Premier Mounts AST-2446/2 Operating instructions

Type
Operating instructions
Installation Instructions
AST-2446/2
Step 1
Separate the upper pipe and the lower tube. Install the upper pipe in the ceiling structure using acceptable commercial
standards. Screw the lower portion of the AST2446/2 to the coupling and secure with the elen screws.
Step 2
Once the upper pipe and lower tube have
been securely installed. Insert the lower tube
(with the PSD-D attached) inside the upper pipe.
Adjust the desired height and lock it with the
two (2) through bolts. Then screw in the
(3) three thumb screws to stabilize
the pipe and tube.
2980-A Enterprise Street, Brea, Ca. 92821 / Ph.(800)368-9700 Fax (800)832-4888
E-mail: [email protected] http://www.pmpi.com 02/98
www.touchboards.com 205 Westwood Ave.Long Branch, NJ 07740 1-866-942-6273 [email protected]
  • Page 1 1

Premier Mounts AST-2446/2 Operating instructions

Type
Operating instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI