Open the both hangers from cable
manager.
Assemble the cable manager and,
Fix the panel to the rack.
Connect the gorunding wire between the
panel and rack.
1
1
Top-Entry Tool-less Keystone Jack
Installation Instructions
1U-24 Port Feed-Through Patch Panel
Fix the grounding wire to the panel.
2
3
4