Rosewill RSR-4P42U001 42U Open Frame Standing Server Rack Cabinet User manual

  • Hello! I am an AI chatbot trained to assist you with the Rosewill RSR-4P42U001 42U Open Frame Standing Server Rack Cabinet User manual. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
4-Post Open Frame Rack Series-Heavy Duty
RSR-4P42U001
4-Post Open Frame Rack Series-Heavy Duty
RSR-4P42U001
Name
1.1 Rack Components
1.2 Rack Assembly Hardwares
1.3 Equipment Mounting Hardwares
1.4 Cable Management Hardwares
1.5 Casters and Hardware
1.6 Tool Kit
Qty.(pcs)
Left” Vertical Rail
RightVertical Rail
Base Bracket
Corner Section
Center Section
Top Bracket
M8 Bolt
M8 Washer
M6 Cage Nut
PVC Cup Washer
Cable Management Hook
Hook Mounting Screw
M8 Screw
M8 Flat Washer
M8 Flange Nut
M8 Wrench
Phillips Screwdriver
M6 Phillips-Head Screw
S/N
Casters(With Brake)
2
2
2
8
4
2
48
48
50
50
50
24
24
4
16
16
16
1
1
1.5 Casters and Hardware
⑦ ⑧
⑨ ⑩
⑫ ⑬
⑭ ⑮ ⑯ ⑰
4-Post Open Frame Rack Series-Heavy Duty
RSR-4P42U001
Assembly the top and bottom beams( 4 total) as shown below, adjusting for your desired mounting
depth(22" to 40" available) using the numbers indicated on the center section pieces ( see below
chart )
Verfiy packaging contents before proceeding with assembly!
5 6 7 8 9 9 8 7 6 5 4 3 2 1 0 0 1 2 3 4
4-Post Open Frame Rack Series-Heavy Duty
RSR-4P42U001
Needs:
1x Top Beam (consist of )
2x Top Beam (consist of )
1x Left Vertical Rail
1xRight Vertical Rail
2x Base Bracket
2x Top Bracket
8x M8 Bolt ,Washer ⑦⑧
Use one top beam ( and one bottom beam ( )
assembled in step 2.1 ,line up one left and one right
vertical rails, followed by a base and top bracket by
using M8 bolts with washers as shown below:
)
4-Post Open Frame Rack Series-Heavy Duty
RSR-4P42U001
Needs:
1x Top Beam (consist of )
2x Top Beam (consist of )
1x Left Vertical Rail
1xRight Vertical Rail
8x M8 Bolt ,Washer ⑦⑧
Use one top beam ( and one bottom beam ( )
assembled in step 2.1 ,line up one left and one right
vertical rails, followed by a base and top bracket by
using M8 bolts with washers as shown below:
)
4-Post Open Frame Rack Series-Heavy Duty
RSR-4P42U001
Use the M6 screw,flat washer and flange nut( ) to install casters on the four corner base
bracket.
3.2
Install the Casters
WARNING ! Please ensure that the rack is fully assembled with all included parts and hardwares before
attempting to mount any rack equipment.Failure to install and fully tighten any hardware could severely
compromise the structural integrity of the rack.If any hardware is missing,please contact Rosewill.com
customer service immediately.
5
RSR-4P42U001
/