YARWAY NARVIK DESUPERHEATERS
PED/ATEX - OPErATing AnD SAfETy inSTrucTiOnS
WARNING
For safety reasons, it is important to take the
following precautions before you start work
ontheDSH*:
1. Read all labels fitted to the DSH* and
this sheet before installation, operation
ormaintenance.
2. Use DSH* for the intended purpose (according
contract/specification).
3. Remove the DSH* carefully from its
packaging, lifting by means of straps (heavy
weight) around the body.
4. Do not use the water inlet connection, yoke,
actuator or any of its accessories for lifting.
5. For installation of the DSH* use gaskets
and bolting material in accordance with the
relevant piping code (ASME/ B31.1 or EN) and
free of ‘forces, moments and torques’.
6. Additional mounting/modifications on DSH’s*
are not allowed without approval from Yarway.
7. The line must be depressurized, drained,
vented and cooled down before installation.
8. Handling of all DSH’s*, actuators and
accessories must be carried out by personnel
trained in all aspects of manual, mechanical
handling/lifting techniques and standard
safety procedures, in case of doubt, consult
your Supervisor and/or safety officer.
9. Yarway does not accept liability for site work
performed under supervision of others.
10. Each DSH’s* water supply line should
be protected with its own strainer with a
maximum element perforation size of 0.1 mm.
11. Insulate the DSH* in accordance with
plantrequirements.
12. Please, follow the procedure as detailed in
theIOM**.
13. The surface temperature as defined
in 2014/34/ECAnnex II 2.2.1.2 of the
Desuperheater is a function of the system
it is built into. When installed, the surface
temperature cannot be controlled by the
manufacturer.
Before installation these instructions must be fully read and understood
!! Read all warning labels fitted to the DSH*
before operation or maintenance !!
Never open, dismantle or modify the assembly
whilst under pressure/temperature or other
hazardous conditions.
NOTE
DSH* = Desuperheater
IOM** = Installation, Operation and
Maintenancemanual
VCOSI-03351-EN 15/12
INSTALLATION
1. Place the DSH* with the gasket onto the
mounting flange and insert the nozzle
carefully into the branch pipe.
2. Ensure that the spray nozzle assembly is
pointed with the direction of the steam flow
before tightening the mounting bolts.
3. Installation may be vertical or horizontal
piping (use support in case of heavy weight),
but the direction of water injection should
always be with the steam flow.
4. When there are positive shut-off
components in the water supply (including
electric actuators) then a safety relief
valve, of an approved type, should be fitted
(seeexample in the IOM**).
5. Connection of electrical supplies and/or
air piping should be in accordance with
themanufacturer’s instruction manual.
6. Verify and adjust, if necessary, set
points for air filter regulator and valve
positioner, following the manufacturer’s
recommendations.
7. When satisfactory co-ordination between
signals and temperature are attained,
adjustment of the set point can be made
and the system transferred to automatic
operation.
8. Ensure easy access of the operating
mechanism (actuator, positioner,
handwheels, etc.) if applicable.
CATEGORY
DSH’s* are manufactured in accordance with
2014/68/EC.
Pressure/temperature limits are indicated:
# on the DSH* nameplate
# design code: ASME B16.34, EN 12516 or
ASME B31.1
# on the actuator name plate