Form Addendum VC & VP (4-16) Page 1
Form Addendum VC & VP (4-16)
Obsoletes Form Addendum VC & VP (12-14)
Alternate Reector Bracket Installation
Applies to: Tubular Infrared Models VC & VP
Standard Reector Bracket Installation
2 x SCREWS TIGHTENED TO
FIX REFLECTOR
LEAVE 1/8” MIN GAP TO ALLOW REFLECTOR
TO SLIDE
Reectors are xed at point “F” with a reector support bracket and reectors are held in position
with xing screws. Fixed and sliding joints alternate along the heater at the spacings indicated
on the individual heater assembly sheets.
Alternate Reector Bracket Installation
Alternate Bracket consists of:
• U-Bolt - (1) req’d
• Lockwasher - (2) req’d
• Hex nut - (2) req’d
• Bracket - (1) req’d
REFERENCES:
1) Installation / Operation / Maintenance manual for Model VPS 120V 60Hz Gas-Fired, Tubular,
Radiant, Low-Intensity Infrared Heater - 0114 OG POD Form I-VPS (Version C.3) Part No 270683.
2) Installation / Operation / Maintenance manual for Model VCS/VCT 120V 60Hz Gas-Fired,
Tubular, Radiant, Low-Intensity Infrared Heater - 243E-0914 Form I-VC Part No 270685.
Cap Screw
Flat Washer
Keps Nut
Cage Nut
Specications & illustrations subject to change without notice and without incurring obligations.
©Nortek Global HVAC, LLC 2016. All rights reserved.
All marks are the property of their respective organizations.
O’Fallon, MO I Printed in U.S.A. (4/16)
Doc No D300525 SKU 401E-0416 FORM Addendum VC&VP (4-16)