Garage Tek GT4011EE Installation Instructions Manual

Type
Installation Instructions Manual
INSTALLATION INSTRUCTIONS
GT4011EE TWO POINT HOIST
USED W/ USED W/
STANDARD CEILING POWERTRAK
INSTALLATION INSTALLATION
SUPPLIED ITEMS METHOD METHOD
QUANTITY DESCRIPTION
1 SELF-LOCKING SAFETY BLOCK & TACKLE W/ X X
28 FT OF DROP CORDS
35 FT OF HOISTING CORD
2 WEB STRAPS W/ METAL BUCKLES X X
2 MICRO PULLEY X X
1 SHACKLE X X
1 ORGANIZER BLOCK X
2 #10 X 2 1/2" LG SCREWS X
1 SCREW EYE X X
2 PIGTAIL LAG SCREWS X
4 4 LAG SCREW X
4 WASHERS X
TOOLS REQUIRED - ELECTRIC DRIVER / DRILL & 3/32" & 7/32" BIT
TAPE MEASURE / PENCIL
STEP LADDER
SAFETY GLASSES
STUD FINDER OR SMALL BRAID NAILS & HAMMER (TO LOCATE JOIST
IF INSTALLING THROUGH DRYWALL.)
TWO INSTALLATION METHODS ARE DETAILED ON THE FOLLOWING PAGES
1 RECOMMENDED INSTALLATION W/ CEILING POWERTRAK & RING HOOKS PGS 2 THRU 4
THIS INSTALLATION REQUIRES THE ADDITIONAL PURCHASE OF CEILING POWERTRAK AND 2 RING HOOKS.
THIS INSTALLATION HAS A MUCH NICER APPEARANCE AND IS EASIER TO INSTALL & ADJUST.
2 STANDARD INSTALLATION WITH SUPPLIED PARTS PGS 5 THRU 8
THIS INSTALLATION IS DONE WITH THE SUPPLIED PARTS AND MOUNTS TO A 2X6 BOARD.
PG 1 QUESTIONS ???? CALL 1-866 664 2724 REV 1, 12/1
TWO POINT HOIST - ASSEMBLY INSTRUCTIONS
SPECIFICATIONS & OPERATION
MAXIMUM LIFTING LOAD 60 LBS
MINIMUM LIFTING LOAD 15 LBS (SEE FURTHER INFO BELOW)
MAXIMUM VERTICAL LIFT 16 FT (SEE FURTHER INFO BELOW)
MECHANICAL ADVANTAGE 3:1
THE UNIQUENESS OF THIS HOIST SYSTEM IS THE SELF-LOCKING SAFETY CLEAT. IT HAS A SPRING LOADED ARM
WHICH HOLDS THE CORD IN PLACE WHEN UNATTENDED.
WHEN RAISING AN ITEM, THE CORD SLIDES PAST THE ARM. WHEN THE CORD IS RELEASED, THE SPRING LOADED
ARM'S TEETH PRESSES AGAINST THE CORD, HOLDING THE CORD IN PLACE.
TO LOWER AN ITEM, 1) YOU MUST STAND AWAY AND THIS "OPENS" THE SAFETY ARM AND 2) THEN WHEN THE ARM IS
OPEN, YOU SLOWLY RELEASE THE CORD, ALLOWING IT TO "SLIDE" PAST THE ARM'S TEETH. THIS IS WHY A 15 LB.
MINIMUM LOAD IS REQUIRED. ie. LESS THAN 15 LBS OF TENSION WILL NOT OPEN THE SPRING LOADED CLEAT.
THE LENGTH OF THE HOISTING (PULL) CORD IS 35 FT AND THE STRAP ASSEMBLY IS APPROXIMATELY 2 FT. THE
MAXIMUM VERTICAL LIFT DISTANCE IS DEFINED AS 16 FT AND CAN BE USED IN A GARAGE WITH 18 FT HIGH CEILINGS.
----------------------------------------------------------------------------------------------------------------------------------------------------------
RECOMMENDED INSTALLATION W/ CEILING POWERTRAK & RING HOOKS
STEP 1A STEP 1B
STEP #1A: CHECK PARTS RECEIVED. WHEN INSTALLING THE HOIST USING A CEILING POWERTRAK
CHANNEL THE ABOVE PARTS W/O THE
X ARE USED.
STEP #1B: REQUIRED IS THE ADDITIONAL PURCHASE OF 2 RING HANGER HOOKS (GT9002E) AND THE
CEILING POWER TRAK (GT9150-10E). BOTH ITEMS CAN BE FOUND IN THE CEILING SYSTEMS CATEGORY
OF THE ESTORE.
PG 2 QUESTIONS ???? CALL 1-866 664 2724 REV 1, 01/12
TWO POINT HOIST - ASSEMBLY INSTRUCTIONS
STEP #2: PLAN THE LOCATIONS OF THE EYE SCREW, POWERTRAK AND RING HOOKS PER THE ABOVE
SKETCH. INSTALL THESE COMPONENTS.
STEP 2 STEP 2
STEP 3 STEP 4
STEP #3: ATTACH THE BLOCK / TACKLE TO THE EYE SCREW WITH THE SUPPLIED SHACKLE.
STEP #4: SLIDE ON THE 2 MICRO PULLEYS ON THE RING HANGERS AND FED THE DROP CORDS
THROUGH THEM.
PG 3 QUESTIONS ???? CALL 1-866 664 2724 REV 1, 01/12
TWO POINT HOIST - ASSEMBLY INSTRUCTIONS
STEP 5 STEP 5
SYSTEM SETUP
STEP #5: PLACE THE OBJECT TO BE HOISTED UNDER THE RING HOOKS AND TIE THE DROP CORDS TO THE
STRAPS. TRY TO TIE THE STRAPS ONTO THE DROP CORDS AT THE SAME HEIGHT.
STEP #6: FASTEN THE STRAPS TO THE OBJECT TO BE LIFTED AND ADJUST THE STRAP LENGTHS AS
NEEDED SO THE LOAD IS LEVEL.
STEP #7: SLOWLY PULL THE RAISING CORD TO CHECK THE LOAD IS LEVEL. (BOTH DROP ROPES MUST
HAVE EQUAL TENSION SO THE LOAD REMAINS LEVEL WHEN LOWERING OR RAISING.) THE METHOD USED
TO RAISE OR LOWER AND OBJECT IS SHOWN / EXPLAINED ON PAGE 2.
STEP 6 STEP 7
A FINAL SAFETY NOTE: NEVER RAISE OR LOWER AN ITEM WITH A PERSON UNDER
THE OBJECT.
PG 4 QUESTIONS ???? CALL 1-866 664 2724 REV 1, 01/1
TWO POINT HOIST - ASSEMBLY INSTRUCTIONS
STANDARD INSTALLATION WITH SUPPLIED PARTS
THESE INSTRUCTIONS INSTALL THE HOIST ON A 2X6 WOOD BOARD AND
THEN SCREWING THE BOARD TO THE CEILING.
PG 5 QUESTIONS ???? CALL 1-866 664 2724 REV 1, 01/1
TWO POINT HOIST - ASSEMBLY INSTRUCTIONS
PG 6 QUESTIONS ???? CALL 1-866 664 2724 REV 1, 01/1
TWO POINT HOIST - ASSEMBLY INSTRUCTIONS
PG 7 QUESTIONS ???? CALL 1-866 664 2724 REV 1, 01/1
TWO POINT HOIST - ASSEMBLY INSTRUCTIONS
PG 8 QUESTIONS ???? CALL 1-866 664 2724 REV 1, 01/1
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8

Garage Tek GT4011EE Installation Instructions Manual

Type
Installation Instructions Manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI