Premier Mounts AST-2446/2 Operating instructions

  • Hello! I've reviewed the installation instructions for the Touchboards AST-2446/2 mount. This document details the steps for assembling and installing the two-piece adjustable mount. I understand it involves attaching the upper pipe to the ceiling, inserting the lower tube, adjusting the height, and securing it with bolts and screws. I'm ready to answer your questions about installing the mount or any points in the instructions.
  • What are the main components of the mount?
    How is the lower tube attached to the upper pipe?
    How is the height of the mount adjusted?
    How is the stability of the mount ensured?
Installation Instructions
AST-2446/2
Step 1
Separate the upper pipe and the lower tube. Install the upper pipe in the ceiling structure using acceptable commercial
standards. Screw the lower portion of the AST2446/2 to the coupling and secure with the elen screws.
Step 2
Once the upper pipe and lower tube have
been securely installed. Insert the lower tube
(with the PSD-D attached) inside the upper pipe.
Adjust the desired height and lock it with the
two (2) through bolts. Then screw in the
(3) three thumb screws to stabilize
the pipe and tube.
2980-A Enterprise Street, Brea, Ca. 92821 / Ph.(800)368-9700 Fax (800)832-4888
E-mail: [email protected] http://www.pmpi.com 02/98
www.touchboards.com 205 Westwood Ave.Long Branch, NJ 07740 1-866-942-6273 [email protected]
/