eecting the radiators
‘balanced’ setting. Use the opposite on/o
cross handle/handwheel assembly for any
future maintenance.
°C °C
IN OUT
Digital
thermometer
Digital
thermometer
Ideal temperature dierence
between inlet and outlet is
11°C to 12°C
6
BALANCING THE HEATING SYSTEM
Note: On/o & lockshield valves can be fitted either side of the radiator
Balancing the heating system
Unless you are competent, balancing your
heating system is best left to professionals.
Brief outline of method
Ensure that the system has been bled.
Determine the order in which the radiators
are served by the boiler. The radiators need to
be balanced from first served to last served.
Determine the inlet & outlet of the radiator,
to determine the water flow direction.
Adjust the balancing valve until the
temperature drop across the radiator is
approximately 1/ 1C (use radiator /
dierential thermometers).
Repeat this process on all radiators until the
entire system has been balanced.
Once the setting is complete, the balancing
valve should not require any further
adjustment unless the pipework or radiator is
changed or replaced.
7
SERVICING
To replace or clean the cartridge within the radiator valve unscrew the cross handle/handwheel assembly.
Wearing a rubber glove such as those used for washing up will improve grip. The cartridge can be unscrewed
and removed using a 17mm spanner or socket. When finished, always check for leaks.
A replacement cartridge is available. Part number PHL078.
Whilst every effort is made to ensure the accuracy of these, they are subject to change without
notice as part of the companys product development process. The use of trademarks, product design
and artwork is subject to licence or agreement with LBIP Ltd. The design registrations, trademark registrations
and copyrights are protected by law and the use or reproduction outside the terms of an agreement is prohibited.
The right to modify designs and dimensions is reserved. LBIP Ltd is a member of ACID (Anti Copying in Design). E&OE
© LBIP Ltd 2021
CONTRACT ENQUIRIES
+44 (0)1992 708 316
info@lefroybrooks.co.uk
CUSTOMER SERVICE, SPARES & TECHNICAL ENQUIRIES
+44 (0)1902 390 894
technical@lefroybrooks.co.uk
LEFROYBROOKS.CO.UK
20.065.145C / APRIL 2021
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8

Lefroy Brooks BK 1150 Installation & Servicing Guide

Category
Sanitary ware
Type
Installation & Servicing Guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI