Mark GSW+ 30, GSW+ 40, GSW+ 50, GSW+ 70 Technical Manual

  • Hello! I am an AI chatbot trained to assist you with the Mark GSW+ 30 Technical Manual. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Technical manual
EN
MARK GSW+
0660302_R07
Index
Warranty policy 3
1 General information 4
1.1 General recommendations 4
1.2 Description of the units 4
1.3 Operation 5
2 Technicalspecications 6
2.1 Specications 6
2.2 Relationship load / performance 6
2.3 Description of the components 7
2.4 Dimensions 8
2.5 Electrical overview 9
3 Installation 10
3.1 General rules 10
3.2 Securing of the unit 11
3.3 Connectionoftheuepipeandairsupply 12
3.4 Connection condensate pipe 16
3.5 Gas connection 17
4 Controls 18
4.1 Comtherm 18
4.2 Connection of the control 21
5 Commissioning 22
5.1 Commissioning 22
5.2 Burner setting 23
6 Troubleshooting 24
6.1 Troubleshooting 24
6.2 Spare parts 25
7 Maintenance 26
8 Recommendations for the end user 28
8.1 Safetyrules 28
8.2 What to do in case of a problem? 28
2
Warranty policy
CE-marking
ThereleaseoftheCE-markingistheofcialrecognitionofthequalityofdesign,manufacturerand
performance of this unit. The life and performance will be at the highest level when the implementation
andmaintenanceareproperlycarriedoutanddonebytheregulationsinforce.
Responsibility
ThisunitmayonlybeusedforwhichMARKhasdesignedandfabricatedit.MARKcannotbeheldliablefor
damagestopersons,animalsorpropertyifitiscausedbyerrorofinstallation,controlsormaintenanceor
notpermissibleuseoftheunit.Theunitmayonlybeequippedwithoriginalaccessories.MARKcannotbe
heldliableforanydamagesresultingfromuseofanaccessorythatisnotsuitablefortheunit.
Theunitsmustbeinstalledbyqualiedprofessionals,incompliancewiththeapplicableregulationsand
inaccordancewiththeinstructionsinthismanual.Thereferencestothestandards,rulesandguidelines
mentionedinthismanualareforinformationpurposesandareonlyvalidonthedateofissuethereof.
MARKisresponsiblefortheconformityofthedevicetotheapplicablerules,guidelinesandstandards
atthetimeofcommercialization.Theknowledgeandcompliancewiththelegalprovisions,aswellas
thenormsinherentinthedesign.Projectplanning,startupandmaintenancearetheresponsibilityofthe
consultant,theinstallerandtheuser.
Delivery – Storage
TheGSW+isdeliveredonawoodenpallet,protectedbyacardboardboxandaplasticlm.Immediately
afterarrival,theconditionoftheunitdeliveredmustbechecked(evenifthepackagingisintact).
Additionally,ensurethatthedevicedeliveredcorrespondswiththeorder.Withregardtotheproduct
warranty:thegeneralconditionsofMARKareinforce.
3
1 General information
1.1 General recommendations
Thegas-redcondensingairheateroftheGSW+seriesareintendedfortheheatingofindustrialand
relatedareas.Theunitsmayonlybeinstalledinside.Theunitsmayonlybeusedinwellventilatedareas.
The proper functioning of the heater depends on proper installation and commissioning.
Installationandmaintenancemustbeinaccordancewiththeapplicableregulationsandbecarriedoutby
qualiedpersonnel.Withthenon-complianceoftheserulesallresponsibilityofthemanufacturerexpires.
DONOTINSTALLGAS-FIREDCONDENSINGAIRHEATERSIN:
–Roomswithexplosionrisk;
–Roomscontainingchlorinefumes(orcombinationsthereof);
–Veryhumidrooms(electricalhazard).
Itistheresponsibilityoftheinstallertoensurethatduringassemblytheinstallationinstructionsdescribed
arefullled.
Itisexpectedfromtheinstallerto:
1°)informtheuserthat:
Theusermaynotmodifythedesignoftheunitsortheimplementationofthesystemapplication;
–Anymodication(exchange,omission)ofthesafetycomponentsorpiecesthataffecttheefciencyof
theunitorthecombustion,automaticallymeanstheCE-markingisexpired;
–Itisannuallyrequiredtoperformtheprescribedmaintenanceandcleaningactivities.
2°)handoverthismanualtotheuser.
This is an integral part of the unit and should be kept with the unit even if it is transferred to another
owner or user.
Weareinvolvedwiththequalityofourproductsandwishtoimprovethempermanently.Wetherefore
reservetherighttochangethespecicationincludedinthisdocument.
1.2 Description of the devices
TheGSW+gas-redcondensingairheaterisastandalonehotairgenerator,makinguseofthefuels
naturalgasorpropane.ItisbuiltandtestedtoEuropeanstandards2009/142/CE,Gasappliancedirective,
(EN1020:2009andEN1196:2011).Certicatenr.0461CN1002issued25/10/2012.
TheGSW+isagas-redcondensingairheater.Forallunitsdescribedinthismanual,theuegasesare
discharged to the outside. Use is made of a fan that is arranged on the discharge side of the combustion
chamber.Thecombustionairmaybesuckedfromtheinsideoroutside.Theseunitscanbeconnectedto
anexhaustsystem,typeC13-C33-C53,orontoachimneyoutlet,typeB23.
4
1.3 Operation
Thegas-redcondensingairheateroftheGSW+seriesareintendedfortheheatingofindustrialand
relatedareas.TheGSW+airheatersconsistofagas-redboilerandahotwatercoil,placedinthe
airow.Theairthatisblowninbythefanwillbeheatedbythecoil.Thistechniqueprovidesaperfect
homogeneityoftheairtemperature.Unlikeaconventionalairheater,thepartialorcompleterestrictionof
airoworaninterruptionoftheelectricalpowerduringoperationwillnotdamagetheunit.
Thecombustionsectioniscompletelyisolatedfromtheaircircuit,whichmakesitimpossibleforthe
systemairtomixwiththecombustiongases.TheunitisequippedwithaburnerwithlowNoxemissions.
Thecombustionairissuckedinbyafanwithavariableowrate.
Theairissuckedinbyaventurisystem.Thissystemmakessurethatthegasandairovertheentirerange
areintherightproportion.Theair/gasmixtureisfedtotheburner,locatedinthemiddleoftheboiler.
Theameandfumeswillgothroughtheheatexchangertwicetogiveoffmaximumpower.Thanksto
thistechnology,anefciencyofatleast98%atthemaximumloadsand108%atfullmodulationcanbe
achieved.Theoptimizationoftheperformanceofacondensationsystemisinuencedbyitscontrols.The
lowerthepoweroutputoftheairheater,thegreaterthecondensationandthusthehighertheefciency.
ThemodulationrangeoftheGSW+is30%ofthemaximumload.
The electrical control of the air heater is connected to the room thermostat. The control device provides
the continuous modulation of thermal power.
The modulating effect of the GSW+ heater guarantees perfect adaption to the real heat demand of the
building.Inversionsequippedwithfanswithavariableowrate,onecanalsovarytheairsupply.
5
2 Technicalspecications
Axial models
Thecondensinggas-redairheatersaredesignedwithaxial
fansthatmeettheEuropeanrequirements2009/125/EC.
Optionally,theunitcanbeprovidedwithafanthathasa
variableairow.
Thedeviceisdesignedasfreeblowing,providedwith
horizontal louvres.
2.1 Specications
TYPES
GSW+ 30 GSW+ 40 GSW+ 50 GSW+ 70
max min max min max min max min
Nominalload(highervalue) kW 30 7.5 40 10 50 12.5 70 17.5
Nominalload(lowervalue) kW 27 6.5 36 9 45 11 63 16
Nominal power kW 26.5 8.2 34.9 11.5 44.1 13.6 61.7 18.3
Efciency % 98 108 98 108 98 108 98 108
∆Tofairow °C 25.6 8 28.5 8.8 27.3 8.5 28 8.7
NoxClass Val. 5 5 5 5
Gasconsumption(15°C)
NeutralgasG20(20mbar)
NeutralgasG25(25mbar)
PropaneG31(37mbar)
m³/h
m³/h
kg/h
2.86
3.16
2.10
0.72
0.79
0.53
3.82
4.21
2.81
0.96
1.05
0.70
4.77
5.26
3.51
1.19
1.32
0.88
6.68
7.37
4.91
1.67
1.84
1.22
Airdisplacement(15°C) m³/h 3000 900* 3600 1080* 4700 1400* 6400
Motor:electricalpower/RPM W/RPM 220/1000 320/1350 500/1350 520/900
Combustion air ø mm 80 80 80 80
Gasueø mm 80 80 80 80
Condensation connection ø mm 32 32 32 32
Gas connection ø 1/2”M 1/2”M 1/2”M 1/2”M
Electrical connection 230/240VIF~50Hz
Electrical power W 340 460 640 730
Watervolume(glycol-15°C) L 6.6 7.2 9.2 11.2
Operating temperatures °C -15/+40 -15/+40 -15/+40 -15/+40
Max.condensateamount l/h 1,8 2,4 2,9 5,2
Weight kg 88 99 110 135
* With modulating EC-fan.
6
2.2 Relation load / efciency
Thepowerratingsapplywithanairreturntemperatureof16°C.Theefcienciesweredeterminedata
waterregime54°C/80°C(maximumpower)and29°C/38°C(minimumpower).Theefciencyvariesin
function of the air return temperature.
2.3 Description of the components
Axialfan
Lineprint
Stainless steel boiler
Burner controls
Gas valve
Siphon
Burner door
Gasmixer
Combustion air fan
Waterowsensor
Temperature sensor
Overowvalve
Water pressure sensor
Pump
Expansiontank
Horizontallouvre
window
 Air/waterheat
exchanger
Gas pipe complete
Ef. %
108
107
106
105
104
103
30
102
40
50
101
70
100
99
98
5 10 15 20 25 30 35 40 45 50 55 60 65 70
Power
(kW)
7
1
2
3
4
5
6
789101112
13
14
15
16
17
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
18
2.4 Dimensions
A B C E F G I J K L M N
P
(Air)
Q
(Gas)
GSW+ 30 1079 574 605 120 470 280 450 625 350 400 90 165 80 80
GSW+ 40 1080 624 605 120 470 280 450 674 350 400 90 165 80 80
GSW+ 50 1192 674 605 120 470 280 450 724 350 400 90 230 80 80
GSW+ 70 1277 774 605 120 470 280 450 824 350 400 90 320 80 80
Dimensionsinmilimeters(mm)
8
C
B
A
Q
P
E
F
G
J
N
M
I
L
K
9
2.5 Electrical overview
Comthermsupply(JP18)
Blue-Above
Orange - Center
(seephotoonpage20)
Water pressure sensor
Waterowsensor
Exhausttemperaturesensor
Retour water temperature
sensor
Inletwatertemperaturesensor
Room temperature sensor
ModBus
PWMmodulatingfan
(option)
230Vpowersupply
Maximalthermostat
230Vfanpowersupply
230Vpumppowersupply
230VPowersupply
PWMsignal
Ionizationelectrode
Combustion air vent
Igniteelectrode
Burner control terminal
10
3 Installation
Theinstallationofthegasunitsmustbedonebyqualiedandcompetentpractitioners.Themethodof
installationdependsonthearea,volume,ventilationfacilitiesandthepossibilitiesthatexistforueand
combustionair.Thisistobedeterminedbytheinstaller.
3.1 General rules
Thecondensingunitcanbeinstalleddirectlyinthetobeheatedroom.Theinstallationmustcomply
withnationalandlocalregulations,particularlyintheeldofappliedfuels.Theinstallermustabidetothe
regulationsinforce.Ifindoubt,askforinformationwiththecontrol-andsafetyregulators.
Aeration
Areaswhereadevicethatworksongasisplaced,musthaveapermanentventilationinaccordancewith
therulesinforceinthecountryofinstallation.
Drainage of the condensate
Theairheatermustbeequippedwiththeincludedsiphontodrainthecondensewater.Itisapartof
thesafetysystem,eachreplacementbyanotherunapprovedtypeisstrictlyprohibited.Thedrainageof
thecondensatemustbecarriedoutinaccordancewiththeapplicablerequirementsinthecountryof
installation.
Gas connection
Beforeconnectingtheunit,youmustmakesurethatthelocalgassupply(typeofgas,pressure)matchthe
settings of the unit that must be installed.
Note:minimumdistancesareessentialforthemaintenanceandsafetyoftheunit.
500 mm
200 mm
300 mm
2500 mm
3.2 Securing the unit
Theunitsthatareconnectedusingaxedgaslinemustbeinstalledrigid.Tomaketheinstallationeasier
we recommend the use of our adjustable hanging brackets. These are adapted to the unit and will position
itincompliancewiththeminimumdistances.Asformounting:consultthemanualdeliveredwiththe
brackets.
Beforetheunitisattachedyoushouldcheckthecarryingcapacityofthewall.
Step 1
Assemblethemountingbracketusingtheenclosedinstructions.
–Attachthemountingbrackettothewall.Attachthiswithmaterialsuitableforwallmounting.Performa
safetytest,safetyfactor2,tocheckthermness.
Step 2
–Fixtheunittothebracketusingthesuppliedscrews.Securethescrews.
– LevelofftheapplianceusingtheM8adjustmentscrew.
Step 3
–Openthelouvresonthefrontofthedeviceatleast45°sothattheaircanfreelyowout.
11
Position 1 Position 2
12
3.3 Placement combustion gas discharge and air supply
TheGSW+unitsaresuitableforfollowingdrainagesystems:C13,C33,C53,B23.Theuegasdrainage
systemmustcomplywithnationalandlocalregulations.Theextensionpipesmusttoleratecondensateand
besuitableforauegastemperatureof100°C.Flueoutletsmustbeofpolypropyleneorstainlesssteel
316L.Thedrainagematerialmustbepositivelyaccessedfortheapplicationofgas-redunits.Thispositive
assessmentmustbedonebyanISO17025accreditedbody.
Theconnectionoftheuegasmustbeplacedoutside.Fortheintakeofcombustionaircanbechosen
from:
withtheintakeofcombustionairfromtheoutside(type“C”);
withtheintakeofcombustionairfromtheroomwheretheheaterisinstalled(type“B”).
Theuseduepipes,terminalsandaccessoriesmustbetested.Useonlysuctionanddischargeterminals
referencedbyMark.Withtheuseofnon-approvedequipmentthewarrantywillexpire.
Placement of the air inlet ring
Unitsthatreceivethecombustionairfromtheinstallationarea(type“B”)mustbettedwithaprotective
grate.Thistopreventlargepartsofcontaminationfromcomingintothecompartmentoftheunit(gures
A).InstallationareaswhereinatypeBunitisinstalledmusthavesufcientairsupply.Atleast100m3/hper
unit.
Unitswherethecombustionairisdrawnfromoutside(type“C”)mustbeprovidedwiththesupplied
mountingring(guresB).
Theextensionsmustbeprovidedwithalipring.Usesoapywatertoeasilyconnectthem.
A1 A2 A2
B1 B2 B3
13
Connection of the extension pipes type C33 and C13
Closedcombustionrelativetothesurroundings.Theextensionpipesofthecombustionairanduegasare
horizontallyorverticallyplacedoutsidetheinstallationarea.Theextensionpipesmayonlypassthroughthe
installation area.
C33verticaldrainagesystem C13horizontaldrainagesystem
Installationexample:
1 connection ring ø 80
 1extensionpipeø80,L=250mm
2curvesø80,90°
1transitionpiece:2xø80toø80/125
1 concentric wall or roof terminal ø 80/125
Theconnectionpipescanbeextendedwithforthispurposesuitablematerials.Thepipediametershould
beatleastequaltotheconnectorontheunit.Neverreducethepipediameterorplugtheventholesin
the installation area.
Don’tplacetherooforwallue:
– onlessthan2mfromaventorwindow/doorway,takethedilutionfactor(NEN2757andother
nationalandregionalregulations)intoaccount;
– inatransitzone;
– atlessthan2mfromthegroundordirectlyaccessible(riskofobstructionand/orcombustion).
NOTE
Thesealsbetweentheextensionmustbecloseandtight,makesurethelipringsarepresent.Thetotal
lengthshouldnotexceed8m,assumingthat:1angleof90°of45°=1mpipe.Inahorizontalsection,ensure
thattheextensionpipelieswithaslopetotheunit,toavoidoutowofthecondensation.
5
3
2
4
1
1
2
3
4
5
5
1
3
4
2
14
Connection of the extension tubes type B23
Non-closedcombustionrelativetothesurroundings.Thecombustionairisdrawndirectlyfromthe
installationareaandtheuegasgoesthroughaverticalpipethroughtherooforahorizontalpipethrough
thewall.Theextensionpipesmayonlypassthroughtheinstallationarea.
B23Horizontal B23 Vertical
3
1
2
1
2
NOTE
Thesealsbetweentheextensionmustbecloseandtight,makesurethelipringsarepresent.Thetotal
lengthshouldnotexceed8m,assumingthat:1angleof90°of45°=1mpipe.Inahorizontalsection,ensure
thattheextensionpipelieswithaslopetotheunit,toavoidoutowofthecondensation.
Installationexample:
Extensionpipeø80,L=250mm
Protection louvre
Bendø80,90°
Wall duct ø 80
Thewalloutletcanbeextendedwithapproved
pipes and elbows. The pipe diameter should be at
leastequaltotheconnectorontheunit.Never
reduce the pipe diameter or plug the vent holes in
theinstallationarea.Itisrecommendedtouse45°
bends.
Do not place a wall duct on less than 2m from the
ventilation,doororwindow,ofthegroundorina
transit zone.
Installationexample:
Extensionpipeø80,L=250mm
Protection louvre
Adhesiveplate(optional)
Roof duct ø 80
Thewalloutletcanbeextendedwithapproved
pipes and elbows. The pipe diameter should be at
leastequaltotheconnectorontheunit.Never
reduce the pipe diameter or plug the vent holes in
theinstallationarea.Itisrecommendedtouse45°
bends.
3
1
2
3
1
3
15
Connection extension pipes type C53
Closed combustion relative to the surroundings. The combustion air will be drawn from outside. The pipe
shallbeplacedhorizontal.Theuegasshallbebroughtoutvertically.Theextensionpipesmayonlypass
through the installation area.
C53 Vertical
NOTE
Thesealsbetweentheextensionmustbecloseandtight,makesurethelipringsarepresent.Thetotal
lengthshouldnotexceed8m,assumingthat:1angleof90°of45°=1mpipe.Inahorizontalsection,ensure
thattheextensionpipelieswithaslopetotheunit,toavoidoutowofthecondensation.
Installationexample:
Connection ring ø 80
Bendø80,90°
Wall duct ø 80
Extensionpipeø80,L=250mm
Roof duct ø 80
Adhesiveplate(optional)
Theinletanduegasmaybeextendedwithapprovedpipesandelbows.Neverreducethepipe
diametertoadiametersmallerthantheconnectiontothedevice.Neverclosetheairinletopenings.Itis
recommendedtousebendsof45°insteadof90°.If90°bendsareunavoidable,donotapplymorethantwo
pieces.
1
2
3
4
5
1
5
3
2
4
6
16
3.4 Connection condensate pipe
Thegas-redcondensingairheatermustbettedwithasiphontodrainthecondensatewater.The
suppliedsiphonmustbettedduringinstallation.Notethatthedischargeofthecondensatemustbe
carriedoutwithmaterialwhichisresistanttoacidwaterwithapHof3.Neverusecopperorgalvanized
ironpipes.ForthedisposalofcondensedwateryoumustusePVCpipeswithadiameterthatisequalto
thisoftheunit(PVCØ32).Makesurethepipingisplacedonsufcientslope.Checkthetightnessofthe
plumbingofthecondensate.Beforeusingtheunit,llthesiphonwithwaterthroughthellercap.This
avoids that combustion gas will get into the sewer during the start-up.
Anti-freeze protection
Thecondensatedrain,includingthesiphon,mustbeprotectedagainstfrost.Itispreferredtokeepthe
drainsfrost-freeasbestaspossible.Incasetheyfalloutsidethebuilding,thepipepartbehindthesiphon
shouldbeopentoavoidtheformationoficewhichwillblockthedischarge.Takethenecessaryprecautions
toavoidsuchanincident,asthismaycauseirreversibledamagetotheheater.
Neutralization of the condensate
Theacidityofthecondensatefromthecombustionofnaturalgasis3,5-3,8pH.Incertainregionsitis
requiredthatthecondensatemustbetreatedbeforeitcanbedischarged.Inthesecasesyoushouldtake
on a neutralization kit in the condensate circuit.
Included in
delivery
No
delivery
Filler
Acidwater
Neutralization kit
Neutralized
condensate
17
3.5 Gas connection
Foremostyoushouldcheckwhetherthedeliveredunitismadeforthegasthatunitwillbeconnectedto.
Thisdataofthedeviceismentionedonthetypeplateontheinsideofthedoor.Thegassupplymustbe
suitablefortheloadofthedeviceandmustbeequippedwithallthesafetyandcontroldevicesrequiredby
theregulationsinforce.Thediameterofthepipemustbeaccuratelydetermined.Importantfactorsforthis
are,amongothers,thegasowandthelengthandrouteofthepipes.
Themaximumallowablelinelossesmaynotbegreaterthan5%ofthenominalsupplypressure.Thegas
connections must be installed in accordance with national and regional regulations and must be performed
byauthorizedpersonnel.Beforecommissioningtheunitmustbepressuretestedinaccordancewiththe
applicableregulationsandbecleaned.Themaximumallowablepressureofthegasis60mbar.
Note,beforeopeningthegasyoumustcheckthesealonthethrottle.
Gas connection:
Connectionpressurenaturalgashigherthan50mbar;
connectionpressurenaturalgaslowerthan50mbar;
LPGsupply.
Gas connection set:
Gasket(supplied);
Suitableconnection(supplied);
Gaspressureregulator;
Filter;
Gas tap.
A
B
C
1
2
3
4
5
A
B
C
1
2
3
4
5
18
4 Controls
4.1 Comtherm
The Comtherm is a modulating temperature controller. The room temperature sensor is integrated in the
housingofthecontroller.TheComthermisequippedwithaclockfunction,day-nightcontrol,continuous
runningfanandcontinuesdaytime.Basedontheprevailingroomtemperatureandthedesiredtemperature,
thecapacityisdetermined.Thecontrollerstandardlycomeswitha9metercable.Maximumcablelengthis
100m. The cable must be shielded.
ForfurtherinformationabouttheComtherm,pleaserefertothemanualofthiscontroller.AComtherm
can control one GSW+.
19
Connection diagram
Condensing air heater
Maintenanceswitch230Vac
Comtherm
Room sensor
C
A
B
D
A
B
C
D
20
Supply Comtherm (Connector JP 18)
RS 485 Bus connector
/