Installation Instructions
1. Turn off the circuit hreaker (s) (30 amp) or remove the dryer's
circuit fllse at ttle electrical box.
2. Be sure ttle dwer cold is unphlgged from ttle wall receptacle.
3. Remove tile powei cord covel located at ttle lower back.
4. Remove and discard giound suap. Kee t) the green
ground screw for step 7.
5. Install 3/4 in. UL recognized stiain ielief to powei
cord entry hole. Bring power cord through strain relief_
6. Connect power cold as follows:
A. Connect the 2 hot lines to the outer screws of
tile terminal block (marked L1 and L2).
B. Connect tile neutral (white) line to the center of
tile temlinal block (marked N).
7. Attach giound wire of power cold with the gieen ground
screw (hole above shain relief bracket). Tighten all
terminal block screws (3) completely.
8. Properly secure power cold to strain lelief.
9. Reinstall the covel_
, WARNING: NEVER LEAVE THE
COVER OFF OF THE TERMINAL BLOCK•
CONNECTING DRYER USING 3-WIRE
CONNECTION
IFREQUIRED,BYLOCALCODE,
INSTALLEXTERNALGROUND
(NOTPROVIDED)TOGROUNDED
METAL,COLDWATERPIPE,OR GREEN GROUND
OTHERESTABLISHEDGROUNDGROUND ;TRAP
DETERMINEDBYAQUALIFIEDSCREW
ELECTRICIAN. HOT
WIRE
STRAINRELIEF
BRACKET
3/4",UL
RECOGNIZED
STRAINRELIEF
NEUTRAL
HOT
(White) WIRE
/
COVER
3#10AWGMINIMUMCOPPER
CONDUCTORSOR120/240V30APOWER
SUPPLYCORDKITMARKEDFORUSE
WITHDRYERS& PROVIDEDWITHCLOSED
LOOPORSPADETERMINALSWITH
UPTURNEDENDS(NOTSUPPLIED).
1. Turn off tile circuit breaker (s) (30 amp) or remove the dryer's
circuit fllse at the electrical box.
2. Be snle the dryer cold is unphlgged froin the wall.
3. Remove the powei cord cover located at the lower back.
4. Install 3/4 in. UL recognized strain lelief to power cold
enhy hole. Bnng powei cord thiough shain reliefl
5. Connect power cord as follows:
A. Connect the 2 hot lines to the outer screws of the
tenninal block (marked L1 and L2).
B. Connect tile neutral (white) line to the center of
tile temlinal block (marked N).
6. Be snle ground strap is connected to iletltlal (center)
terminal of block and to green glound screw on cabinet
real. Tighten all terminal block screws (3) completely.
7. Ploperly secure power cold to shain reliefl
8. Reinstall the covel.
, WARNING: NEVER LEAVE THE
COVER OFF OF THE TERMINAL BLOCK•
3
[] EXHAUST INFORMATION
_WARNING - USE ONLY METAL 4-IN. DUCT.
DO NOT USE DUCT LONGER THAN SPECIFIED
IN THE EXHAUST LENGTH TABLE.
Using exhaust longer than specified length will:
• Increase the drying times and the enelgy cost.
• Reduce tile dryer life.
• Accmnulate lint, cleating a potential fire hazard.
The correct exhaust installation is YOUR RESPONSIBILITY.
Problems due to incorrect installation are not covered
by the warranty.
Tile MAXIMUM ALLOWABLE length of the exhaust system
depends upon tile type of duct, mnrlber of turns, the type of
exhaust hood (wall cap), and all conditions noted below. Both
rigid and flexihle metal duct are shown in the table below.
EXHAUST LENGTH
RECOMMENDED MAXIMUM LENGTH
Exhaust Hood Types
Use only for short
run installations
4"DIA.
Recommended
4,,
No. of 90_ Rigid Flexible Rigid Flexible
Elbows Metal Metal Metal Metal
0 90 Feet 55 Feet 60 Feet 45 Feet
1 60 Feet 40 Feet 45 Feet 30 Feet
2 45 Feet 30 Feet 35 Feet 20 Feet
3 35 Feet 20 Feet 25 Feet 15 Feet
4 25 Feet 15 Feet 15 Feet 10 Feet
If using flexible metal duct, please refer to page 5.
EXHAUST SYSTEM CHECK LIST
HOOD OR WALLCAP
•Terminate in a manner to prevent bar'k drafts o1"entry of birds oi
other wildlife.
• Termination should present minimal resistance to tile exhaust air flow
and shouM requite little or no maintenance to prevent clogging.
• Never install a screen in or over tlle exhaust duct. This could cause lint build up.
• Wall caps must be installed at least 12 in. above ground level or ally other
obstruction with the opening pointed down.
• If roof vents or louvered plenums are used, they inust be equivalent to a
4-in. dampened wall cap in regard to resistance to air flow, prevention of
back drafts, and maintenance required to prevent clogging.
SEPARATION OF TURNS
For best performance, separate all turns by at least 4 ft. of straight duct,
including distance between last ttlrn and exhaust hood.
TURNS OTHER THAN 90°
• One turn of 45° or less may be ignored.
• Two 45 ° turns should be treated as one 90 ° turn.
• Eactl turn over 45 ° shouM be treated as one 90 ° turn.
SEALING OF JOINTS
• All joints shouM be tigtlt to avoid leaks. Tile male end of each section of
duct must point away from ttle dryer.
• Do not asselnble ttle ductwotk with fasteners that extend into tlle duct.
They will serve as a collection point for lint.
• Duct joints call be made air and moisture tight by wrapping the
overlapped joints with duct tape.
• Horizontal runs stlould slope down toward tile outdoors 1/2 inch per foot
INSULATION
Duct work that tuns ttltough an unheated area ot is near air conditioning
shoukt be insulated to reduce condensation and lint build-up.