Growatt AXE 5.0L Installation guide

Type
Installation guide
AXE 5.0L
Quick Installation Manual
1.Installation environment
Max.+50Min.0℃ RH.+15%~+85%
2.Installation tools
3.Battery size
4.Check
Check AXE 5.0L packing list
4-1
AXE 5.0L X1
Warranty card X1
Certificate of conformity X1
5
Warranty
card
Certificate of
conformity
Indoor installation
650mm
140mm
350mm
1
PCS Link-in Link-out
PCS Link-in Link-out
PCS Link-in Link-out
PCS Link-in Link-out
To PCS CAN
Wiring of Multi-clusters battery in parallel
7-2
Cluster 1 Cluster 2 Cluster 3 Cluster 8
Power combiner box
. . .
CAN communication
Power+
Power-
PE
To PCS
Cluster 1 Cluster 2 Cluster 3 Cluster 8
. . .
8.Key operation
Power button
Note: When multiple battery syetem are used in parallel connection, you only need to press one key of any
module to start the system.and also press one key to shut down the battery system.
9.Service and contact
Shenzhen Growatt New Energy CO.,Ltd
86 0755 2747 1942 service@ginverter.com
W:www.ginverter.com
Growatt New Energy
Situstion
System off
System on
Touch
Press(2S)
Press(2S)
Press once
Definition
No reaction
Power on
Shut down
Press
Note:1.Supports up to 8 clusters in parallel.
2.The power combiner box needs to be prepared by the user.
Quick installation Manual X1
Quick installation
Manual
4-13/F,Building A,Sino-German,Europe,Industrial Park,
Hangcheng Ave,Guxing Community,Xixiang Subdistrict,
Baoan District,shenzhen,China.
Installation Procedure
6-2
Note:
When stacking, make sure that all batteries are aligned and lock the safety bolt.
Note:
1.The battery base is required while installing the battery system .
2. The maximum quantity of stacking battery pack is 10, if it exceeds 10, please install them by
the way of multiple clusters in parallel.
3. Please install indoors and ensure the level of the ground.
150mm d500mm
3
24
Installation Location Requirements
6.Floor installation with base
6-1
Wall
150mm 150mm
90°
90°
Ground Ground
Ground(28 clusters installation)
5.Battery operation panel introduction
...
Cluster 1 Cluster 2
Cluster 8
150mm d500mm
Cluster 3
1
2
3
4
5
6
7
8
9
10
11
Fault light
SOC light
Power button
Negative terminal
Positive terminal
Communication between battery packs
of single cluster
USB interface
Link-out for multi-cluster in parallel communication
Link-in for multi-cluster in parallel communication
PCS CAN communication
GND terminal
1
2
3
4
5
6
7
8
9
10
11
7.Wiring
Single cluster wiring
7-1
Battery+
Battery-
PE
CAN communication
AXE 5.0L Cable
To PCS
Note: 1) Please install the communication line first, then plug the unused RJ45 port and
USB port with a dust cover, and finally install the power line.
2) No cable connection required between battery packs in a single battery cluster.
RJ45 dust cover USB dust cover
PCS
PCS
Press down
PCS
Check accessories
4-2
AXE 5.0L Base
AXE 5.0L
AB
AXE 5.0L Cable
Installation Method Compound Mode
C
A*M+B+C
Standard floor installation
Floor installation into N columns A*M+B*N+C*N
(2000±25)mm
RJ 45 dust cover
USB dust cover
Note: "M" means the number of batteries, "N" means the number of clusters.
  • Page 1 1
  • Page 2 2

Growatt AXE 5.0L Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI