Vertiv SmartRow DCR Installer/User Manual

Type
Installer/User Manual
SmartRow™ DCR
3to6 Rack20-kW (N/(N+1)
and5to10Rack36-kW(N)CoolingUnits, 60Hz
Installer/User Guide
Technical Support Site
If you encounter any installation or operational issues with your product, check the pertinent section of
this manual to see if the issue can be resolved by following outlined procedures. For additional assistance,
visit https://www.VertivCo.com/en-us/support/
TABLE OF CONTENTS
1 Important Safety Instructions 7
2 Introduction 9
2.1 Operational Overview 9
2.2 DCR Control Panel andFire-suppressionSystemCommissioningandTraining 9
2.3 SmartRow DCR Components 10
2.4 Liebert PDX/PCW Notes 11
3 Preparation 13
3.1 Clearance Requirements 13
3.2 Inspection 13
3.3 Unloading the SmartRow DCR 13
3.4 Required Set-up Tools and Equipment 14
3.5 Heat Load Guidelines 14
4 Installation 15
4.1 Assembly Sequence Overview 15
4.1.1 SmartRow DCR withSingleLiebertPDX/PCW(20-kW(N)Configuration) 15
4.1.2 Configuring theSmartRowDCRforLeft-to-Right Assembly 16
4.1.3 SmartRow DCR with Two Liebert PDX/PCW Units—20-kW(N+1)/36-kW(N)
Configurations 18
4.2 Install the DCR Base Plenum-PDX/PCW First 18
4.3 Assemble the DCR Base Plenums-Rack 19
4.4 Set the PDX/PCW on the Base Plenum-PDX/PCW
andInstallCondensatePumpandLiqui-tectSensor 21
4.5 Set the DCR Control Panel andFireSuppressionSystemonthe Base Plenum 28
4.6 Install the DCR Racks on the Base Plenums 29
4.7 Install the Top Plenum-PDX/PCW 33
4.8 Mounting the Top Plenums-Rack 33
4.9 Installing a Second PDX/PCW (20-kW(N+1)/36-kW(N)Configuration) 36
4.10 Installing and Wiring Sensors 38
4.10.1 Connect Return-temperature Thermostat,
theL5-20ReceptacleandtheSmokeDetector 38
4.10.2 Connecting the Secondary Return-temperature Thermostat(P3R) for 20-kW
(N+1)/36-kW (N) Configurations 39
4.10.3 Connecting the Secondary PDX/PCW Smoke Detector
tothePrimaryPDX/PCWSmokeDetector 40
4.10.4 Install Supply Air Temperature Sensor 40
4.10.5 Install and Wire 2T Sensors 40
4.10.6 Locate and Install 4-pin HVAC Fault/Emergency Fan Control,
Thermal-unitShutdownConnectorCable(P2) 41
4.10.7 Connecting Secondary, 4-pin HVAC Fault/ Emergency Fan Control,
Thermal-UnitShutdownConnectorCable (P2R) for20-kW(N+1)/36-kW (N) Configurations 42
4.11 Adjusting Air-flow Adjustment Dampers 42
4.12 Install Emergency-fan Assemblies 44
Vertiv | SmartRow DCR Installer/User Guide | 3
4.13 Air/Ventilation Management 46
4.13.1 Ventilation Requirements 46
4.13.2 Emergency-fan Notes 46
4.14 Cable Management 46
4.14.1 Prepare for Cable Management 46
4.14.2 Routing Power Whips 47
4.14.3 Routing Network Cables—Ethernet and Fiber-optic 48
5 Power Connections 53
5.1 Power Connections to Liebert PDX/PCW 53
5.2 Input Power Wiring Alternatives to DCR Control Panel andFireSuppression System and Rack
Equipment 53
5.2.1 Single Bus—SmartRow DCR Load Supplied by a Single UPS 54
5.2.2 Single Bus—SmartRow DCR Load SuppliedbyRack-mountedUPS 54
5.2.3 Dual Bus—SmartRow DCR Load SuppliedbyTwo Central UPSs 54
6 Liebert iCOM Controls Set-up 55
6.1 iCOM Installation Prerequisites 55
6.2 Liebert iCOM Setup for all SmartRow DCR Types 55
6.2.1 Set Fixed Fan Speed to Factory-approved Level 56
6.2.2 Prevent False High- and Low-Temperature Alarms 56
6.2.3 Prevent Emergency Fan Activation by Warnings 56
6.2.4 Control Cooling Calculation byRemote2TRackTemperatureSensor Readings 56
6.2.5 Additional Liebert iCOM Settings andAdjustmentsforSmartRowDCR Operation 57
6.3 Additional Settings for20-kW, 3-to6-rackSystems—NCooling(1PDX/PCW-one cooling unit
on) 58
6.4 Additional Settings for 20-kW, 3-to6-rackSystems—N+1cooling Only
(2PDX/PCWs-onecoolinguniton,oneinstandby) 58
6.4.1 Prevent High-temperature Threshold fromStartingAllLiebertPDX/PCWs 59
6.4.2 Prevent False High-humidity Alarms 59
6.5 Additional Settings for 36-kW, 5-to10-rackSystems—NCooling Only (2PDX/PCWs - both units
on) 59
6.5.1 Ensure Even Airflow to all Racks During Low Heat Load 59
7 DCR Control Panel and Fire Suppression System 61
7.1 DCR Control Panel andFireSuppressionSystemComponentLocations 61
7.1.1 Control Panel andFireSuppressionSystemComponentsOperation 62
7.2 Recovering from EPO Circuit Activation 64
7.3 Recovering from a Fire Suppression System Activation 65
8 Installation Checklist 67
8.1 Cooling and Power Component Installation Checklist 67
8.2 Fire Suppression System Installation Checklist 68
8.2.1 DCRFireSuppressionCommissioning Procedure 69
9 Start-up 71
9.1 System Start-up and Commissioning 71
9.2 System Start-up and Activation 71
Vertiv | SmartRow DCR Installer/User Guide | 4
10 Troubleshooting 73
11 Maintenance 77
11.1 Liebert PDX/PCW Maintenance 77
11.2 Fire Detection and Suppression System Maintenance 77
11.3 UPSs and Rack PDUs Maintenance 77
12 Technical Data 78
12.1 Unit Dimensions, Weights, and Wiring Tables 78
12.2 Technical-installation Illustrations 81
Vertiv | SmartRow DCR Installer/User Guide | 5
Vertiv | SmartRow DCR Installer/User Guide | 6
1 IMPORTANT SAFETY INSTRUCTIONS
Save These Instructions
This manual contains important instructions that must be closely followed during installation of this unit
to maintain compliance with agency listings. Read all safety and operating instructions before attempting
to operate the SmartRow DCR. Adhere to all warnings on the unit and in this manual. Follow all operating
and user instructions.
This product is designed for commercial / industrial use only. This product is not intended for use with life
support or other U.S. FDA designated “critical” devices. Maximum loads must not exceed those specified in
this manual.
Install in a clean environment, free from moisture, flammable liquids, gases and corrosive substances.
Operate this product in an indoor environment at an ambient temperature between 35°F and 85°F (1.6°C
to 29°C). Additionally, units using a remote condenser must be operated at outdoor ambient
temperatures of:
MC condensers—above 0°F (18°C)
Liebert Lee-Temp
condensers—above -20°F (-29°C)
This product must be connected to and powered by suitable AC supplies, rated in accordance with the
unit’s serial tag. It must be properly grounded and protected by circuit breakers or fuses.
The SmartRowDCR must be installed on a flat, level surface for proper assembly and operation.
We recommend using shielded cables for all external communication interfaces.
Ensure that the SmartRow DCR has proper ventilation. Never block or insert objects into the ventilation
holes or other openings. Maintain minimum clearances as specified in this manual (see Clearance
Requirements on page13 and Unit Dimensions, Weights, and Wiring Tables on page78).
WARNING! Risk of handling heavy unit. Can cause equipment damage, injury or death. Read all
instruction before beginning.
WARNING! Risk of top-heavy unit falling over. Improper handling can cause equipment
damage, injury or death. Only properly trained and qualified personnel wearing appropriate
safety headgear, gloves, shoes and glasses should attempt to move, lift, remove packaging
from or prepare unit for installation. Read all instructions before attempting to move, lift,
remove packaging from or preparing unit for installation.
Vertiv | SmartRow DCR Installer/User Guide | 7
SYMBOL DESCRIPTION
Hazardous voltage present
Indicates caution followed by important instructions
Requests the user to consult the manual
Indicates weight
Equipment grounding conductor
Bonded to ground
Alternating-current (AC) voltage
Table 1.1 Glossary of Symbols
Vertiv | SmartRow DCR Installer/User Guide | 8
2 INTRODUCTION
The SmartRow DCR is an integrated component of the SmartRow
offering from Vertiv™. The system
includes a closed-loop, integrated cooling system and fire suppression. Assembly is a matter of
connecting the plenums and cabinets, then making electrical and piping connections.
The SmartRow DCR is available in three basic cooling configurations:
20-kW (N) Configuration—3- to 6-rack system capable of removing up to 20kW of heat (single
LiebertPDX/PCW).
20-kW (N+1) Configuration—3- to 6-rack system capable of removing up to 20kW of heat
(redundant LiebertPDX/PCW).
36-kW (N) Configuration—5- to 10-rack system capable of removing up to 36kW of heat (dual
LiebertPDX/PCWs).
Each configuration has different requirements and recommendations for setup and operation. Those
requirements are integral to effective operation of a SmartRow DCR.
The SmartRow DCR must be installed in an indoor, climate-controlled environment. The unit will not
protect electronic equipment if it is installed in an environment subject to extreme temperatures or
humidity.
This manual is to be used in conjunction with existing Vertiv™ product manuals for each component and
site-specific documentation and drawings. User and installation manuals ship with the equipment and are
also available at http://www.VertivCo.com/en-us/support/.
2.1 Operational Overview
The SmartRow DCR is an enclosed system to house and cool electronic equipment. The DCR racks house
the critical IT equipment, optional Rack PDUs and optional rack-mounted UPS units.
Cooling air is supplied by an integral Liebert PDX/PCW and conveyed to the racks with bottom plenums.
Heated exhaust air from the racks returns to the Liebert PDX/PCW through the top plenums. An
emergency fan system is included to exhaust air in the event of excessive internal temperature or a
primary cooling failure.
The DCR Control Panel and Fire Suppression System module contains the fire detection and suppression
system, fire strobe light and audible horn, the power/fire control interface, fire-suppression-system abort
and manual-release switches, emergency fan-reset controls, and the load-distribution center. The
fire-detection system uses a smoke detector to monitor the air in the SmartRow DCR for evidence of
combustion. If the smoke detector mounted in the return air plenum senses combustion products, the
system control activates audible and visual alarms and releases a fire-suppression agent (see Figure 7.1
on page61). The load-distribution center distributes power to powered loads inside the SmartRow DCR.
2.2 DCR Control Panel andFire-suppressionSystemCommissioningandTraining
A local qualified service representative will commission and arm the DCR Control Panel and Fire
Suppression System after the SmartRow DCR is fully installed and operational. The representative will
conduct training on the system during the same visit. The commissioning, arming and training cannot be
performed before all items in Cooling and Power Component Installation Checklist on page67, and Fire
Suppression System Installation Checklist on page68, have been completed.
Vertiv | SmartRow DCR Installer/User Guide | 9
2.3 SmartRow DCR Components
Required components differ based on whether the SmartRow DCR employs a single Liebert PDX/PCW or
two Liebert PDX/PCWs.
DCR Base Plenum-Rack (with Manual Air-flow Adjustment Damper)—one for each DCR rack
DCR Top Plenum-Rack (with Emergency Fan)—one for each DCR Rack
DCR Base Plenum-PDX/PCW (with Back-draft Dampers)—installs under each Liebert
PDX/PCW and DCR Control Panel and Fire Suppression System
DCR Top Plenum-PDX/PCW—installs on each Liebert PDX/PCW and DCR Control Panel and
Fire Suppression System
DCR Control Panel and Fire Suppression System—consists of the fire detection panel, fire-
suppression system, override timers, load-distribution center, fire strobe/horn and the
power/fire control interface
Liebert PDX/PCW—5-ton downflow unit specially configured for use in the SmartRow DCR
DCR Rack—Plexiglas® front door, split solid rear door, sealed rack design; number varies.
Standard configuration includes 1 networking rack, 800-mm wide, and the remaining quantity
are server racks, 700-mm wide. See DCR 700-mm wide cabinet and DCR 800-mm wide cabinet
in Technical-installation Illustrations on page81.
Redundant DCR Control Shell—attaches to the second Liebert PDX/PCW; houses the optional
redundant load-distribution center
Vertiv | SmartRow DCR Installer/User Guide | 10
Figure 2.1 SmartRow DCR components
NO. DESCRIPTION NO. DESCRIPTION
1 Emergency Fans 5
Liebert PDX/PCW cooling unit
(a second cooling unit attaches at opposite end
for20-kW (N+1) and 36-kW configurations)
2 DCR Top Plenum-PDX/PCW 6 4-rack 20kW (N) SmartRow DCR shown
3
DCR Control Panel
and Fire-suppression System, PDX/PCW
7 DCR Base Plenum(s)-Rack
4 DCR Base Plenum-PDX/PCW 8 DCR Top Plenum(s)-Rack
Table 2.1 SmartRow DCR Components
2.4 Liebert PDX/PCW Notes
Specially configured for SmartRow DCR applications
Does not include reheat or humidifier
Includes a condensate pump field-installed.
Liebert PDX/PCW can be factory-configured for either top feed or bottom feed for
piping/electrical feeds; this must be specified at time of order
5 ton, digital scroll, downflow unit
Factory-installed, field-mounted leak detection
Large Liebert iCOM with monochrome display
Vertiv | SmartRow DCR Installer/User Guide | 11
Vertiv | SmartRow DCR Installer/User Guide | 12
This page intentionally left blank.
3 PREPARATION
The application and installation location should be determined and prepared before the SmartRow DCR is
delivered. Proper planning will permit installing the required power and coolant connections and ensuring
proper clearances. The installation location must have:
An indoor, climate-controlled environment free from moisture, flammable liquids, gases, and
corrosive substances.
An environment that is maintained year-round at an ambient temperature between 35°F and
85°F (1.6°C to 29°C) and a relative humidity between 50°F and 85°F dry bulb and less than
60°F dew point.
Sufficient height and clearance from ceilings, walls, fixtures and overhead sprinkler nozzles for
the SmartRow DCR, including its emergency fans
NOTE: The SmartRow DCR must be installed on a flat, level surface to maintain proper spacing and
provide tight seals. Leaving gaps in the field-applied gaskets will reduce cooling efficiency, increase
energy use and adversely affect fire-suppression system operation.
Heat rejection coolant supply for the Liebert PDX/PCW
Input power sufficient for:
Each Liebert PDX/PCW—one or two units; each requires a separate input power feed.
DCR Control Panel and Fire Suppression System, Emergency Fans and powered
equipment installed in the DCR racks
For details about any component’s requirements, refer to that unit’s user manual. The Liebert PDX/PCW
installation manual is SL-19800; Liebert iCOM™ user manual is SL-18835. These are delivered with the
unit and are available at http://www.VertivCo.com/en-us/support/.
3.1 Clearance Requirements
See SmartRow DCR dimension details in Technical Data on page78.
DCR COMPONENT MINIMUM CLEARANCE REQUIREMENT, IN.(MM)
DCR Control Panel & Fire Suppression System
36 (914) front
PDX/PCW Cooling Unit 36 (914) front
Any DCR surface and the nearest building fire-suppression sprinkler head. 18 (457) per NFPA 13
DCR Emergency Fan discharge and nearest surface 16 (406) air-flow clearance
Table 3.1 SmartRow DCR system clearances—Single or Dual Liebert PDX/PCWs
3.2 Inspection
Upon receiving a SmartRow DCR, examine the packaging for any signs of mishandling or damage. If any
damage is noted, notify your local Vertiv representative and the carrier immediately.
3.3 Unloading the SmartRow DCR
Before unloading the SmartRow DCR, refer to the manual for each component, particularly the Liebert
PDX/PCW and DCR Racks. These manuals are shipped with the SmartRow DCR and are available at
http://www.VertivCo.com/en-us/support/.
Vertiv | SmartRow DCR Installer/User Guide | 13
Read these manuals thoroughly. They include handling instructions and safety notices that must be
followed when unpacking, installing, operating and maintaining the SmartRow DCR.
Adhere to all warnings, cautions and installation, operating and safety instructions on the units and in
their manuals. Only properly trained and qualified personnel should move, install, operate or service this
equipment.
3.4 Required Set-up Tools and Equipment
The following tools are needed to set up a SmartRow DCR:
3/4-in. (19-mm) open end wrench or socket
Ratchet to fit sockets
Phillips-head screwdriver
Flat-blade screwdriver
Forklift or pallet jacks
Scissors or knife
Carpenter’s level, 3-ft long or longer
3.5 Heat Load Guidelines
Notice
Risk of exceeding cooling capability. Can cause equipment damage.
A SmartRow DCR 20-kW (N) configuration (one PDX/PCW cooling unit) or 20-kW (N+1)
configuration (two PDX/PCW cooling units) is capable of removing 20 kW of heat. A SmartRow
DCR 36-kW (N) configuration (two PDX/PCW cooling units) can remove 36kW of heat.
Exceeding that heat load limit, such as by overloading the DCR racks, can cause equipment in
the cabinets to overheat, resulting in equipment damage and voiding warranties.
Refer to the values in Table 3.2 below. The total system capacity and heat loads per cabinet must fall
withing these ranges. We recommend that higher-density loads be located in the center of the SmartRow
configuration. This avoids the need to manually adjust the air dampers when thermal-management units
switch in 2-unit configurations.
20-KW (N/N + 1) CONFIGURATION HEAT LOAD PER CABINET 36-KW (N) CONFIGURATION HEAT LOAD PER CABINET
NUMBER OF
CABINETS
MINIMUM, KW MAXIMUM, KW
NUMBER OF
CABINETS
MINIMUM, KW MAXIMUM, KW
3 1.2 6 5 1.4 7
4 0.9 5 6 1.2 6
5 0.7 4 7 1.0 5
6 0.6 3 8 0.9 5
9 0.8 4
10 0.7 4
Table 3.2 Average heat load per cabinet
Vertiv | SmartRow DCR Installer/User Guide | 14
4 INSTALLATION
4.1 Assembly Sequence Overview
Typical SmartRow DCR assemblies with a single thermal-management unit are configured with the
Control Panel and Fire Suppression system and the thermal-management unit on the right-hand side. To
configure your assembly with the panel and unit on the left-hand side, start with Configuring
theSmartRowDCRforLeft-to-Right Assembly on the next page, then continue with the subsequent
instructions.
4.1.1 SmartRow DCR withSingleLiebertPDX/PCW(20-kW(N)Configuration)
Refer to Figure 4.1 below components and follow the procedures in the subsequent sections to assemble
theSmartRow DCR.
Figure 4.1 Components of single Liebert PDX/PCW system installation
NO. DESCRIPTION NO. DESCRIPTION
1 Emergency Ventilation Fans 5
Liebert PDX/PCW section (cooling unit behind control panel/fire-
suppression system.)
2 DCR Top Plenum-PDX/PCW 6 DCR network rack
3
DCR Control Panel
and Fire-suppression System
7 DCR server racks
4 DCR Base Plenum-PDX/PCW 8 DCR Top Plenum(s)-Rack
Vertiv | SmartRow DCR Installer/User Guide | 15
4.1.2 Configuring theSmartRowDCRforLeft-to-Right Assembly
These steps are only needed if you have a single thermal-management-unit configuration and you want
to mount the unit and the Control Panel and Fire Suppression system on the left-hand side of the
SmartRow assembly. You are modifying the base and top plenums for the control panel/thermal-
management unit for installation on the opposite end of the SmartRow.
1. Modify the Base Plenum-PDX/PCW (DCR-A-300 PDX):
a. Remove the cover plate on the right-hand side of the Base Plenum-PDX/PCW, and set it
aside tobe installed on the base plenum of the final rack on the opposite end of the row.
b. Move the (2) Back-draft Dampers on the left-hand side of the plenum to the right-hand
side of the plenum as shown Figure 4.2 below.
c. Move the (4) Hex stand-offs from the left-hand side of one of the Base Plenums-Rack
(DCR-A-101) and install them on the right-hand side of the Base Plenum-PDX/PCW
(DCR-A-300PDX), see Figure 4.2 below.
The Base Plenum-Rack without the stand-offs is now the base plenum that will be
positioned on the opposite end of the row with the cover plate installed on its right-hand
side.
Figure 4.2 Modifying Base Plenum-PDX/PCW for installation on left-hand side of SmartRow
NO. DESCRIPTION NO. DESCRIPTION
1 Cover plate 4 Base plenum-PDX/PCW after modification
2 Back-draft dampers 5 Base plenum-PDX/PCW before modification
3 Hex stand-off hardware (4 places)
Vertiv | SmartRow DCR Installer/User Guide | 16
2. Modify the Top Plenum PDX/PCW (DCR-A-400PDX):
a. Remove the cover plate on the right-hand side of the Top Plenum-PDX/PCW, Figure 4.3
below, andsetit aside to be installed on the top plenum of the final rack on the opposite
end of the row.
b. Move (4) Hex Standoffs from the left-hand side of one of the Top Plenums-Rack
(DCR-A-200) andinstall them on the right-hand side of the Top Plenum-PDW/PCW
(DCR-A-400PDX), seeFigure 4.3 below.
This Top Plenum-Rack without the stand-offs is now the top plenum that will be
positioned on the opposite end of the row with the cover plate installed on its right-hand
side.
3. Continue with the installation procedures, starting with Install the DCR Base Plenum-PDX/PCW
First on the next page.
Figure 4.3 Modifying Top Plenum-PDX/PCW for installation on left-hand side of SmartRow
NO. DESCRIPTION NO. DESCRIPTION
1 Cover plate 3 Top plenum-PDX/PCW after modification
2 Hex stand-off hardware (4 places) 4 Top plenum-PDX/PCW before modification
Vertiv | SmartRow DCR Installer/User Guide | 17
4.1.3 SmartRow DCR with Two Liebert PDX/PCW Units—20-kW(N+1)/36-kW(N)
Configurations
Refer to Figure 4.4 below components and starting with Install the DCR Base Plenum-PDX/PCW First
below, follow the procedures in the subsequent sections to assemble the SmartRow DCR.
Figure 4.4 Componentsof two Liebert PDX/PCW installation
NO. DESCRIPTION NO. DESCRIPTION
1 DCR Top Plenum(s)-Rack 6
PDX/PCW sections (thermal-management unit
behind Control Panel and Fire-suppression
system/DCR Control-panel shell)
2 Emergency Ventilation Fans 7 DCR network rack
3 DCR Top Plenum(s)-PDX/PCW 8 DCR server racks
4
DCR Control Panel
and Fire-suppression System
9 DCR Control-panel Shell
5 DCR Base Plenum-PDX/PCW
4.2 Install the DCR Base Plenum-PDX/PCW First
NOTE: This Base Plenum for the PDX/PCW must be installed first and positioning is critical to the
remaining installation.
1. Position the DCR Base Plenum-PDX/PCW where the power and refrigerant connections can be
made easily.
Connections will be made either through the DCR Top Plenum-PDX/PCW or the DCR Base
Plenum-PDX/PCW, depending on the Liebert PDX/PCW system selected. This selection
correlates with the selection of a top-fed unit/bottom-fed unit. (The top and base plenums for
the Liebert PDX/PCW and DCR Control Panel and Fire Suppression System module are wider
than the plenums for the DCR racks (DCR Base Plenum-PDX/PCW or DCR Top
Plenum-PDX/PCW).
Vertiv | SmartRow DCR Installer/User Guide | 18
2. Check the DCR Base Plenum-PDX/PCW installation position to ensure that it meets the
required clearances; refer to Clearance Requirements on page13.
NOTICE
Risk of severe cabinet and system stress. Can cause equipment damage and improper
operation.
Do not move the SmartRow DCR after assembly. This unit is not designed to be moved after
assembly. Movement without properly disassembling the SmartRow DCR can damage internal
components, reduce unit stability and void the warranty.
Floor anchoring, if required, should not be performed until after the entire base plenum
assembly has been completely assembled and leveled.
3. Remove the plenum side plate cover attached on the interior of the Primary DCR
BasePlenum-PDX/PCW (DCR-A-300PDX). This will be installed on the last base plenum in the
row.
4.3 Assemble the DCR Base Plenums-Rack
The base plenum-rack assembly supports the SmartRow DCR and distributes supply air to the DCR
Racks.
1. Apply the factory-supplied, D-shaped gasket material to the side of the DCR Base Plenum-
Rack that faces the DCR Base Plenum-PDX/PCW as shown in Figure 4.5 below.
The gaskets are cut to the correct length at the factory.
The gasket must be applied continuously along the profile edge of the plenum frame.
Apply pressure to the gasket to make sure it adheres to the frame.
2. At each corner, form a 1-in. to 1.5-in. radius, Figure 4.5 below.
3. When you reach the starting point, form a sealed joint by butting the start and finish edges
together, Figure 4.5 below.
Figure 4.5 Gasket applied to side of base plenum
NO. DESCRIPTION
1 Gasket 1-in. to 1.5-in. corner radius
2 Gasket start and finish
Vertiv | SmartRow DCR Installer/User Guide | 19
4. Place the first DCR Base Plenum-Rack beside the DCR Base Plenum-PDX/PCW.
Ensure that gasket side of the DCR Base Plenum-Rack faces
theDCRBasePlenum-PDX/PCW,Figure 4.6 below:
The front of each DCR Base Plenum-Rack must be oriented with the rack placement
inmind.
The front of the DCR Base Plenum-Rack has louvers.
The front of the DCR Racks have a door with a transparent acrylic sheet.
Figure 4.6 Correct orientation of base plenum sections and required side gaskets
NO. DESCRIPTION
1 Gasket
2 DCR base plenum
3 Rack base plenums
4 Side plate cover (shipped loose)
5. Attach the DCR Base Plenum-Rack to the DCR Base Plenum-PDX/PCW with (4) 9-mm long
spacers that are factory-installed on the right-hand side of each rack plenum.
6. Using the factory-supplied Nylock nut and washer, secure the plenum faces together but do
not tighten them at this time.
IMPORTANT! Do not tighten any Nylock nuts at this time. The Nylock nuts must remain loose to
permit additional assembly steps.
7. Apply gaskets to the remaining DCR Base Plenums-Rack, referring to Figure 4.6 above, then
attach each plenum to the adjacent plenum assembly with the factory-installed spacers and
factory-supplied Nylock nuts and washers.
8. If installing system with a single PDX/PCW unit, attach the shipped-loose, side plate cover to
the outside of the final base plenum (see Figure 4.6 above).
or
If installing a second PDX/PCW unit, do not install the side plate cover until instructed to do so
in section Installing a Second PDX/PCW (20-kW(N+1)/36-kW(N)Configuration) on page36.
9. Use a 3/4-in. (19-mm) wrench to adjust the leveling feet so that the assembled base plenum is
level. Use a carpenter’s level to make sure the plenum assembly is completely level both front-
to-rear and side-to-side, Figure 4.7 on the facing page.
Vertiv | SmartRow DCR Installer/User Guide | 20
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70
  • Page 71 71
  • Page 72 72
  • Page 73 73
  • Page 74 74
  • Page 75 75
  • Page 76 76
  • Page 77 77
  • Page 78 78
  • Page 79 79
  • Page 80 80
  • Page 81 81
  • Page 82 82
  • Page 83 83
  • Page 84 84
  • Page 85 85
  • Page 86 86
  • Page 87 87
  • Page 88 88
  • Page 89 89
  • Page 90 90
  • Page 91 91
  • Page 92 92
  • Page 93 93
  • Page 94 94
  • Page 95 95
  • Page 96 96
  • Page 97 97
  • Page 98 98
  • Page 99 99
  • Page 100 100
  • Page 101 101
  • Page 102 102

Vertiv SmartRow DCR Installer/User Manual

Type
Installer/User Manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI