![](//vs1.manuzoid.com/store/data-gzf/d76a418336a5ec1785ba65ca88ea8e4d/2/000981314.htmlex.zip/bg1.jpg)
FORLAMINATES,HARDWOODANDENGINEERED
Installationinstructions
1.Checkfornails.
2.Sweepormop.
3.Rollout1widthofmembrane.
4.Cutrollatwall.
5.Installflooringplanks.
6.Rolloutnextwidth.
7.Sealseamsusingtheattachedtapebyremovingpaperstripandpressingthetapedownto
adheretomembrane.
Repeatsteps3to7untilflooriscompleted.
NOTE:WheninstallingNaturalSGinbasementorwhereamoisturebarrierisrequired,extendtheunderlayment1”-2”upthe
sidesofallwalls.ToensurethevaporbarrierqualitiesofNaturalSGaremaintained,avaportapeisrequiredtosealallseams
thatarenotsealedbytheSealGuardsystem.Newconcreteshouldcurefor60-90daysminimum,beforeinstallingflooring
products.Checkforexcessivemoistureinvariousareasbeforeinstallationreferringtoflooringmanufacturer’srecommendations.
Consultwithyourflooringspecialistforadditionalinstructions.