EMOH HTB101-12 Installation guide

Type
Installation guide
INSTALLATION INSTRUCTIONS FOR HOLDBACKS
1
Lightly mark points on the wall where
the Base will be mounted.
Drill 1/8” pilot holes at the pencil marks
for wood trim and stud installations.
For drywall installations, follow the
instructions at the bottom of the page.
Install the Base to the wall
with 2 screws.
Screw the Rod onto the Base and then the Finial onto the rod until finger tight.
Wrap the curtain onto the holdbacks.





  
 

  • Page 1 1

EMOH HTB101-12 Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI