2
SAFETY INFORMATION ............................................. 2
Literature, Labels, and Tags .....................................3
Pressures Within The System ..................................3
INSTALLATION REQUIREMENTS .............................. 3
GENERAL INFORMATION .......................................... 3
Equipment Application .............................................3
Equipment Check ....................................................3
Unit Location ............................................................3
Clearances to Combustible Materials ......................3
Thermostat ..............................................................4
Air Filter Requirements ............................................4
Condensate Drain ....................................................4
UNIT INSTALLATION .................................................. 4
Minimum Clearance Requirements ......................... 4
Packaging Removal ................................................. 4
Rigging and Hoisting ...............................................4
Rooftop Mounting ....................................................5
Ground Level ...........................................................6
Unconditioned Spaces .............................................6
CIRCULATING AIR SUPPLY ....................................... 6
Unconditioned Spaces .............................................7
Acoustical Ductwork ................................................ 7
Downfl ow to Horizontal Conversion .........................7
ELECTRICAL WIRING .................................................7
Pre-Electrical Checklist ............................................ 7
Line Voltage .............................................................7
Unbalanced 3-Phase Supply Voltage ...................... 7
Grounding ................................................................8
Line Voltage Connections ........................................8
Low Voltage Connections - Thermostat ...................8
Blower Speed .......................................................... 9
START-UP AND ADJUSTMENTS ............................... 9
Pre-Start Check List ................................................ 9
Start-Up Procedure .................................................. 9
Air Circulation .......................................................... 9
System Cooling ....................................................... 9
System Heating - Field Installed Elec. Heat............. 9
Verifying Operation of Over-Temperature
Limit Control .......................................................... 10
OPERATING SEQUENCE ......................................... 10
Cooling Mode ........................................................ 10
Blower Mode .......................................................... 10
Heating Mode ........................................................ 10
Unit Fails to Operate ..............................................10
UNIT MAINTENANCE ................................................ 10
Refrigerant Charging ............................................. 10
Routine Maintenance ............................................. 11
Air Filters ............................................................... 11
Condensate Drain and Outdoor Coil ...................... 11
Electrical ................................................................11
Motor Lubrication ................................................... 11
Blower Compartment ............................................. 11
REPLACEMENT PARTS ............................................ 11
COMPONENT FUNCTIONS ...................................... 11
FIGURES AND TABLES ............................................ 12
Figure 9 - P6SP Components ............................ 12
Physical Data ......................................................... 13
Figure 10 - P6SP - 072 Series ........................... 13
Figure 11 - P6SP - 090 Series ........................... 15
Figure 12 - P6SP - 120 Series ........................... 17
Table 1 - Center of Gravity & Shipping Wts ........ 18
Electrical Information ............................................. 19
Table 2 - Electrical Data with Electric Heat ........ 19
Figure 13 - Wiring Diagram - 072 Series ........... 20
Figure 14 - Wiring Diagram - 090 & 120 Series . 21
Figure 15 - Wiring Diagram - 090 Series ........... 22
Figure 16 - Wiring Diagram - 120 Series ........... 23
Blower Performance Data ...................................... 24
Table 3 - Downfl ow Models - 072 Series ............24
Table 4 - Horizontal Models - 072 Series ........... 25
Table 5 - Downfl ow Models - 090 Series ............26
Table 6 - Horizontal Models - 090 Series ........... 27
Table 7 - Downfl ow Models - 120 Series ............28
Table 8 - Horizontal Models - 120 Series ........... 29
P6SP Charging Charts .......................................... 30
Figure 17 - Chart for 6 Ton Units ........................ 30
Figure 18 - Chart for 7.5 Ton Units ..................... 31
Figure 19 - Chart for 10 Ton Units ...................... 31
Installation Checklist .............................................. 32
TABLE OF CONTENTS
SAFETY INFORMATION
Safety markings are used frequently throughout this
manual to designate a degree or level of seriousness and
should not be ignored. WARNING indicates a potentially
hazardous situation that if not avoided, could result in
personal injury or death. CAUTION indicates a potentially
hazardous situation that if not avoided, may result in minor
or moderate injury or property damage.
It is the responsibility of the installer to ensure that the
installation is made in accordance with all applicable local
and national codes.
WARNING!
Improper installation, service, adjustment, or
maintenance may cause explosion, fi re, electrical
shock or other hazardous conditions which may
result in personal injury or property damage. Unless
otherwise noted in these instructions, only factory
authorized kits or accessories may be used with this
product. Non compliance may void the units warranty.