DS210

HAMILTON SINKLER DS210 User manual

  • Hello! I've reviewed the user manual for the Floor Stop AC84. This document provides detailed instructions on how to install this floor stop, including drilling and securing it. It also highlights the importance of avoiding underfloor heating systems during installation. I'm ready to answer any questions you have about this product.
  • What size drill hole is needed?
    What should I be cautious of during drilling?
    Is the plastic anchor included?
info@hamiltonsinkler.com
www.hamiltonsinkler.com
Tel: 212-760-3377
1 of 1
Accessories
Floor Stop Installation & Template
1. Remove Cap on door stop
2. Place door stop into position and mark where hole is to be drilled
3. Drill 5/16” hole either a pilot hole if wooden oor or a hole big enough to house anchor (insert anchor) in concrete oor
Be cautious not to drill into under oor heating systems
4. Place door stop over hole and secure with screw
5. Screw on cap should now be inserted
13
8
"
15
8
"
11
2
"
2"
SCREW ON CAP
FASTENER/SCREW
RUBBER BUMPER
DOOR STOP BASE
PLASTIC ANCHOR (for wood or concrete)
(NOT SUPPLIED)
AC84
/