Gibraltar Building Products FC2BRW Operating instructions

Type
Operating instructions
FASCIA CAP FLASHING
INSTALLATION GUIDELINES
These installation guidelines are for use with typical or standard applications. It is always recommended to seek advice from a licensed professional, and to
check with your local building inspector or building permit office for approvals and possible variations that may apply.
CAUTION!
Working above grade is inherently dangerous, be sure that proper fall protection measures are in place.
When working with power tools and sheet metal, gloves and eye protection are absolutely required.
Install along the eaves, starting at a corner and working your way around. Hold
the flashing tight against the fascia. Overlap each succeeding piece of roof
starter flashing by 2-3 inches.
After the fascia cap flashing has been installed, apply the underlayment and/or
ice-water barrier.
Depending on local building codes and wind conditions, fascia cap flashing
should be nailed every 12".
12 in.
Grip Edge
Drip Edge
1/32"
Over Driven
  • Page 1 1

Gibraltar Building Products FC2BRW Operating instructions

Type
Operating instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI