Allied Brass P1020-3-ABZ Installation guide

Type
Installation guide
Step1: Drill Holes in Wall for screws or screw anchors
Determine your desired location for installation .Make a mark on the wall where each mounting screw will be placed as
shown below. Making sure unit is level. Drill a hole on each mark.
Step2: Attach unit to Mounting Surface.
No portion of this document or any artwork contained herein should reproduced in any way without the written consent of ALLIED BRASS INC.
INSTALLATION INSTRUCTIONS
P1020-3
DRILLED HOLE
ANCHOR
THREADED INSERT
SCREW
CARD-58(CAP)
60.33 mm / 2
3
8
in
63.50 mm / 2
1
2
in
60.33 mm / 2
3
8
in
  • Page 1 1

Allied Brass P1020-3-ABZ Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI