523-16

Sioux Chief 523-16, 523-1620, 523-1624, 523-24, 523-2MS2, 550-11, 550-12, 550-20E Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Sioux Chief 523-16 Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Position tube or conduit into base of TouchDown
clamp.
Ratchet bridge of TouchDown clamp down over
both posts evenly.
Slide TouchDown clamps to desired location
within the bracket.
Locate holes on bracket and secure bracket to
⅜" threaded rod using washers and ⅜" nuts. If
desired, hardware can be installed both above
and below bracket. Install double nut if specied.
Power Bar Mini Strut
Installation Guide
1 2
4
3
Additional TouchDown clamps can be purchased
in bulk and added to the bracket before installing
threaded rod. Ideal when running exible gas
lines.
522-5501
550-20
For larger pipe sizes or when insulation is
required, use the TouchDown II clamp (purchase
separately) and install on the bracket with the
screws provided.
#IS-523-2MS
Power Bar Mini Strut
Installation Guide
523-2MS 523-2MS2
523-2MS3 523-2MS4
/