Gleason Reel Workstation Assembly-Dual Column Workstations Assembly Instructions

Type
Assembly Instructions
MOUNT BASE- Bench leg base mounts under feet and
around back side of leg. Assemble bases as shown
above. Position bench on bases so that pockets for verti-
cal columns clear bench top. Select proper side plates to
form boxes around legs. Securely bolt feet and back of
legs to bases. Workstation performs best when vertical
column is plumb. Shim as necessary. NOTE: Alternate
types of bases shown at right.
WORKSTATION KIT
ASSEMBLING TO TYPICAL WORKBENCH
OVER
Bin Bar and Swing Arms are
optional accessories and may not
be included with basic kit. Only
mounting brackets for swing arms
shown for clarity. Complete
assembly instructions included
with swing arm kits.
NOTE: Roll optional trolley into
rail before installing end stop.
Bench by others.
HUBBELL
WORKPLACE SOLUTIONS
.
600 S. Clark St. • Mayville, WI 53050-0026 • Phone 920-387-4120
#WS50-MP
UNIVERSAL
BASE
Fastens to back of
bench
#WS50-BBR &
WS50-BBL
TABLE BRACKET
Predrilled for
Equipto & Lyon
benches.
FIRST STEP:
Assemble bases and
attach securely to
workbench.
#WS50-TB
MOUNTING
BASE
Best used on
butcher-block
bench tops.
Bulletin #625533 Rev B
July 1995
Printed in USA
TYPICAL
CUBIT BENCH KIT
ASSEMBLED
1- ALIGN parts in order of assembly.
2-SET (position) parts as desired.
3-TIGHTEN bolts, clamping parts to rails.
Add attachments to suit.
PROCEDURE
DPROCEDURE
E
PROCEDURE
B
PROCEDURE
E
PROCEDURE
A
PROCEDURE
F
PROCEDURE
C
HUBBELL
®
Workplace Solutions
Workstation kit assembly requires two wrenches or a socket set (sizes shown on
reverse side), tape measure, and level. First, assemble bases and mount to bench.
Second, assemble workstation to bases. Components must be assembled in prop-
er order (1-ALIGN), positioned in desired location (2-SET) and clamped securely in
place (3-TIGHTEN). Refer to picture of unit at left and typical assembly procedure
on reverse side. After assembly, adjust components to suit.
AB
B
B
C
DEF
A
A
C
C
D
D
E
E
F
F
TYPICAL ASSEMBLY STEPS TYPICAL PROCEDURES
BASES ATTACHMENTS ARMS & BOOMS ANGLE BRACKET HANGERS END STOPS & HOOKS
11ALIGN
Align components in
assembly order.
22SET
Position components
as desired.
33TIGHTEN
Clamp each part to rail by
securely tightening bolts.
1/2”
13mm 9/16”
14mm
WRENCHES
REQUIRED
  • Page 1 1
  • Page 2 2

Gleason Reel Workstation Assembly-Dual Column Workstations Assembly Instructions

Type
Assembly Instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI