Bradley S19-210B is a pedestal-mounted eyewash with a stainless steel bowl. It is designed for use in industrial and commercial settings where there is a risk of eye or face injury from hazardous materials. The eyewash features a 10-inch (254 mm) diameter bowl with a 3-inch (76 mm) deep reservoir. The bowl is made of 18-gauge (1.2 mm) type 304 stainless steel with a seamless, drawn construction. The eyewash is activated by a push handle that is located on the front of the bowl. When the handle is pushed, water flows from the bowl's four nozzles at a rate of 3 gallons per minute (11.

Bradley S19-210B is a pedestal-mounted eyewash with a stainless steel bowl. It is designed for use in industrial and commercial settings where there is a risk of eye or face injury from hazardous materials. The eyewash features a 10-inch (254 mm) diameter bowl with a 3-inch (76 mm) deep reservoir. The bowl is made of 18-gauge (1.2 mm) type 304 stainless steel with a seamless, drawn construction. The eyewash is activated by a push handle that is located on the front of the bowl. When the handle is pushed, water flows from the bowl's four nozzles at a rate of 3 gallons per minute (11.

P.O. Box 309, Menomonee Falls, WI USA 53052-0309
PHONE 800.BRADLEY (800.272.3539) FAX 262.251.5817
bradleycorp.com
Installation
215-1797 Rev A; ECN 14-05-001
© 2014 Bradley
Page 1 of 10 1/13/2014
S19-210B
Pedestal-Mounted Eyewash with Stainless
Steel Bowl
Douche oculaire sur pied avec le récepteur
en acier inox
Lavaojos montado en pedestal con receptor
de acero inoxidable
Table of Contents
Pre-Installation Information ................... 2
Installation .................................2
Dimensions ............................... 3
Components and Parts List ................... 4
Table des matières
Avant l’installation .......................... 5
Installation .................................5
Dimensions ............................... 6
Composantes et liste des pièces............... 7
Contenido
Información previa a la instalación ............. 8
Instalación .................................8
Dimensiones .............................. 9
Componentes y lista de piezas ............... 10
2
S19-210B Installation
1/13/2014 Bradley 215-1797 Rev A; ECN 14-05-001
IMPORTANT!
Read this installation manual completely to ensure proper installation, then file it
with the owner or maintenance department. Compliance and conformity to drain
requirements and other local codes and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before
discarding any packaging material. If any parts are missing, do not begin installation
until you obtain the missing parts.
Flush the water supply lines before beginning installation and after installation is
complete. Test the unit for leaks and adequate water flow. Main water supply to the
eye/face wash should be “ON” at all times. Provisions shall be made to prevent
unauthorized shutoff.
The ANSI Z358.1 standard requires an uninterruptible supply of flushing fluid at a
minimum 30 PSI (0.21 MPa) flowing pressure. Flushing fluid should be tepid per ANSI
Z358.1.
The inspection and testing results of this equipment should be recorded weekly
to verify proper operation. This equipment should be inspected annually to ensure
compliance with ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should be
trained regarding the placement and proper operation of emergency equipment per
ANSI Z358.1.
For questions regarding the operation or installation of this product, visit www.
bradleycorp.com or call 1-800-BRADLEY.
Product warranties and service parts information may also be found under ”Products”
on our web site at www.bradleycorp.com.
Installation
THIS
SIDE
UP
Packing List
P.O. Box 309, Menomonee F
alls,
WI 53051
R
TEST THIS
UNIT EACH
WEEK
Test-operate valv
e(s) each week and sign
below.
Report an
y malfunctions immediatel
y.
Ventil(e) wöc
hentlich im
Testbetrieb prüfen,
bestätigt
durch Untersc
hrift. Jeglic
he Störung sofor
t melden.
Date
Datum
Date
Signed
Unterschrift
Signe
Date
Date
Date Signed
Signed
Signed
DIESES GERÄT 1ST
WÖC
HENTLICH ZU
PRÜFEN.
ESSAI HEBDOMA
DAIRE
Test le fonctionnement des v
alves chaque semaine et
signe en bas. S'il y à quelqu
e chose qui ne v
a pas fait
un rappor
t immédiatement.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
114-051
Installation
Supplies Required:
• (3)
3
8"flooranchorsandbolts •Pipingto½”NPTwatersupplyinlet
• Pipesealant •Pipingto1¼”NPTdrainoutlet
• Sign-mountinghardware
Step 1: Secure base to floor
1. Installthreesuitableanchors(suppliedbyinstaller)for
3
8" bolts in the floor.
2. Boltthebasetotheflooranchorsusing
3
8"bolts(suppliedbyinstaller).
Step 2: Assemble eye/face wash
1. Assembleeye/facewashcomponentsasshownonpage4.
• Applypipesealant(suppliedbyinstaller)toallmale-threadedpipejoints.
• UsetherubbergrippadprovidedorastrapwrencharoundpipeswhentighteningtopreventmarringtheBradtect®
protective,safetyyellowcoating.Placethegrippadonthepipe,thenputthewrenchoverthegrippadandturnthe
pipewiththewrench.
Step 3: Connect water supply
1. Connectthewatersupplypiping(suppliedbyinstaller)tothe½"NPTinletontheeyewash.
2. Connectthedrainpiping(suppliedbyinstaller)tothe1¼"NPTdrainoutletontheeye/facewash.
3. Mountthesafetysigntothewallusingsign-mountinghardware(suppliedbyinstaller).
3
Installation S19-210B
Bradley 215-1797 Rev A; ECN 14-05-001 1/13/2014
Dimensions
NOTE: All dimensions assume standard thread engagement. Variations in manufacturing
allow for +/-
1
8" (3mm) per threaded joint. To find the tolerance of a dimension, add
the number of thread joints in between a dimension and multiply it by
1
8" (3mm).
NOTE: Local codes may require the installation of a backflow prevention valve to complete
proper installation. Compliance with local codes is the responsibility of the installer.
Valve must be tested annually to verify that it is functioning properly. Backflow
prevention valves are not included with the fixture and may be supplied by the
contractor or purchased from Bradley Corporation.
15½" (394mm)
7
3
8"
(187mm)
5¼"
(133mm)
6"
(152mm)
36"
(914mm)
41½"
(1054mm)
Ø 10¾"
(273mm)
4
S19-210B Installation
1/13/2014 Bradley 215-1797 Rev A; ECN 14-05-001
Assembly of Components and Parts List S19-210B
4.7
4.8
4.5
4.4
4.3
4.2
4.1
5
7
9
10
8
3
6
2
1
P.O. Box 309, Menomonee Falls, WI 53051
R
TEST THIS UNIT EACH WEEK
Test-operate valve(s) each week and sign below.
Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden.
Date
Datum
Date
Signed
Unterschrift
Signe
Date
Date
Date Signed
Signed
Signed
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE
Test le fonctionnement des valves chaque semaine et
signe en bas. S'il y à quelque chose qui ne va pas fait
un rapport immédiatement.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
114-051
11
7.1
4
4.6
NOTE: Items 4.1–4.8 come preassembled as Item 4.
PrepackS45-122includesItems7,7.1,8,9
PrepackS45-123includesItems7.1,8,9
PrepackS45-1782includesItems4.2,4.4,4.5,4.6
Item Part No. Qty. Description
1 131-059 1 Base
2 169-727 1 PipeTee1¼"NPT
3 113-006LC 1 Pipe 1¼"NPT x 27½"
4 S90-285 1 StainlessSteelBowlAssembly
4.1 111-039 1 InletDrainFitting
4.2 124-028 1 CenterSealGasket
4.3 187-053 1 StainlessSteelEyewashBowl
4.4 173-009 1 CupStrainer
4.5 S21-071 1 Stem,Supply
4.6 113-1159 1 Spacer,Drain
4.7 S05-091 1 EyewashYokeAssembly
4.8 107-371 2 TetheredDustCover
5 113-006LQ 1 Pipe ½"NPT x 3½"
6 169-025 1 StreetElbow½"
7 S27-282 1 ½"BallValvew/Nut
7.1 110-215 1 NutOnly
8 128-135 1 Plastic Handle
9 142-002DA 1 Lockwasher
10 114-051 1 SafetySign
11 204-421 1 EmergencyInspectionTag
12 269-915 1 GripPad(notshown)
1¼"NPT
DrainOutlet
½"NPT
SupplyInlet
Flowcontrol
this end
7
Installation S19-210B
Bradley 215-1797 Rev A; ECN 14-05-001 1/13/2014
Assemblage des composantes et liste des pièces S19-210B
4.7
4.8
4.5
4.4
4.3
4.2
4.1
5
7
9
10
8
3
6
2
1
P.O. Box 309, Menomonee Falls, WI 53051
R
TEST THIS UNIT EACH WEEK
Test-operate valve(s) each week and sign below.
Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden.
Date
Datum
Date
Signed
Unterschrift
Signe
Date
Date
Date Signed
Signed
Signed
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE
Test le fonctionnement des valves chaque semaine et
signe en bas. S'il y à quelque chose qui ne va pas fait
un rapport immédiatement.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
114-051
11
7.1
4
4.6
NOTE : Les articles 4.1–4.8 sont préassemblés tel que 4.
PaquetS45-122comprendleséléments7,7.1,8,9
PaquetS45-123comprendleséléments7.1,8,9
PaquetS45-1782comprendleséléments4.2,4.4,4.5,4.6
Piéce Réf Qté Description
1 131-059 1 Bride
2 169-727 1 Téde 1¼"NPT
3 113-006LC 1 Tuyaude 1¼" x 27½"
4 S90-285 1 Assemblagedurécepteurenacierinox
4.1 111-039 1 Raccordementd’entréedudrain
4.2 124-028 1 Jointd’etanchéité
4.3 187-053 1 Récepteurenacierinox
4.4 173-009 1 Crépine
4.5 S21-071 1 Tiged’alimentation
4.6 113-1159 1 Entretoise
4.7 S05-091 1 Assemblagedecadrededoucheoculaire
4.8 107-371 2 Cache-poussièreancré
5 113-006LQ 1 Tuyau ½"NPT x 3½"
6 169-025 1 Coude ½"
7 S27-282 1 Robinet ½" avecécrou
7.1 110-215 1 Écrou(seulement)
8 128-135 1 Manette
9 142-002DA 1 Rondelledesécurité
10 114-051 1 Enseignedesécurité
11 204-421 1 Etiquetted’inspection
12 269-915 1 Tamponantidérapant(nonmontré)
Contrôle
dudébit,
cebout
Alimentation
½"NPT
Orificede
vidange
1¼"NPT
10
S19-210B Installation
1/13/2014 Bradley 215-1797 Rev A; ECN 14-05-001
Entradadesuministro
½"NPT
Salidade
drenado
1¼"NPT
Montaje de los componentes y lista de piezas S19-210B
4.7
4.8
4.5
4.4
4.3
4.2
4.1
5
7
9
10
8
3
6
2
1
P.O. Box 309, Menomonee Falls, WI 53051
R
TEST THIS UNIT EACH WEEK
Test-operate valve(s) each week and sign below.
Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden.
Date
Datum
Date
Signed
Unterschrift
Signe
Date
Date
Date Signed
Signed
Signed
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE
Test le fonctionnement des valves chaque semaine et
signe en bas. S'il y à quelque chose qui ne va pas fait
un rapport immédiatement.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
114-051
11
7.1
4
4.6
Control
delflujo
en este
extremo
Art. Pieza Cant Descripción
1 131-059 1 Base
2 169-727 1 TuboenTNPT de 1¼"
3 113-006LC 1 TuboNPTde 1¼" x 27½"
4 S90-285 1 Conjuntodelreceptordeplástico
4.1 111-039 1 Conexiónparalaentradadeldesagüe
4.2 124-028 1 Junta
4.3 187-053 1 Receptor de acero inoxidable
4.4 173-009 1 Coladera
4.5 S21-071 1 Conjuntodeltubodeabastecimiento
4.6 113-1185 1 Espaciador
4.7 S05-091 1 Conjuntoderociadoresdelavaojos
4.8 107-371 2 Cubiertacontraelpolvo
5 113-006LQ 1 TuboNPTde ½" x 3½"
6 169-025 1 Codo ½"
7 S27-282 1 VálvulaesféricaNPTde ½" (contuerca)
7.1 110-215 1 Tuerca(solamente)
8 128-135 1 Manija
9 142-002DA 1 Arandeladeseguridad
10 114-051 1 Letrerodeseguridad
11 204-421 1 EtiquetadeEmergencia
12 269-915 1 Almohadilladeagarre
PaqueteS45-122incluyeart.7,7.1,8,9
PaqueteS45-123incluyeart.7.1,8,9
PaqueteS45-1782incluyeart.4.2,4.4,4.5,4.6
NOTA: Losartículosdel4.1al4.8vienenpreviamentemontadoscomoArtículo4.
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10

Bradley S19-210B Installation guide

Category
Sanitary ware
Type
Installation guide

Bradley S19-210B is a pedestal-mounted eyewash with a stainless steel bowl. It is designed for use in industrial and commercial settings where there is a risk of eye or face injury from hazardous materials. The eyewash features a 10-inch (254 mm) diameter bowl with a 3-inch (76 mm) deep reservoir. The bowl is made of 18-gauge (1.2 mm) type 304 stainless steel with a seamless, drawn construction. The eyewash is activated by a push handle that is located on the front of the bowl. When the handle is pushed, water flows from the bowl's four nozzles at a rate of 3 gallons per minute (11.

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI