UTP Keystone Jack 180

CERTECH UTP Keystone Jack 180, UTP Keystone Jack 180˚ Installation guide

  • Hello! I've reviewed the user manual for the CERTECH Keystone Jack 180°. This document provides detailed instructions on how to install the keystone jack, including stripping the cable, seating the wires, and using the rapid termination tool. I'm ready to answer your questions about this installation process and the specifications of the jack.
  • What tools are needed for installation?
    What is the first step in the installation process?
    What wiring configurations are supported?
INSTALLATION GUIDE
UTP Keystone Jack 180˚
WWW.CERTECH.COM.AU Version1.1
Strip the outer jacket 38mm
Seat the colour coded wire pairs in
the correspoding colours on the IDC’s
as per wiring configuration T568A
or T568B
Punch down the wire pairs with
the Rapid Termination Tool.
Carefully snip the excess wires.
Clip the cable retention cap/dust
cover into place.
1.
2.
3.
4.
YOU WILL NEED
CTSTRIP
UTP/STP Cable
Cutter & Stripper
JKRAPID
Rapid Termination
Tool for 180˚
Keystone Jacks
/