REV B
8 AWP • IWP • CWP • SP • GR Part No. 145159
Installation Instructions
PROCEDURE
9 Using Illustration 5 as a guide and working at the
extension side of the gas strut, insert a flat
blade screwdriver between the indent of the
plastic ball socket and retaining clip. At the
same time, carefully move the retaining clip
away from the socket and install the lower half
of the gas strut onto the ball stud. Remove the
screwdriver from the retaining clip and plastic
ball socket, making sure the retaining clip fully
seats around the ball socket.
10 After the installation is complete, open and
close the entry gate to ensure it is working
properly.
Result: When the entry gate is opened and
closed, the gate slides inside the vertical
channel of the platform. Proceed to step 11.
Result: The entry gate is not opening and
closing properly. Contact the Genie Industries
Service Department at one of the telephone
numbers on this page.
Finish the Installation
11 Perform function tests. Refer to the operator's
manual on your machine.
12 Return the machine to service.
13 Upon completion of this installation, fill out and
sign the attached Completion Form and fax to
Genie Industries. This will serve as verification
that you have completed Campaign Bulletin
090007.
If you have any further questions regarding these
instructions or need assistance, please contact the
Genie Industries Service Department at one of the
following telephone numbers:
United States: 800-536-1800
Canada: 425-881-1800
Europe: UK 0044 1476 584 333
France 0033 237 260 986
Germany 0049 422 149 1821
Iberica 0034 935 725 380
Scandinavia 0046 3157 5154
other locations 0031 653 221 908
Middle East: 0097 143 391 800
or 0097 150 459 7937