Embedding RaySol in Mortar
or Concrete
• Do not hit the heating cable with tools, walk on
the heating cable, or do anything else that may
damage the heating cable jacket.
• Avoid an excessive drop height. Pour from no
higher than 4 ft (1.2 m).
• Work mortar or concrete carefully during the
placement to avoid dislodging or damaging the
heating cable.
• Continuously monitor each heating cable circuit
with a 2500 Vdc megohmmeter during the mor-
tar setting bed placement. Watch for changes
in the megohmmeter reading.
A decreasing megohmmeter reading may
indicate damage to the heating cable. Make sure
the ends of the heating cable are dry and megger
the circuit again. If the megohmmeter reading
is still low, stop the placement immediately and
find the damage. Start inspecting at the area
being worked and look for signs of outer jacket
damage, such as cuts, punctures, or abrasion.
Replace the damaged heating cable.
Allow the mortar or concrete to cure fully before
energizing the heating cable.
4.2 Heating Cable Connections
Installing Junction Boxes
• Use UL Listed or CSA Certified electrical conduit
that meets local electrical codes. The self-reg-
ulating RaySol heating cable automatically
adjusts its output to prevent overheating, even
when installed in plastic conduit.
• Protect both ends of the heating cable from
where it leaves the mortar or concrete to the
power connection junction box by installing
the heating cable in electrical conduit. Extend
the protective conduit at least 6 in (15 cm) into
mortar. Each end of the heating cable may be
pulled through minimum ¾ in (1.9 cm) conduit.
Protect the heating cable by installing bushings
on both ends of the conduit.