Perfect Pitch 1279108 Installation guide

Category
Cable clamps
Type
Installation guide
www.PITCHTOCODE.com
MADE IN USA
CONTENTS
Instruction
Sheet
Universal
Pipe Clamps
Standoffs
HARDWARE & TOOLS NEEDED
Screws
Drill
4. Repeat steps 1-3 on all
additional intervals to maintain
proper pitch during installation.
* Arrow indicators on the Universal Pipe Clamp rotate depending on orientation of clamp.
** Consult your local and federal building code as well as equipment manufacturer instructions for exact requirements.
NOTE: Some installation runs exceed 60 feet (18 meters) for condensate, 32 feet (9 meters) for waste. In these cases,
Standoffs can be stacked using dovetails provided.
1. Align Universal Pipe Clamp to
Standoff using the ruler
indicator*, snap Universal Pipe
Clamp onto Standoff at pitch
interval needed to meet local,
state or federal building code
requirements**. Ensure teeth on
Universal Pipe Clamp snap into
teeth on Standoff.
2. Secure Standoff base onto
substrate (i.e. floor or ceiling
joists, plywood, etc.) in
appropriate location per building
code. Use minimum of two
screws in opposing slots provided
for better stability. Four screws
are recommended for all
standoffs.
3. Push pipe into side opening
on Universal Pipe Clamp to
secure.
ENGLISH INSTRUCTIONS
ADJUSTABLE FASTENING SYSTEM
5x 5x 1x
SCAN TO GO ONLINE
WITH YOUR SMARTPHONE!
ENGLISH INSTALLATION
WALKTHROUGH
ADJUSTABLE FASTENING SYSTEM
FIG. A
FIG. B
FIG. C
FIG. D
FIG. E
FIG. A
FIG. B
FIG. C
FIG. D
FIG. E
Measure distance from source
(ie. Air Handler, Condensing Furnace, Drip Pan, etc.)
Before installation, please refer to codes and
Equipment Manufacturer Requirements.
To the termination point.
(i.e. Outside, Condensate Pump, Basin, etc.)
For this example:
Piping for this application is 3/4 inch PVC. The pipe
needs to be supported and secured every 4 feet
(per code). The pitch minimum is 1/8 inch per foot
for condensate. This is equivalant to 1/2 inch every
4 feet.
The source and termination point are 24 feet apart.
5 Perfect Pitch Standoffs are needed for this
application.
Set first Universal Pipe Clamp at desired
height on built-in scale.
For this example, first clamp was set so the bottom
of the pipe was 1/2 inch above substrate (i.e. floor,
beams, plywood, etc.)
Secure Standoff.
Standoffs were secured with 3/4 inch #12
screws. (Recommended)
Set next Standoff.
In this example, a Standoff was placed 4 feet from
previous Standoff. Universal Pipe Clamp was set
1/2 inch above previous Clamp.
Repeat and continue until you reach
desired source.
In this example, the source is an air handler’s
condensate.
Push pipe into Universal Pipe
Clamps.
VISIT WWW.PITCHTOCODE.COM FOR MORE INFORMATION
Asegure Standoff.
Tutorial de instalación
españoles
ADJUSTABLE FASTENING SYSTEM
FIG. A
FIG. B
FIG. C
FIG. D
FIG. E
FIG. A
FIG. B
FIG. C
FIG. E
Mida la distancia desde la fuente.
(es decir, Manejador de aire, bomba condesadora, bandeja de
goteo, etc...)
Por favor, consulte los códigos y requisitos del
fabricante del equipo antes de la instalación.
Hasta el punto de terminación.
(es decir. Afuera, La bomba de condensado, Cuenca, etc...)
Para este ejemplo:
Tuberías para esta aplicación es 3/4 pulgadas de tubería
de PVC.
La tubería debe mantener y fijar cada 4 pies (por código).
El paso mínimo es 1/8 pulgada por el pie para
condensado.
Esto es equivalente a 1/2 pulgada cada 4 pies.
La fuente y el punto de terminación son 24 pies aparte.
5 Perfect Pitch Standoffs son necesarios para esta
aplicación.
Configurar el primer Universal Pipe Clamp a la
altura deseada en la escala integrada.
Para este ejemplo, la primera abrazadera estaba ajustan
para que el fondo de la tubería era 1/2 pulgada arriba de la
substrato. (es decir. Del piso, vigas, madera contrachapada,
etc...
En este ejemplo Standoffs estaban asegurado con tornillos
3/4 pulgada de chapa. (Recomendado)
Ajuste el Standoff siguiente.
En este ejemplo, la primera Standoff se colocó 4 pies de
Standoff anterior.
Universal Pipe Clamp se fijó 1/2 pulgada encima la
abrazadera anterior.
Repetir y continuar hasta que llegue a la
fuente deseada.
En este ejemplo, la fuente es el controlador de
condensado de aire.
Coloque la tubería en la Universal Pipe
Clamp.
VISITA WWW.PITCHTOCODE.COM PARA MÁS INFORMACIÓN
FIG. D
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4

Perfect Pitch 1279108 Installation guide

Category
Cable clamps
Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI

in other languages