WARNING
Floor Metal Box
MODEL FB-SD4400SN
PLEASE READ INSTRUCTION BEFORE COMMENCING INSTALLATION AND RETAIN FOR FUTURE REFERENCES.
Electrical products can cause death or injury, or damage to property.
If in any doubt about the installation or use of this product, consult a competent electrician.
CONTENTS
WARNING — THE INSTALLATION MUST BE CARRIED OUT BY A QUALIFIED ELECTRICIAN.
1. Use copper wires ONLY
2. DO NOT exceed electrical rating of receptacle
3. 12-10 AWG standard or solid copper wire is preferred
Instruction Manual
1-888-543-6473
1-888-541-6474
13376 Comber Way
Surrey BC V3W 5V9
www.ortechindustries.com
375 Admiral Blvd
Mississauga, ON L5T 2N1
CAUTION
INSTALLATION
1) Use the cutout paper to
cut a space for the box to
install in
2) Cut the box shape
without the ears
completely through the
sub-floor. Cut 3/8" depth
into the sub-floor for the
mounting ears
3) Remove knockouts and
secure the box onto the
floor. Pull the wire
through the opening of
the floors and knockouts
and connect wires based
on the wiring diagram
4) Assemble the receptacle
part above the box
5) Installation complete
ORTECH reserves the right to modify at any time, without notice, any or all of our product's
features, designs, components and specifications to meet market changes.
Step 1 Step 2
Step 3
Step 4
Step 5
Neutral
(White wire)
Ground (Green or Bare wire)
Hot (Black wire)
8-11/16"
(220mm)
4-3/4"
(120mm)
0.1" (2.5mm)
2-3/8"
(61mm)
4"
(102mm)
7-15/16"
(202mm)
3"
(76mm)
Box #6-32 Screws