Allied Brass CV-26D-ABZ, CV-26D-GYM, CV-26D-PEW, CV-26D-SN Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Allied Brass CV-26D-ABZ Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Step1: Drill Holes in Wall for screws or screw anchors and attached Mounting plate to Wall
Determine your desired location for installation and make a mark for the location of the mounting plate. Remove mounting
plate from backplate by loosening set screw in backplate as pictured below. Place center hole of mounting plate over mark
made above. Make 2 marks where mounting screws will be placed as shown below. Drill hole at each of the marks. (You may
substitute other style mounting anchors or screws if desired). Place anchors into the holes made. Place mounting plate over
holes and secure to mounting surface using screws as shown below.
No portion of this document or any artwork contained herein should reproduced in any way without the written consent of ALLIED BRASS INC.
INSTALLATION INSTRUCTIONS
CV-26D
MOUNTING PLATE
DRILLED HOLES
DRILLED HOLE
ANCHOR
SCREW
SET SCREW
MOUNTING PLATE
Step2: Attach Bracket to Mounting Plate
Place bracket on mounting plate and secure by tightening set screw as shown below.
MOUNTING PLATE
SET SCREW
BACKPLATE
BACKPLATE
/