VAT 650 TN Series Owner's manual

Type
Owner's manual

This manual is also suitable for

Installation, Operating & Maintenance Instructions
Series 650 DN 100-250 (I.D. 4“ - 10”), CC-Link
VAT Vakuumventile AG, CH-9469 Haag, Switzerland
Tel +41 81 771 61 61 Fax +41 81 771 48 30 [email protected] www.vatvalve.com 280672EB
2010-12-15 1/94
Pendulum control & isolation valve
with CC-Link interface
with valve cluster functionality
This manual is valid for the valve ordering number(s):
650 . . - . . TL - . . . . (Master / 1 sensor input)
650 . . - . . TN - . . . . (Master / 2 sensor inputs)
650 . . - . . VL - . . . . (Master / 1 sensor input / ±15V SPS)
650 . . - . . VN - . . . . (Master / 2 sensor inputs / ±15V SPS)
650 . . - . . UL - . . . . (Master / 1 sensor input / PFO)
650 . . - . . UN - . . . . (Master / 2 sensor inputs / PFO)
650 . . - . . WL - . . . . (Master / 1 sensor input / ±15V SPS / PFO)
650 . . - . . WN - . . . . (Master / 2 sensor inputs / ±15V SPS / PFO)
650 . . - . . GS - . . . . (Slave)
650 . . - . . HS - . . . . (Slave / PFO)
SPS = Sensor Power Supply PFO = Power Failure Option
Master and Slave are configured with firmware 650C.1E.12
The fabrication number is indicated on each product as per the label
below (or similar):
made in Switzerland
Fabrication No.:
patented
. .
650
. .
. . . . / . . . .
A
. . . . . .
Fabrication number
sample picture
Explanation of symbols:
Read declaration carefully before you start any other
action!
Keep body parts and objects away from the valve
opening!
Attention!
Hot surfaces; do not touch!
Product is in conformity with EC guidelines,
if applicable!
Loaded springs and/or air cushions are potential
hazards!
Disconnect electrical power and compressed air
lines. Do not touch parts under voltage!
Wear gloves!
Read these «Installation, Operating & Maintenance Instructions» and the enclosed «General
Safety Instructions» carefully before you start any other action!
Installation, Operating & Maintenance Instructions
Series 650 DN 100-250 (I.D. 4“ - 10”), CC-Link
VAT Vakuumventile AG, CH-9469 Haag, Switzerland
Tel +41 81 771 61 61 Fax +41 81 771 48 30 [email protected] www.vatvalve.com 280672EB
2010-12-15 2/94
Imprint
VAT Vakuumventile AG, CH-9469 Haag, Switzerland
Manufacturer
Website
www.vatvalve.com
Phone
+41 81 771 61 61
Fax
+41 81 771 48 30
Email
CH@vatvalve.com
Publisher VAT Vakuumventile AG, CH-9469 Haag, Switzerland
Editor VAT Vakuumventile AG, CH-9469 Haag, Switzerland
Print VAT Vakuumventile AG, CH-9469 Haag, Switzerland
Copyright © VAT Vakuumventile AG 2009
No part of these Instructions may be reproduced in any way (photocopies, microfilms or any
other reproduction processes) nor may it be manipulated with electronic systems, duplicated or
distributed without written permission from VAT. Offenders are liable to pay damages.
The original VAT firmware and updated state of the art versions of the VAT firmware are
intended for use with VAT products. The VAT firmware contains a limited, time unlimited user
license. The VAT firmware may not be used for purposes other than those intended nor is it
permitted to make copies of the VAT firmware. In particular, it is strictly forbidden to give
copies of the VAT firmware to other people.
The use of trade names, brand names, trademarks, etc. in these Instructions does not entitle
third parties to consider these names to be unprotected and to use them freely. This is in
accordance with the meaning of the laws and acts covering brand names and trademarks.
Installation, Operating & Maintenance Instructions
Series 650 DN 100-250 (I.D. 4“ - 10”), CC-Link
VAT Vakuumventile AG, CH-9469 Haag, Switzerland
Tel +41 81 771 61 61 Fax +41 81 771 48 30 [email protected] www.vatvalve.com 280672EB
2010-12-15 3/94
Contents:
1 Use of product .......................................................................................................................................................... 5
1.1 Technical data ................................................................................................................................................. 5
2 Installation................................................................................................................................................................. 8
2.1 Unpacking........................................................................................................................................................ 8
2.2 Installation into the system .............................................................................................................................. 8
2.3 Tightening torque........................................................................................................................................... 10
2.3.1 Mounting with centering rings............................................................................................................ 10
2.3.2 Mounting with O-ring in grooves........................................................................................................ 11
2.4 Admissible forces........................................................................................................................................... 11
2.5 Requirements to sensor connection.............................................................................................................. 12
2.6 Electrical connection...................................................................................................................................... 13
2.6.1 Ground connection............................................................................................................................ 13
2.6.2 Sensor supply concepts.................................................................................................................... 14
2.6.3 Power and sensor connection (+24 VDC sensors)............................................................................ 15
2.6.4 Power and sensor connection (±15 VDC sensors) without optional SPS module.............................17
2.6.5 Power and sensor connection (±15 VDC sensors) with optional SPS module.................................. 19
2.6.6 Power connection for Slave valve only.............................................................................................. 20
2.6.7 CC-Link interface connection............................................................................................................ 21
2.6.8 Logic I/O............................................................................................................................................ 26
2.6.9 Service port connection..................................................................................................................... 26
2.6.10 Valve cluster connection ................................................................................................................... 27
3 Operation................................................................................................................................................................ 30
3.1 Introduction.................................................................................................................................................... 30
3.1.1 Individual valve control...................................................................................................................... 31
3.1.2 Individual valve status ....................................................................................................................... 31
3.1.3 Freeze mode ..................................................................................................................................... 31
3.1.4 Position offset.................................................................................................................................... 31
3.1.5 Local operation.................................................................................................................................. 32
3.1.6 Remote operation.............................................................................................................................. 32
3.1.7 Safety mode ...................................................................................................................................... 33
3.2 Operation under increased temperature........................................................................................................ 33
3.3 Behavior during power up.............................................................................................................................. 33
3.4 Behavior in case of power failure................................................................................................................... 33
3.5 Display information ........................................................................................................................................ 34
3.5.1 CC-Link LEDs.................................................................................................................................... 36
3.6 Setup procedure............................................................................................................................................ 37
3.6.1 Cluster address configuration............................................................................................................ 37
3.6.2 CC-Link configuration........................................................................................................................ 41
3.6.3 Valve and sensor configuration......................................................................................................... 46
3.6.4 ZERO................................................................................................................................................. 48
3.6.5 LEARN............................................................................................................................................... 49
3.7 Close valve .................................................................................................................................................... 50
3.8 Open valve..................................................................................................................................................... 50
3.9 Position control.............................................................................................................................................. 51
3.10 Pressure control............................................................................................................................................. 51
3.10.1 Tuning of control performance........................................................................................................... 52
3.11 CC-Link interface........................................................................................................................................... 56
3.11.1 Schematics........................................................................................................................................ 56
3.11.2 Digital input........................................................................................................................................ 57
3.11.3 Digital output ..................................................................................................................................... 57
3.11.4 CC-Link Handshaking........................................................................................................................ 58
3.11.5 Location of the handshaking bits....................................................................................................... 59
3.11.6 Example of the handshaking by a PLC-program............................................................................... 60
3.11.7 OUTPUT Buffer (Master PLC)........................................................................................................... 61
3.11.8 INPUT Buffer (Master PLC)............................................................................................................... 65
3.11.9 Communication and timing control between Master (PLC) and Station (Valve)................................71
Installation, Operating & Maintenance Instructions
Series 650 DN 100-250 (I.D. 4“ - 10”), CC-Link
VAT Vakuumventile AG, CH-9469 Haag, Switzerland
Tel +41 81 771 61 61 Fax +41 81 771 48 30 [email protected] www.vatvalve.com 280672EB
2010-12-15 4/94
3.11.10 PRESSURE and SENSOR READING allocation ..............................................................................72
4 Trouble shooting..................................................................................................................................................... 73
4.1 Additional CC-Link warning............................................................................................................................ 75
5 Maintenance & repairs............................................................................................................................................ 76
5.1 Maintenance procedures............................................................................................................................... 77
5.2 Option board.................................................................................................................................................. 84
5.2.1 Durability of power fail battery........................................................................................................... 84
5.2.2 Retrofit / replacement procedure....................................................................................................... 85
6 Drawing................................................................................................................................................................... 89
7 Spare parts............................................................................................................................................................. 90
7.1 Control unit .................................................................................................................................................... 90
7.2 Valve unit....................................................................................................................................................... 91
7.3 Accessories ................................................................................................................................................... 92
7.3.1 Centering ring with Viton o-ring......................................................................................................... 93
8 Warranty................................................................................................................................................................. 94
Installation, Operating & Maintenance Instructions
Series 650 DN 100-250 (I.D. 4“ - 10”), CC-Link
VAT Vakuumventile AG, CH-9469 Haag, Switzerland
Tel +41 81 771 61 61 Fax +41 81 771 48 30 [email protected] www.vatvalve.com 280672EB
2010-12-15 5/94
1 Use of product
This product is a throttling pendulum valve with isolation functionality. It is intended to use for downstream pressure
control applications.
Use product for clean and dry indoor vacuum applications under the conditions indicated in chapter «Technical data» only!
Other applications are only allowed with the written permission of VAT.
1.1 Technical data
Control and actuating unit
Power input 1) (α) +24 VDC (±10%) @ 0.5 V pk-pk max. [connector: POWER]
[650 . . - . . A . - . . . . / 650 . . - . . G . - . . . . ]
[650 . . - . . C . - . . . . / 650 . . - . . H . - . . . . ]
50 W max. (operation of valve with max. load) without PFO 4)
50 W plus 10 W for PFO 4)
Sensor power supply 2) (β)
[650 . . - . . A . - . . . . / 650 . . - . . C . - . . . . ]
Input
Output
+24 VDC / 1500 mA max.
±15 VDC (±5%) / 1000 mA max.
[connector: POWER]
[connector: SENSOR]
Sensor power supply 2) (β)
[650 . . - . . G . - . . . . / 650 . . - . . H . - . . . . ]
Input
Output
+ 24 VDC resp. ± 15 VDC
same as input but:
2.0 A max. at ± 15 VDC
1.5 A max. at + 24 VDC
[connector: POWER]
[connector: SENSOR]
Calculation of complete power consumption:
Ptot = α + β
whereas depends on sensor supply concept and sensor power consumption.
Installation, Operating & Maintenance Instructions
Series 650 DN 100-250 (I.D. 4“ - 10”), CC-Link
VAT Vakuumventile AG, CH-9469 Haag, Switzerland
Tel +41 81 771 61 61 Fax +41 81 771 48 30 [email protected] www.vatvalve.com 280672EB
2010-12-15 6/94
Control and actuating unit (continuation)
Sensor input
Signal input
ADC resolution
Sampling time
0-10 VDC / Ri>100 k
0.23 mV
10 ms
[connector: SENSOR]
Digital outputs 3)
Input voltage
Input current
70 VDC or 70 V peak max.
0.1 ADC or 0.1 A peak max.
[connector: LOGIC I/O]
PFO 4) battery pack
[650 . . - . . C . - . . . . / 650 . . - . . H . - . . . . ]
Charging time
Durability
2 minutes max.
up to 10 years @ 25°C ambient;
refer to «Durability of power fail battery» for details
Compressed air supply
4 - 7 bar / 55 - 100 psi (above ATM)
Ambient temperature
0 °C to +50 °C max. (<35 °C recommended)
Pressure control accuracy
0.1% of sensor full scale
DN 100
4"
(65040 - ....)
DN 160
6"
(65044 - ....)
DN 200
8"
(65046 - ....)
DN 250
10"
(65048 - ....)
Position resolution / position control capability
9155 steps
(full stroke) 11111 steps
(full stroke) 12266 steps
(full stroke) 12533 steps
(full stroke)
Closing time throttling only
0.7 s typ. (full
stroke) 0.8 s typ. (full
stroke) 0.9 s typ. (full
stroke) 0.9 s typ. (full
stroke)
Opening time throttling only
0.7 s typ. (full
stroke) 0.8 s typ. (full
stroke) 0.9 s typ. (full
stroke) 0.9 s typ. (full
stroke)
Closing time throttling & isolation
3 s typ. (full
stroke) 3 s typ. (full
stroke) 3 s typ. (full
stroke) 3 s typ. (full
stroke)
Opening time throttling & isolation
4 s typ. (full
stroke) 4 s typ. (full
stroke) 4 s typ. (full
stroke) 4 s typ. (full
stroke)
1) Internal overcurrent protection by a PTC device.
2) Refer to chapter «Sensor supply concepts» for details.
3) Refer to chapter «Schematics» for details.
4) PFO = Power Failure Option. Refer to «Behavior in case of power failure» for details.
Installation, Operating & Maintenance Instructions
Series 650 DN 100-250 (I.D. 4“ - 10”), CC-Link
VAT Vakuumventile AG, CH-9469 Haag, Switzerland
Tel +41 81 771 61 61 Fax +41 81 771 48 30 [email protected] www.vatvalve.com 280672EB
2010-12-15 7/94
Valve unit
Pressure range at 20°C
- Aluminum (650 . . - . A . . - . . . . ) 1 x 10E-8 mbar to 1.2 bar (abs)
- Aluminum hard anodized (650 . . - . H . . - . . . . ) 1 x 10E-6 mbar to 1.2 bar (abs)
- Aluminum nickel coated (650 . . - . I . . - . . . . )
1 x 10E-8 mbar to 1.2 bar (abs)
Leak rate to outside at 20°C
- Aluminum (650 . . - . A . . - . . . . ) 1 x 10E-9 mbar l/s
- Aluminum hard anodized (650 . . - . H . . - . . . . ) 1 x 10E-5 mbar l/s
- Aluminum nickel coated (650 . . - . I . . - . . . . )
1 x 10E-9 mbar l/s
Leak rate valve seat at 20°C
- Aluminum (650 . . - . A . . - . . . . ) 1 x 10E-9 mbar l/s
- Aluminum hard anodized (650 . . - . H . . - . . . . ) 1 x 10E-4 mbar l/s
- Aluminum nickel coated (650 . . - . I . . - . . . . )
1 x 10E-9 mbar l/s
Cycles until first service
- Isolation cycles (open - closed - open)
- Throttling cycles (open - max. throttle - open)
200’000 (unheated and under clean conditions)
1’000’000 (unheated and under clean conditions)
Admissible operating temperature
10°C to +150°C
Mounting position
any (valve seat on chamber side is recommended) (valve seat to face
chamber is recommended)
Wetted materials
- Body (650 . . - . A . . - . . . . ) Aluminum 3.2315 (AA6082)
- Body (650 . . - . H . . - . . . . ) Aluminum 3.2315 (AA6082) hard anodized
- Body (650 . . - . I . . - . . . . ) Aluminum 3.2315 (AA6082) nickel coated
- Pendulum plate (650 . . - . A . . - . . . . ) Aluminum 3.2315 (AA6082)
- Pendulum plate (650 . . - . H . . - . . . . ) Aluminum 3.2315 (AA6082) hard anodized
- Pendulum plate (650 . . - . I . . - . . . . ) Aluminum 3.2315 (AA6082) nickel coated
- Sealing ring (650 . . - . A . . - . . . . ) Aluminum 3.2315 (AA6082), 1.4306 (304L)
- Sealing ring (650 . . - . H . . - . . . . ) Aluminum 3.2315 (AA6082) hard anodized, 1.4306 (304L)
- Sealing ring (650 . . - . I . . - . . . . ) Aluminum 3.2315 (AA6082) nickel coated, 1.4306 (304L)
- Other parts Stainless steel 316L (1.4404 or 1.4435), 1.4122, 1.4310 (301),
1.4303 (304), 1.4571, A2 (304)
- Seals Viton® (standard). Other materials available.
Seal materials are declared on dimensional drawing of specific valve ordering
number.
DN 100
4"
(65040 - ....)
DN 160
6"
(65044 - ....)
DN 200
8"
(65046 - ....)
DN 250
10"
(65048 - ....)
Max. differential pressure on plate during isolation
1200 mbar in
either direction 1200 mbar in
either direction 1200 mbar in
either direction 1200 mbar in
either direction
Max. differential pressure on plate
during opening and throttling
30 mbar 10 mbar 5 mbar 5 mbar
Min. controllable conductance
(N2 molecular flow)
3 l/s 5 l/s 10 l/s 15 l/s
Dimensions Refer to dimensional drawing of specific valve ordering number
(available on request)
Installation, Operating & Maintenance Instructions
Series 650 DN 100-250 (I.D. 4“ - 10”), CC-Link
VAT Vakuumventile AG, CH-9469 Haag, Switzerland
Tel +41 81 771 61 61 Fax +41 81 771 48 30 [email protected] www.vatvalve.com 280672EB
2010-12-15 8/94
2 Installation
2.1 Unpacking
As this valve is a heavy component you should lift it with adequate equipment to prevent any injury to
humans.
Valves DN200 (8”) and larger are equipped with attachment points (tapped holes). Add eyebolts to
these attachment points for lifting. The attachment points are indicated on the dimensional drawing of
the specific valve part number (available on request).
Never lay the valve down with control and actuating unit downwards as it may be damaged.
2.2 Installation into the system
Connectors at controller panel:
Connection overview:
Fingers and objects must be kept out of
the valve opening and away from moving
parts.
The valve plate starts to move just after
power is supplied.
Do not connect or disconnect sensor cable
when device is under power.
Do not disconnect air supply when device is
under power.
Compressed air pressure must be in the range
of: 4 - 7 bar / 55 - 100 psi (above ATM).
Use only clean, dry or slightly oiled air.
Master Slave
[6] Link cable
[6] Link to next Slave
Installation, Operating & Maintenance Instructions
Series 650 DN 100-250 (I.D. 4“ - 10”), CC-Link
VAT Vakuumventile AG, CH-9469 Haag, Switzerland
Tel +41 81 771 61 61 Fax +41 81 771 48 30 [email protected] www.vatvalve.com 280672EB
2010-12-15 9/94
1. Install valves [1] into the vacuum system. Valve seat side should face process chamber. The valve seat side is
indicated by the symbol "" on the valve flange.
Caution: Do not tighten the flange screws stronger than indicated under «Tightening torque».
Caution: Do not admit higher forces to the valve than indicated under «Admissible forces».
Note: Make sure that enough space is kept free to do preventive maintenance work. The required space is indicated
on the dimensional drawing.
2. Install the ground connection cable at controller. Refer to «Electrical connection»
3. Connect compressed air supply to connection labeled ‘IN’ located at actuator, see Figure 1 below.
Connect compressed air return line connection labeled ‘OUT’ located at actuator, see Figure 1 below.
Caution: Compressed air pressure must be in the range of: 4 - 7 bar / 55 - 100 psi (above ATM).
Note: Use only clean, dry or slightly oiled air. IN / OUT connections are 1/8“ ISO/NPT internal threads.
4. Install pressure sensor(s) [2] according to the recommendations of the sensor manufacturer and directives given
under
«Requirements to sensor connection».
Note: Input for second sensor is available on 650 . . - . . . N versions.
5. Connect sensor cable [3] to sensor(s) and then to Master valve (connector: SENSOR).
Refer to chapter «Electrical connection» for correct wiring.
6. Connect Master valve to CC-Link [4] (connector: INTERFACE). Refer to «CC-Link schematics» for correct wiring.
7. Enable terminating resistor in link adapter of first and last valve in the system. Refer to «Valve cluster connection» for
details.
8. Connect link cable [6] between Slave valve(s) and Master valve (link adapter). Refer to «Valve cluster connection» for
correct wiring.
9. Connect power supply [5] to each valve (connector: POWER). Refer to chapter «Electrical connection» for correct
wiring.
Note: To provide power to the valve motor pins 4 and 8 must be bridged, otherwise motor interlock is active and the
valve enters the safety mode and is not operative. Refer also to «Safety mode».
10. This valve has a double sealed rotary feedthrough and optionally an intermediate pumping port for the actuator shaft.
This port (1/8“ ISO/NPT) could be connected to the vacuum line, see Figure 2 below.
11. These valves may optionally be equipped with a heating device. Connect VAT heating device according to manual of
respective heating device.
12. Perform «Setup procedure» to prepare valve cluster for operation.
Note: Without performing the setup procedure the valve cluster will not be able to do pressure control.
Fig. 1 Fig. 2
intermediate
pumping port
IN
OUT
Installation, Operating & Maintenance Instructions
Series 650 DN 100-250 (I.D. 4“ - 10”), CC-Link
VAT Vakuumventile AG, CH-9469 Haag, Switzerland
Tel +41 81 771 61 61 Fax +41 81 771 48 30 [email protected] www.vatvalve.com 280672EB
2010-12-15 10/94
2.3 Tightening torque
Note:
The torque values below are dependent on many factors, such as materials involved, surface quality, surface treatment,
and lubrication.
The torques below are valid if immersion depth of the mounting screws is at least once the thread diameter (min. 1d), and
the friction coefficient of the screw-flange connection (µtotal = (µscrew thread-helicoil + µunder screw head)/2) is bigger than 0.12. Lower
friction coefficients may damage the valve, as the resulting preload force gets too high. Therefore for other friction
coefficients the torque needs to be adapted. Please review design guidelines for Helicoil-Screw connections and make
sure that screws in use are capable to withstand applied torques, are appropriate for the application and are not too long.
Too long screws may damage the valve, the immersion depth should not exceed (hole depth – 1 mm).
Tighten mounting screws of the flanges uniformly in crosswise order. Observe the maximum torque levels in the following
tables.
2.3.1 Mounting with centering rings
ISO-F ISO-F
Valve size max. tightening torque
(Nm) max. tightening torque
(lbs . ft)
DN100 / 4“
(65040 - . . . . - . . . . ) 8-10 6-8
DN160 / 6“
(65044 - . . . . - . . . . ) 13-15 9-11
DN200 / 8“
(65046 - . . . . - . . . . ) 13-15 9-11
DN250 / 10“
(65048 - . . . . - . . . . ) 17-20 13-15
hole depth (mm) hole depth (inch)
DN100 / 4“
(65040 - . . . . - . . . . ) 12 0.47
DN160 / 6“
(65044 - . . . . - . . . . ) 14 0.55
DN200 / 8“
(65046 - . . . . - . . . . ) 15 0.59
DN250 / 10“
(65048 - . . . . - . . . . ) 16 0.63
Refer to «Spare parts and accessories» for centering rings ordering numbers.
Installation, Operating & Maintenance Instructions
Series 650 DN 100-250 (I.D. 4“ - 10”), CC-Link
VAT Vakuumventile AG, CH-9469 Haag, Switzerland
Tel +41 81 771 61 61 Fax +41 81 771 48 30 [email protected] www.vatvalve.com 280672EB
2010-12-15 11/94
2.3.2 Mounting with O-ring in grooves
ISO-F JIS ASA-LP
ISO-F JIS ASA-LP
Valve size max. tightening torque
(Nm) max. tightening torque
(lbs . ft)
DN100 / 4“
(65040 - . . . . - . . . . ) 20-23 35-40 35-40 15-17 26-30 26-30
DN160 / 6“
(65044 - . . . . - . . . . ) 35-40 35-40 35-40 26-30 26-30 26-30
DN200 / 8“
(65046 - . . . . - . . . . ) 35-40 35-40 80-90 26-30 26-30 59-67
DN250 / 10“
(65048 - . . . . - . . . . ) 35-41 65-70 80-90 26-30 48-52 59-67
hole depth (mm) hole depth (inch)
DN100 / 4“
(65040 - . . . . - . . . . ) 12 12 12 0.47 0.47 0.47
DN160 / 6“
(65044 - . . . . - . . . . ) 14 14 14 0.55 0.55 0.55
DN200 / 8“
(65046 - . . . . - . . . . ) 15 15 14 0.59 0.59 0.59
DN250 / 10“
(65048 - . . . . - . . . . ) 16 16 16 0.63 0.63 0.63
2.4 Admissible forces
Forces from evacuating the system, from the weight of other components, and from baking can lead to deformation and
malfunctioning of the valve. Stress has to be relieved by suitable means, e.g. bellows sections.
Axial tensile or
compressive force «FA»
Bending moment «M»
Valve size N lb. Nm lbf.
DN100 / 4“
(65040 - . . . . - . . . . ) 1000 220 40 30
DN160 / 6“
(65044 - . . . . - . . . . ) 2000 440 80 60
DN200 / 8“
(65046 - . . . . - . . . . ) 2000 440 80 60
DN250 / 10“
(65048 - . . . . - . . . . ) 2500 550 100 75
For a combination of both forces (FA and M) the values are invalid.
Verify that the depth of the mounting screws is min. 1 x thread diameter.
Please contact VAT for more information.
F
A
M
Installation, Operating & Maintenance Instructions
Series 650 DN 100-250 (I.D. 4“ - 10”), CC-Link
VAT Vakuumventile AG, CH-9469 Haag, Switzerland
Tel +41 81 771 61 61 Fax +41 81 771 48 30 [email protected] www.vatvalve.com 280672EB
2010-12-15 12/94
2.5 Requirements to sensor connection
To achieve fast and accurate pressure control a fast
sensor response is required.
Sensor response time: < 50ms
The sensor is normally connected to the chamber by a
pipe. To maintain that the response time is not degraded
by this connection it needs to meet the following
requirements:
Inner diameter of connection pipe: > = 10 mm
Length of connection pipe: < = 300 mm
These conductance guidelines must include all valves
and limiting orifices that may also be present.
Make also sure that there is no obstruction in front of
sensor connection port inside the chamber.
The sensor should also be mounted free of mechanical
shock and vibration.
Dynamic stray magnetic fields may introduce noise to
sensor output and should be avoided or shielded.
Installation, Operating & Maintenance Instructions
Series 650 DN 100-250 (I.D. 4“ - 10”), CC-Link
VAT Vakuumventile AG, CH-9469 Haag, Switzerland
Tel +41 81 771 61 61 Fax +41 81 771 48 30 [email protected] www.vatvalve.com 280672EB
2010-12-15 13/94
2.6 Electrical connection
2.6.1 Ground connection
Recommendation for ground strap between controller and system (chassis)
Material L (Length max.) B1 (min.) B2 (min.) d1 () d2 ()
copper tinned 200 mm 25 mm 25 mm 4.5 mm customized
Note: Connection plates of ground strap must be total plane for a good electrical contact!
Note: The connection point at chassis (PE) must be blank metal (not coated).
It is also possible to connect the ground strap at system chamber if it is well connected to PE.
Note: Avoid low chassis cross section to the system PE connection. (Min. same cross section as ground strap)
d1
B1
Controller Master Controller Slave(s)
Recommendation
ground connection
Slave: AWG 12
(3mm2)
System
Chassis (PE)
(Protective Earth)
B2
d2
L
Ground strap PE
Installation, Operating & Maintenance Instructions
Series 650 DN 100-250 (I.D. 4“ - 10”), CC-Link
VAT Vakuumventile AG, CH-9469 Haag, Switzerland
Tel +41 81 771 61 61 Fax +41 81 771 48 30 [email protected] www.vatvalve.com 280672EB
2010-12-15 14/94
2.6.2 Sensor supply concepts
This valve offers 3 alternative concepts to supply the sensor(s) with power. This depends on the sensor type and valve
version that is used. This valve is available with an optional sensor power supply module (SPS) that converts ±15 VDC
from the 24 VDC.
Concepts:
External + 24 VDC supplied to POWER connector is feed through to SENSOR connector to supply 24 VDC
sensors. Refer to chapter «2.6.3 Power and sensor connection (+24 VDC sensors)» for schematic and correct
wiring.
External ±15 VDC supplied to POWER connector is feed through to SENSOR connector to supply ±15 VDC
sensors. Refer to chapter «2.6.4 Power and sensor connection (±15 VDC sensors) without optional SPS module»
for schematic and correct wiring.
External + 24 VDC supplied to POWER connector is converted into ±15 VDC by the valve internal SPS and
supplied to SENSOR connector to supply ±15 VDC sensors. Refer to chapter «2.6.5 Power and sensor
connection (±15 VDC sensors) with optional SPS module» for schematic and correct wiring.
Valve versions:
650 . . - . . T . - . . . . / 650 . . - . . U . - . . . . SPS module not included
650 . . - . . V . - . . . . / 650 . . - . . W . - . . . . SPS module included
650 . . - . . . S - . . . . slave valve, no sensor connection
Note: The SPS module can be retrofitted. Refer to chapter «Retrofit / replacement procedure» for instruction.
Installation, Operating & Maintenance Instructions
Series 650 DN 100-250 (I.D. 4“ - 10”), CC-Link
VAT Vakuumventile AG, CH-9469 Haag, Switzerland
Tel +41 81 771 61 61 Fax +41 81 771 48 30 [email protected] www.vatvalve.com 280672EB
2010-12-15 15/94
2.6.3 Power and sensor connection (+24 VDC sensors)
[650 . . - . . T . - . . . . / 650 . . - . . U . - . . . . versions recommended]
2.6.3.1 Sensor power wiring via controller
Note:
Use shielded sensor cable(s). Keep cable as short as possible, but locate it away from noise sources.
Connect the +24 VDC sensors at DB–15 female sensor connector exactly as shown in the drawing above. Do not
connect other pins, that may damage power supply or controller!
Connector: Use only screws with 4-40UNC thread for fastening the connectors!
Pins 4 and 8 must be bridged for operation!
An optional switch would allow for motor interlock
to prevent valve from moving.
Low range sensor may be connected
to sensor 1 or sensor 2 input.
Do configuration accordingly.
Installation, Operating & Maintenance Instructions
Series 650 DN 100-250 (I.D. 4“ - 10”), CC-Link
VAT Vakuumventile AG, CH-9469 Haag, Switzerland
Tel +41 81 771 61 61 Fax +41 81 771 48 30 [email protected] www.vatvalve.com 280672EB
2010-12-15 16/94
2.6.3.2 Sensor power wiring external
Note:
Use shielded sensor cable(s). Keep cable as short as possible, but locate it away from noise sources.
Connect the +24 VDC sensors at DB–15 female sensor connector exactly as shown in the drawing above. Do not
connect other pins, that may damage power supply or controller!
Connector: Use only screws with 4-40UNC thread for fastening the connectors!
Low range sensor may be connected
to sensor 1 or sensor 2 input.
Do configuration accordingly.
Pins 4 and 8 must be bridged for operation!
An optional switch would allow for motor interlock
to prevent valve from moving.
Installation, Operating & Maintenance Instructions
Series 650 DN 100-250 (I.D. 4“ - 10”), CC-Link
VAT Vakuumventile AG, CH-9469 Haag, Switzerland
Tel +41 81 771 61 61 Fax +41 81 771 48 30 [email protected] www.vatvalve.com 280672EB
2010-12-15 17/94
2.6.4 Power and sensor connection (±15 VDC sensors) without optional SPS module
[650 . . - . . T . - . . . . / 650 . . - . . U . - . . . . versions only
2.6.4.1 Sensor power wiring via controller
Note:
Use shielded sensor cable(s). Keep cable as short as possible, but locate it away from noise sources.
Connect the ±15 VDC sensors at DB–15 female sensor connector exactly as shown in the drawing above.
Do not connect other pins, that may damage power supply or controller!
Connector: Use only screws with 4-40UNC thread for fastening the connectors!
Pins 4 and 8 must be bridged for operation!
An optional switch would allow for motor interlock to
prevent valve from moving.
Low range sensor may be connected
to sensor 1 or sensor 2 input.
Do configuration accordingly.
Fuse 1A
Fuse 1A
Installation, Operating & Maintenance Instructions
Series 650 DN 100-250 (I.D. 4“ - 10”), CC-Link
VAT Vakuumventile AG, CH-9469 Haag, Switzerland
Tel +41 81 771 61 61 Fax +41 81 771 48 30 [email protected] www.vatvalve.com 280672EB
2010-12-15 18/94
2.6.4.2 Sensor power wiring external
Note:
Use shielded sensor cable(s). Keep cable as short as possible, but locate it away from noise sources.
Connect the ±15 VDC sensors at DB–15 female sensor connector exactly as shown in the drawing above. Do not
connect other pins, that may damage power supply or controller!
Connector: Use only screws with 4-40UNC thread for fastening the connectors!
Low range sensor may be connected
to sensor 1 or sensor 2 input.
Do configuration accordingly.
Pins 4 and 8 must be bridged for operation!
An optional switch would allow for motor interlock
to prevent valve from moving.
Installation, Operating & Maintenance Instructions
Series 650 DN 100-250 (I.D. 4“ - 10”), CC-Link
VAT Vakuumventile AG, CH-9469 Haag, Switzerland
Tel +41 81 771 61 61 Fax +41 81 771 48 30 [email protected] www.vatvalve.com 280672EB
2010-12-15 19/94
2.6.5 Power and sensor connection (±15 VDC sensors) with optional SPS module
[650 . . - . . V . - . . . . / 650 . . - . . W . - . . . . versions only]
Note:
Use shielded sensor cable(s). Keep cable as short as possible, but locate it away from noise sources.
Connect the ±15 VDC sensors at DB–15 female sensor connector exactly as shown in the drawing above.
Do not connect other pins, that may damage power supply or controller!
Connector: Use only screws with 4-40UNC thread for fastening the connectors!
Low range sensor may be connected
to sensor 1 or sensor 2 input.
Do configuration accordingly.
Pins 4 and 8 must be bridged for operation!
An optional switch would allow for motor interlock
to prevent valve from moving.
Installation, Operating & Maintenance Instructions
Series 650 DN 100-250 (I.D. 4“ - 10”), CC-Link
VAT Vakuumventile AG, CH-9469 Haag, Switzerland
Tel +41 81 771 61 61 Fax +41 81 771 48 30 [email protected] www.vatvalve.com 280672EB
2010-12-15 20/94
2.6.6 Power connection for Slave valve only
[650 . . - . . . S - . . . . or valves configured as slave]
Note: Do not connect other pins, that may damage power supply or controller!
Connector: Use only screws with 4-40UNC thread for fastening the connectors!
Pins 4 and 8 must be
bridged for operation!
An optional switch would allow
for motor interlock to prevent
valve from moving.
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70
  • Page 71 71
  • Page 72 72
  • Page 73 73
  • Page 74 74
  • Page 75 75
  • Page 76 76
  • Page 77 77
  • Page 78 78
  • Page 79 79
  • Page 80 80
  • Page 81 81
  • Page 82 82
  • Page 83 83
  • Page 84 84
  • Page 85 85
  • Page 86 86
  • Page 87 87
  • Page 88 88
  • Page 89 89
  • Page 90 90
  • Page 91 91
  • Page 92 92
  • Page 93 93
  • Page 94 94

VAT 650 TN Series Owner's manual

Type
Owner's manual
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI