Owner’s Manual for 50 Hz Air-Cooled Generator Sets v
Section 1: Safety Information
Introduction ..........................................................1
Read This Manual Thoroughly ....................................1
Safety Messages ..................................................1
Safety and Informational Decals ........................2
Safety Rules .........................................................5
General Safety ............................................................5
Installation ...................................................................6
Operation .....................................................................7
Maintenance ................................................................7
Hot Surfaces .........................................................9
Before You Begin ...............................................10
Standards Index ........................................................10
Section 2: Unpacking and Inspection
General ...............................................................11
Required Tools ...................................................11
Unpacking ..........................................................11
Opening The Lid ........................................................12
Enclosure Panel Removal .........................................12
Front Access Panel Removal ....................................12
Intake Side Panel Removal .......................................13
Customer Connections and Loose Parts ........13
Rear Connections ..............................................13
Generator Main Line Circuit Breaker ...............14
Parts Shipped Loose .........................................14
Section 3: Site Selection and Preparation
Site Selection .....................................................15
Carbon Monoxide ..............................................15
Carbon Monoxide Detectors ......................................15
Potential CO Entry Points ..........................................16
Protect the Structure .................................................16
Fire Prevention ...................................................17
Distance Requirements .............................................17
Fire Codes, Standards, and Guidelines .....................18
Generator Set Maintenance ......................................18
Fresh Air for Ventilation and Cooling ..............19
Water Ingress Avoidance ..................................19
Proximity to Utilities ..........................................19
Verify Wi-Fi Range ....................................................19
Transportation Recommendations ..................19
Suitable Mounting Surface ............................... 19
Placement on Roofs, Platforms, and
Other Supporting Structures ............................19
Section 4: Generator Set Placement
Generator Set Weight (kg / lb) ..........................21
Lifting Instructions ............................................21
Generator Set Placement .................................. 21
Section 5: Fuel Conversion / Gas
Connections
Fuel Requirements and Recommendations ....23
BTU Content ..............................................................23
Fuel Pressure ............................................................23
Fuel Conversion ................................................23
Fuel Consumption .............................................24
Fuel Line Sizing .................................................24
Natural Gas Pipe Sizing ............................................25
LP Gas Pipe Sizing ...................................................25
Installing and Connecting Fuel Lines ..............26
Fuel Shutoff Valve .....................................................26
Flexible Fuel Line ......................................................26
Sediment Trap ...........................................................26
Checking Fuel Line Connections .....................27
Checking Fuel Pressure ............................................27
Performing Fuel System Leak Test ...........................27
Natural Gas Installation (Typical)..................... 28
LP Gas (Vapor) Installation (Typical)............... 29
Section 6: Electrical Connections
Generator Set Connections ..............................31
Control Wiring .................................................... 32
Main AC Wiring ..................................................33
Common Alarm Relay (Option) ........................ 33
Battery Requirements ....................................... 33
Battery Installation ............................................34
Connecting Battery ....................................................34
Battery Disposal ................................................35
Table of Contents