1
1. Before beginning construction, check local building codes regarding footings, location and other
requirements. Study and understand this owner’s manual.
2. Follow all directions and dimensions carefully.
3. Follow the step sequence carefully for correct results.
4. Be sure all the parts fit together properly before proceeding.
5. SAFETY FIRST: Care must be taken when handling various pieces of your kit since some contain sharp
edges. Wear work gloves, eye protection and long sleeves when assembling or performing any
maintenance on your building.
6. GROUND MUST BE LEVEL: Be sure Floor Frames lie flat on ground. To prepare earth bed, remove sod and
other debris. Level the high spots with flat shovel and tamp the bed down. Refer to Page 24 for Parts List.
Site Preparation
Before You Begin
Foundation Recommendations
Local building codes vary by region, refer to your local codes for specifications.
Concrete Slab
1. Select level site for building.
2. Remove 6” of soil for slab.
3. Compact 4” gravel in hole.
4. Place 6 ml plastic over gravel.
5. Construct 2 x 4 form.
6. Pour concrete and level.
Wood Platform
1. Construct with 2 x 4 treated lumber and 5/8” minimum exterior grade
plywood using galvanized nails.
2. Level platform.
68
1/2
” (174cm)
56
1/2
” (143,5cm)
Slab Dimensions
Door Opening
16” Centers
68
1/2
” (174cm)
56
1/2
” (143,5cm)
Door Opening
CAUTION
Sharp
Edges
BASIC TOOLS
No. 2 Phillips
Screwdriver
Pliers
Work
Gloves
Tape
Measure
Level
Shovel
Rubber
Mallet