Reznor VCS User manual

Type
User manual

This manual is also suitable for

Form Addendum VC & VP (4-16) Page 1
Form Addendum VC & VP (4-16)
Obsoletes Form Addendum VC & VP (12-14)
Alternate Reector Bracket Installation
Applies to: Tubular Infrared Models VC & VP
Standard Reector Bracket Installation
2 x SCREWS TIGHTENED TO
FIX REFLECTOR
LEAVE 1/8” MIN GAP TO ALLOW REFLECTOR
TO SLIDE
Reectors are xed at point “F” with a reector support bracket and reectors are held in position
with xing screws. Fixed and sliding joints alternate along the heater at the spacings indicated
on the individual heater assembly sheets.
Alternate Reector Bracket Installation
Alternate Bracket consists of:
U-Bolt - (1) req’d
Lockwasher - (2) req’d
Hex nut - (2) req’d
Bracket - (1) req’d
REFERENCES:
1) Installation / Operation / Maintenance manual for Model VPS 120V 60Hz Gas-Fired, Tubular,
Radiant, Low-Intensity Infrared Heater - 0114 OG POD Form I-VPS (Version C.3) Part No 270683.
2) Installation / Operation / Maintenance manual for Model VCS/VCT 120V 60Hz Gas-Fired,
Tubular, Radiant, Low-Intensity Infrared Heater - 243E-0914 Form I-VC Part No 270685.
Cap Screw
Flat Washer
Keps Nut
Cage Nut
Specications & illustrations subject to change without notice and without incurring obligations.
©Nortek Global HVAC, LLC 2016. All rights reserved.
All marks are the property of their respective organizations.
O’Fallon, MO I Printed in U.S.A. (4/16)
Doc No D300525 SKU 401E-0416 FORM Addendum VC&VP (4-16)
  • Page 1 1

Reznor VCS User manual

Type
User manual
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI