Achim INOOXF6604, INOPOR6604 Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Achim INOOXF6604 Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Note:
Finial shown is for illustration purposes only.
It may not represent the style of finial purchased.
TRAVERSE ROD INSTALLATION GUIDE
Tools needed:
Installation Instructions (For 66 – 120 in.)
Philipshead
Screwdriver
Tape Measure
Drill & Bit Set
Pencil
Level
Place brackets against wall or ceiling at desired
locations and mark at the top of the screw holes. Use
tape measure and level to make sure marked screw
holes are horizontal to each other.
For mounting to drywall or paneling, pre-drill two pilot
holes for each bracket (1/4” drill bit) and insert anchors
into wall and insert screws into wall anchors. For
mounting directly into wood or studs, wall anchors will
not be necessary.
Detach the finial on the smaller diameter rod by
loosening screws. Attach the finial to the second larger
diameter rod by tightening screws.
Loosen screws on all brackets and slide the larger rod
through left and center bracket from the left.
Insert roller clips into the larger diameter rod from the opening
on right. Have them collected in the far end. One roller clip is
recommended for every 4 inches of panels so only add clips
as needed.
Slide the second larger diameter rod through the right bracket
from the right. Insert the smaller diameter rod into the second
larger diameter rod, connecting the two rods.
Secure rod by tightening screws on all brackets.
Attach drapery panels to rod by clipping the shirr drapery onto
each roller clips.
or
DRYWALL OR
PANELING
WOOD
OR STUDS
( the second larger rod )
/