9018-354-B1-001, Rev. A (05/2018)
Start-Up and Verification
1. Connect the powered-coax from the coaxial F connector port to the power-passing tap. When installing the coax
to the F Connector, torque to 35 in-lbs (4.0 N-m).
2. Verify that the unit powers up by looking at the DOCSIS Modem “POWER” LED.
Coaxial F Connector
Port (Provides power
to the SMG via a
power passing tap as
well as data backhaul
and status monitoring
to the HFC network)
Status LEDs
DS
US
ONLINE
LoRa
RF levels at the power-passing tap need to be balanced according to WiFi HFC Plant RF Design Specications.
NOTICE:
Status LEDs and Indications
LED or
Connector
Status Behavior Indication
LoRa
GREEN
OFF / ON Module is initializing
ON
Module is operational with an application (e.g. Packet
forwarder) running. LoRaWAN uplink and downlink packets
are supported.
RED
OFF / ON
Failure related to interfaces - technician to check
connections, run interface Built in Self Tests (BIST), check
software versions and upgrade if required.
ON Unit is in fault condition and requires service
ONLINE:
(Online status)
GREEN
OFF No Communications Activity
OFF / ON
Flashes while performing early authentication, IP
connectivity, BPI intialization.
ON Online and Operational
US: Upstream
ranging and
registration lock
GREEN
OFF No power, upstream frequency undetermined
OFF / ON Power on, downstream locked, upstream frequency ranging
ON Initial CM ranging completed
DS: Downstream
RF Carrier
detection and
lock
GREEN
OFF No Power / Downstream Carrier
OFF / ON Power on, downstream carrier frequency searching
ON Downstream carrier lock
For LoRaWAN operational details refer to the SMG-00LI-01 Technical Manual (PN: 018-354-B0-001).
NOTICE: