VCS

Reznor VCS, VCT, VPS, VPT User manual

  • Hello! I am an AI chatbot trained to assist you with the Reznor VCS User manual. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Form Addendum VC & VP (4-16) Page 1
Form Addendum VC & VP (4-16)
Obsoletes Form Addendum VC & VP (12-14)
Alternate Reector Bracket Installation
Applies to: Tubular Infrared Models VC & VP
Standard Reector Bracket Installation
2 x SCREWS TIGHTENED TO
FIX REFLECTOR
LEAVE 1/8” MIN GAP TO ALLOW REFLECTOR
TO SLIDE
Reectors are xed at point “F” with a reector support bracket and reectors are held in position
with xing screws. Fixed and sliding joints alternate along the heater at the spacings indicated
on the individual heater assembly sheets.
Alternate Reector Bracket Installation
Alternate Bracket consists of:
U-Bolt - (1) req’d
Lockwasher - (2) req’d
Hex nut - (2) req’d
Bracket - (1) req’d
REFERENCES:
1) Installation / Operation / Maintenance manual for Model VPS 120V 60Hz Gas-Fired, Tubular,
Radiant, Low-Intensity Infrared Heater - 0114 OG POD Form I-VPS (Version C.3) Part No 270683.
2) Installation / Operation / Maintenance manual for Model VCS/VCT 120V 60Hz Gas-Fired,
Tubular, Radiant, Low-Intensity Infrared Heater - 243E-0914 Form I-VC Part No 270685.
Cap Screw
Flat Washer
Keps Nut
Cage Nut
Specications & illustrations subject to change without notice and without incurring obligations.
©Nortek Global HVAC, LLC 2016. All rights reserved.
All marks are the property of their respective organizations.
O’Fallon, MO I Printed in U.S.A. (4/16)
Doc No D300525 SKU 401E-0416 FORM Addendum VC&VP (4-16)
/