Tripp Lite 1U-24 Port Feed-Through Patch Panel Installation guide

Category
Patch panels
Type
Installation guide
Open the both hangers from cable
manager.
Assemble the cable manager and,
Fix the panel to the rack.
Connect the gorunding wire between the
panel and rack.
1
1
Top-Entry Tool-less Keystone Jack
Installation Instructions
1U-24 Port Feed-Through Patch Panel
Fix the grounding wire to the panel.
2
3
4
  • Page 1 1

Tripp Lite 1U-24 Port Feed-Through Patch Panel Installation guide

Category
Patch panels
Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI