BASE UNIT
150 - 300 Pull Out
Assembly Guide
For Internal Use: FI.WR.INS.029_WKIN00101_BASE_PullOut_150-300_1Dr_Rev4.indd
Page 6
For Step 2 in pull out instructions.
Use 15mm screws.
Worktop
Screw up through panel (C) into
your worktop to secure it in place.
Screws for attaching to worktop are not supplied
as these vary depending on worktop material
and thickness. Ensure appropriate xings for
attaching worktop are used. Please refer to the
specialist worktop supplier if these are required
for solid surface worktops.
Screw to Adjacent Unit
Screw through side panels (B) where
appropriate, into any side units, using
the 30mm screws (K) provided to
secure to unit. Place a cover cap (M)
on the head to conceal it.
L Brackets
Where applicable, secure unit to the wall
using 2 x 15mm screws (L) to secure each of the L brackets
to the cabinets at either side. Then screw through into the
wall as shown.
Screws for attaching to walls are not provided as these
vary depending on your wall material and construction.
Ensure appropriate xings for wall construction are
used. L brackets should only be tted for securing wood
and laminate worktops, please refer to the specialist
worktop supplier if these are required for solid surface
worktops.
L
L
C
B
K