Gigabyte H282-ZC0 User manual

Category
Motherboards
Type
User manual

This manual is also suitable for

H282-ZC0
H282-ZC1
HCI Server – AMD DP 2U 4 Nodes Front Access Server
User Manual
Rev. 1.0
- 2 -
Copyright
© 2021 GIGA-BYTE TECHNOLOGY CO., LTD. All rights reserved.
The trademarks mentioned in this manual are legally registered to their respective owners.
Disclaimer
Information in this manual is protected by copyright laws and is the property of GIGABYTE.
Changes to the specications and features in this manual may be made by GIGABYTE without prior
notice. No part of this manual may be reproduced, copied, translated, transmitted, or
published in any form or by any means without GIGABYTE's prior written permission.
Documentation Classications
In order to assist in the use of this product, GIGABYTE provides the following types of documentation:
User Manual: detailed information & steps about the installation, conguration and use of this
product (e.g. motherboard, server barebones), covering hardware and BIOS.

User Guide: detailed information about the installation & use of an add-on hardware or
software component (e.g. BMC rmware, rail-kit) compatible with this product.
Quick Installation Guide: a short guide with visual diagrams that you can reference easily for
installation purposes of this product (e.g. motherboard, server barebones).
Please see the support section of the online product page to check the current availability of these docu-
ments.
For More Information
For related product specications, the latest rmware and software, and other information please visit our website at http://
www.gigabyte.com
For GIGABYTE distributors and resellers, additional sales & marketing materials are available from our reseller
portal: http://reseller.b2b.gigabyte.com
For further technical assistance, please contact your GIGABYTE representative or visit
https://esupport.gigabyte.com/ to create a new support ticket
For any general sales or marketing enquiries, you may also message GIGABYTE server directly by email:
Conventions
The following conventions are used in this user's guide:
NOTE!
Pieces of additional
information related to the current topic.
CAUTION!
Precautionary measures to
avoid possible hardware or software problems.
WARNING!
Alerts to any damage that might
result from doing or not doing specic actions.
Server Warnings and Cautions
Before installing a server, be sure that you understand the following warnings and cautions.
WARNING!
To reduce the risk of electric shock or damage to the equipment:
Do not disable the power cord grounding plug. The grounding plug is an important safety
feature.
Plug the power cord into a grounded (earthed) electrical outlet that is easily accessible at all
times.
Unplug all the power cords from the power supplies to disconnect power to the equipment.
Shock Hazard! Disconnect all power supply cords before servicing.
Do not route the power cord where it can be walked on or pinched by items placed against it.
Pay particular attention to the plug, electrical outlet, and the point where the cord extends from
the server.
WARNING!
To reduce the risk of personal injury from hot surfaces, allow the drives and the internal
system components to cool before touching them.
WARNING!
This server is equipped with high speed fans. Keep away from hazardous moving fan
blades during servicing.
WARNING!
This equipment is not suitable for use in locations where children are likely to be present.
WARNING!
This equipment is intended to be used in Restrict Access Location. The access can only
be gained by Skilled person.
Only authorized by well trained professional person can access the restrict access
location.
CAUTION!
Do not operate the server for long periods with the access panel open or removed.
Operating the server in this manner results in improper airow and improper cooling that can
lead to thermal damage.
Danger of explosion if battery is incorrectly replaced.
Replace only with the same or equivalent type recommended by the manufacturer.
Dispose of used batteries according to the manufacturer’s instructions.
Electrostatic Discharge (ESD)
CAUTION!
ESD CAN DAMAGE DRIVES, BOARDS, AND OTHER PARTS. WE RECOMMEND THAT YOU
PERFORM ALL PROCEDURES AT AN ESD WORKSTATION. IF ONE IS NOT AVAILABLE,
PROVIDE SOME ESD PROTECTION BY WEARING AN ANTI-STATIC WRIST STRAP AT-
TACHED TO CHASSIS GROUND -- ANY UNPAINTED METAL SURFACE -- ON YOUR SERVER
WHEN HANDLING PARTS.
Always handle boards carefully, they can be extremely sensitive to ESD. Hold boards only by
their edges without touching any components or connectors. After removing a board from its
protective ESD bag or from the system, place the board component side up on a grounded, static
free surface. Use a conductive foam pad if available but not the ESD bag. Do not slide the board
over any surface.
System power on/off: To service components within the server, please ensure the power has
been disconnected.
e.g. Remove the node from the server chassis (to disconnect power) or disconnect the power
from the server chassis.
Make sure the system is removed from the rack before opening the chassis, adding, or removing
any non hot-plug components.
Hazardous conditions, devices and cables: Hazardous electrical conditions may be present
on power, telephone, and communication cables. Turn off the system chassis and disconnect the
cables attached to the system before servicing the chassis. Otherwise, personal injury or equip-
ment damage can result.
Electrostatic discharge (ESD) and ESD protection: ESD can damage drives, boards, and
other parts. We recommend that you perform all procedures in this chapter only at an ESD work-
station. If one is not available, provide some ESD protection by wearing an antistatic wrist strap
attached to chassis ground (any unpainted metal surface on the server) when handling parts.
ESD and handling boards: Always handle boards carefully. They can be extremely sensi-tive to
electrostatic discharge (ESD). Hold boards only by their edges. After removing a board from its
protective wrapper or from the system, place the board component side up on a grounded, static
free surface. Use a conductive foam pad if available but not the board wrapper. Do not slide
board over any surface.
Installing or removing jumpers: A jumper is a small plastic encased conductor that slips over
two jumper pins. Some jumpers have a small tab on top that can be gripped with n-gertips or
with a pair of ne needle nosed pliers. If the jumpers do not have such a tab, take care when us-
ing needle nosed pliers to remove or install a jumper; grip the narrow sides of the jumper with the
pliers, never the wide sides. Gripping the wide sides can dam-age the contacts inside the jumper,
causing intermittent problems with the function con-trolled by that jumper. Take care to grip with,
but not squeeze, the pliers or other tool used to remove a jumper, or the pins on the board may
bend or break.
- 7 -
Table of Contents
Chapter 1 Hardware Installation ...................................................................................11
1-1 Installation Precautions .................................................................................. 11
1-2 Product Specications .................................................................................... 12
1-3 System Block Diagram ................................................................................... 17
Chapter 2 System Appearance ..................................................................................... 19
2-1 Front View ...................................................................................................... 19
2-2 Rear View ....................................................................................................... 20
2-3 Front Panel LED and Buttons ........................................................................ 21
2-4 System LAN LEDs ......................................................................................... 22
2-5 Power Supply Unit LED .................................................................................. 23
2-6 Hard Disk Drive LEDs .................................................................................... 24
Chapter 3 System Hardware Installation ......................................................................25
3-1 Installing the Hard Disk Drive ......................................................................... 26
3-2 Removing the Expansion Node ...................................................................... 27
3-3 Removing the Compute Node ........................................................................ 28
3-4 Replacing the Power Supply .......................................................................... 29
3-5 Removing Chassis Middle Cover ................................................................... 30
3-6 Removing and Installing the Fan Duct ........................................................... 31
3-7 Removing and Installing the Heatsink ............................................................ 32
3-8 Installing the CPU .......................................................................................... 34
3-9 Installing Memory ........................................................................................... 35
3-9-1 Eight Channel Memory Conguration .....................................................................35
3-9-2 Installing the Memory ............................................................................................36
3-9-3 Processor and Memory Module Matrix Table .........................................................36
3-9-4 Memory Population Table .......................................................................................37
3-10 Installing the PCI Expansion Card ................................................................. 38
3-10-1 Compute Node .......................................................................................................38
3-10-2 Expansion Node .....................................................................................................39
3-11 Installing the Mezzanine Card ........................................................................ 40
3-11-1 Installing the OCP 3.0 Mezzanine Card .................................................................40
3-12 Installing and Removing an M.2 Solid State Drive ......................................... 41
3-13 Replacing the Fan Assembly .......................................................................... 42
3-14 Cable Routing ................................................................................................ 43
- 8 -
Chapter 4 Motherboard Components ...........................................................................47
4-1 Motherboard Components ............................................................................. 47
4-2 Jumper Setting .............................................................................................. 48
Chapter 5 BIOS Setup ..................................................................................................49
5-1 The Main Menu .............................................................................................. 51
5-2 Advanced Menu ............................................................................................. 53
5-2-1 Trusted Computing .................................................................................................55
5-2-2 PSP Firmware Versions ..........................................................................................56
5-2-3 Legacy Video Select ...............................................................................................57
5-2-4 AST2500 Super IO Conguration ...........................................................................58
5-2-5 S5 RTC Wake Settings ...........................................................................................61
5-2-6 Serial Port Console Redirection .............................................................................62
5-2-7 CPU Conguration ..................................................................................................66
5-2-8 PCI Subsystem Settings .........................................................................................67
5-2-9 USB Conguration ..................................................................................................69
5-2-10 Network Stack Conguration ..................................................................................71
5-2-11 NVMe Conguration ...............................................................................................72
5-2-12 SATA Conguration.................................................................................................73
5-2-13 Graphic Output Conguration .................................................................................74
5-2-14 AMD Mem Conguration Status .............................................................................75
5-2-15 Tls Auth Conguration ............................................................................................76
5-2-16 ISCSI Conguration ................................................................................................77
5-2-17 Intel(R) I350 Gigabit Network Connection ..............................................................78
5-2-18 VLAN Conguration ................................................................................................80
5-2-19 MAC IPv4 Network Conguration ...........................................................................81
5-2-20 MAC IPv6 Network Conguration ...........................................................................82
5-3 AMD CBS Menu ............................................................................................. 83
5-3-1 CPU Common Options ...........................................................................................84
5-3-2 DF Common Options ..............................................................................................89
5-3-3 UMC Common Options ..........................................................................................94
5-3-4 NBIO Common Options ........................................................................................108
5-3-5 FCH Common Options .........................................................................................114
5-3-6 NTB Common Options .........................................................................................118
5-3-7 SOC Miscellaneous Control .................................................................................119
5-3-8 Workload Tuning ...................................................................................................120
5-4 AMD PBS Menu ........................................................................................... 121
5-4-1 RAS ......................................................................................................................122
5-5 Chipset Setup Menu ..................................................................................... 124
5-5-1 North Bridge .........................................................................................................125
5-5-2 Fabric Resource ...................................................................................................126
5-6 Server Management Menu ........................................................................... 127
- 9 -
5-6-1 System Event Log ................................................................................................129
5-6-2 View FRU Information ..........................................................................................130
5-6-3 BMC Network Conguration .................................................................................131
5-6-4 IPv6 BMC Network Conguration .........................................................................132
5-7 Security Menu .............................................................................................. 133
5-7-1 Secure Boot .........................................................................................................134
5-8 Boot Menu .................................................................................................... 136
5-8-1 UEFI NETWORK Drive BBS Priorities ................................................................138
5-8-2 UEFI Application Boot Priorities ................................................................. 139
5-9 Save & Exit Menu ......................................................................................... 140
5-10 BIOS POST Beep code (AMI standard) ....................................................... 141
5-10-1 PEI Beep Codes ...................................................................................................141
5-10-2 DXE Beep Codes .................................................................................................141
This page intentionally left blank
- 11 - Hardware Installation
1-1 Installation Precautions
The motherboard/system contain numerous delicate electronic circuits and components which
can become damaged as a result of electrostatic discharge (ESD). Prior to installation, carefully
read the user manual and follow these procedures:
Prior to installation, do not remove or break motherboard S/N (Serial Number) sticker or
warranty sticker provided by your dealer. These stickers are required for warranty validation.
Always remove the AC power by unplugging the power cord from the power outlet before
installing or removing the motherboard or other hardware components.
When connecting hardware components to the internal connectors on the motherboard,
make sure they are connected tightly and securely.
When handling the motherboard, avoid touching any metal leads or connectors.
It is best to wear an electrostatic discharge (ESD) wrist strap when handling electronic
components such as a motherboard, CPU or memory. If you do not have an ESD wrist
strap, keep your hands dry and rst touch a metal object to eliminate static electricity.
Prior to installing the motherboard, please have it on top of an antistatic pad or within an
electrostatic shielding container.
Before unplugging the power supply cable from the motherboard, make sure the power
supply has been turned off.
Before turning on the power, make sure the power supply voltage has been set according to
the local voltage standard.
Before using the product, please verify that all cables and power connectors of your
hardware components are connected.
To prevent damage to the motherboard, do not allow screws to come in contact with the
motherboard circuit or its components.
Make sure there are no leftover screws or metal components placed on the motherboard or
within the computer casing.
Do not place the computer system on an uneven surface
.
Do not place the computer system in a high-temperature environment.
Turning on the computer power during the installation process can lead to damage to
system components as well as physical harm to the user.
If you are uncertain about any installation steps or have a problem related to the use of the
product, please consult a certied computer technician.
Chapter 1 Hardware Installation
Hardware Installation - 12 -
1-2 Product Specications
Socket
Socket
Security
Security Server Operating Properties
Power SupplySystem fan
CPU AMD EPYC™ 7003 series processor family
Dual processors, 7nm technology
Up to 64-core, 128 threads per processor
cTDP up to 240W
NOTE:
1. If only one CPU is installed, some PCIe or memory functions might be
unavailable
Compatible with AMD EPYC™ 7002 series processor family
Socket
Socket
Security
Security Server Operating Properties
Power SupplySystem fan
Socket Socket SP3
Socket
Socket
Security
Security Server Operating Properties
Power SupplySystem fan
Chipset System on Chip (SoC)
Socket
Socket
Security
Security Server Operating Properties
Power SupplySystem fan
Memory Per Node:
32 x DIMM slots
Total:
128 x DIMM slots
DDR4 memory supported only
8-Channel memory per processor architecture
RDIMM modules up to 128GB supported
LRDIMM modules up to 128GB supported
3DS RDIMM/LRDIMM modules up to 256GB supported
Memory speed: Up to 3200*/ 2933 MHz
Note:
* Follow BIOS setting and memory QVL list if running 3200 Mhz with 2DPC
Socket
Socket
Security
Security Server Operating Properties
Power SupplySystem fan
LAN Per Node:
2 x 1GbE LAN ports (1 x Intel® I350-AM2)
1 x Dedicated management port
Total:
8 x 1GbE LAN ports (1 x Intel® I350-AM2)
4 x Dedicated management ports
Socket
Socket
Security
Security Server Operating Properties
Power SupplySystem fan
Video Integrated in Aspeed® AST2500
2D Video Graphic Adapter with PCIe bus interface
1920x1200@60Hz 32bpp, DDR4 SDRAM
Management chip on CMC board:
Integrated in Aspeed® AST2520A2-GP
NOTE:
We reserve the right to make any changes to the product specications and product-related
information without prior notice.
- 13 - Hardware Installation
Socket
Socket
Security
Security Server Operating Properties
Power SupplySystem fan
Storage Per node:
2 x 2.5" 7mm slim type NVMe/SATA hot-swappable HDD/SSD bays
Total:
8 x 2.5" 7mm slim type NVMe/SATA hot-swappable HDD/SSD bays
Socket
Socket
Security
Security Server Operating Properties
Power SupplySystem fan
Expansion Slots
(H282-ZC0)
Per node:
1 x Low prole half-length slot with PCIe x16 (Gen4 x16 bus) in front side (CPU_0)
2 x Full height half-length slots with PCIe x16 (Gen4 x16 bus) in rear side (CPU_1)
1 x OCP 3.0 mezzanine slot with PCIe Gen4 x16 bandwidth from CPU_0
2 x M.2 slots from CPU_0 and CPU_1:
M-key
PCIe Gen4 x4
Supports NGFF-2260/2280 cards
CPU TDP is limited to 240W if using M.2 device
Total:
4 x Low prole half-length slots with PCIe x16 (Gen4 x16 bus) in front side
(CPU_0)
8 x Full height half-length slots with PCIe x16 (Gen4 x16 bus) in rear side (CPU_1)
4 x OCP 3.0 mezzanine slots with PCIe Gen4 x16 bandwidth from CPU_0
8 x M.2 slots from CPU_0 and CPU_1:
M-key
PCIe Gen4 x4
Supports NGFF-2260/2280 cards
CPU TDP is limited to 240W if using M.2 device
Hardware Installation - 14 -
Socket
Socket
Security
Security Server Operating Properties
Power SupplySystem fan
Expansion Slots
(H282-ZC1)
Per node:
1 x Low prole half-length slot with PCIe x16 (Gen4 x16 bus) in front side (CPU_0)
1 x OCP 3.0 mezzanine slot with PCIe Gen4 x16 bandwidth from CPU_0
2 x M.2 slots from CPU_0 and CPU_1:
M-key
PCIe Gen4 x4
Supports NGFF-2260/2280 cards
CPU TDP is limited to 240W if using M.2 device
Total:
4 x Low prole half-length slots with PCIe x16 (Gen4 x16 bus) in front side
(CPU_0)
4 x OCP 3.0 mezzanine slots with PCIe Gen4 x16 bandwidth from CPU_0
8 x M.2 slots from CPU_0 and CPU_1:
M-key
PCIe Gen4 x4
Supports NGFF-2260/2280 cards
CPU TDP is limited to 240W if using M.2 device
Socket
Socket
Security
Security Server Operating Properties
Power SupplySystem fan
Internal I/O Per Node:
2 x M.2 slots
1 x COM header
1 x TPM header
1 x BMC SGPIO header
1 x JTAG BMC header
1 x PLD header
1 x Clear CMOS jumper
1 x IPMB connector
- 15 - Hardware Installation
Socket
Socket
Security
Security Server Operating Properties
Power SupplySystem fan
Front I/O Per node:
1 x Power button with LED
1 x ID button with LED
1 x Status LED
1 x System reset button
2 x USB 3.0
1 x Mini-DP
2 x RJ45
1 x RJ45 MLAN
Total:
4 x Power button with LED
4 x ID button with LED
4 x Status LED
4 x System reset button
8 x USB 3.0
4 x Mini-DP
8 x RJ45
4 x RJ45 MLAN
Socket
Socket
Security
Security Server Operating Properties
Power SupplySystem fan
Rear I/O 2 x CMC global management ports
Socket
Socket
Security
Security Server Operating Properties
Power SupplySystem fan
Backplane I/O 2 x ports per node
Speed and bandwidth: SATA 6Gb/s or PCIe Gen4 x4 per port
Socket
Socket
Security
Security Server Operating Properties
Power SupplySystem fan
TPM 1 x TPM header with SPI interface
Optional TPM2.0 kit: CTM010
Socket
Socket
Security
Security Server Operating Properties
Power SupplySystem fan
Power Supply 2 x 3200W PSUs
80 PLUS Platinum
Input:
100-127V~/ 14A
220-240V~/ 16A
Output:
1106W@100-127V
2434.5W@200-208V
2828.1W@214-234V
3234W@240V
Hardware Installation - 16 -
Socket
Socket
Security
Security Server Operating Properties
Power SupplySystem fan
System
Management
Aspeed® AST2500 management controller
GIGABYTE Management Console (AMI MegaRAC SP-X) web interface
Dashboard
JAVA Based Serial Over LAN
HTML5 KVM
Sensor Monitor (Voltage, RPM, Temperature, CPU Status …etc.)
Sensor Reading History Data
FRU Information
SEL Log in Linear Storage / Circular Storage Policy
Hardware Inventory
Fan Prole
System Firewall
Power Consumption
Power Control
LDAP / AD / RADIUS Support
Backup & Restore Conguration
Remote BIOS/BMC/CPLD Update
Event Log Filter
User Management
Media Redirection Settings
PAM Order Settings
SSL Settings
SMTP Settings
Socket
Socket
Security
Security Server Operating Properties
Power SupplySystem fan
Ambient
Temperature
Relative
Humidity
Operating temperature: 10°C to 35°C
Operating humidity: 8-80% (non-condensing)
Non-operating temperature: -40°C to 60°C
Non-operating humidity: 20%-95% (non-condensing)
Socket
Socket
Security
Security Server Operating Properties
Power SupplySystem fan
System
Dimension
2U 4 Nodes - Front access
447 (W) x 86.8 (H)x 902 (D) mm
- 17 - Hardware Installation
1-3 System Block Diagram
Please Go to Chapter 4 Motherboard Components for Riser Slot information.
H282-ZC0
H282-ZC1
Hardware Installation - 18 -
This page intentionally left blank
System Appearance - 19 -
Chapter 2 System Appearance
2-1 Front View
No. Decription
1. PCIe Card Slot
2. Mezzanine Card Slot (OCP 3 Card/Option)
3. Mini DP Port
4. GbE LAN Port x 2
5. Server Management LAN Port
6. Front Panel LEDs and Buttons
7. USB 3.0 Port x 2
NOTE! The Green HDD Latch Supports NVMe
Please Go to Chapter 2-3 Front Panel LED and Buttons for detail description of function
LEDs.
1 2 3 4 5 6 7
HDD0
HDD1
NODE1
NODE2
NODE3
NODE4
- 20 - System Appearance
2-2 Rear View
H282-ZC0
H282-ZC1
No. Decription
1. CMC LAN Port
1
NODE3
PCIe 1,2
NODE4
PCIe 1,2
NODE1
PCIe 1,2
NODE2
PCIe 1,2
PSU1
PSU2
1
PSU1
PSU2
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70
  • Page 71 71
  • Page 72 72
  • Page 73 73
  • Page 74 74
  • Page 75 75
  • Page 76 76
  • Page 77 77
  • Page 78 78
  • Page 79 79
  • Page 80 80
  • Page 81 81
  • Page 82 82
  • Page 83 83
  • Page 84 84
  • Page 85 85
  • Page 86 86
  • Page 87 87
  • Page 88 88
  • Page 89 89
  • Page 90 90
  • Page 91 91
  • Page 92 92
  • Page 93 93
  • Page 94 94
  • Page 95 95
  • Page 96 96
  • Page 97 97
  • Page 98 98
  • Page 99 99
  • Page 100 100
  • Page 101 101
  • Page 102 102
  • Page 103 103
  • Page 104 104
  • Page 105 105
  • Page 106 106
  • Page 107 107
  • Page 108 108
  • Page 109 109
  • Page 110 110
  • Page 111 111
  • Page 112 112
  • Page 113 113
  • Page 114 114
  • Page 115 115
  • Page 116 116
  • Page 117 117
  • Page 118 118
  • Page 119 119
  • Page 120 120
  • Page 121 121
  • Page 122 122
  • Page 123 123
  • Page 124 124
  • Page 125 125
  • Page 126 126
  • Page 127 127
  • Page 128 128
  • Page 129 129
  • Page 130 130
  • Page 131 131
  • Page 132 132
  • Page 133 133
  • Page 134 134
  • Page 135 135
  • Page 136 136
  • Page 137 137
  • Page 138 138
  • Page 139 139
  • Page 140 140
  • Page 141 141

Gigabyte H282-ZC0 User manual

Category
Motherboards
Type
User manual
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI