ASSEMBLY AND SETUP
Use the following procedures to unpack and assemble your STAR TRAC S SERIES TREADMILL. Assembly procedures
are the same for all S SERIES TREADMILLS.
UNPACKING
Open the shipping carton, remove all parts from the carton and foam inserts, and verify that the following parts are included
in your shipment:
Main Subassemblies Description Qty
1. Base Assembly 1
2. Display Console Assembly 1
3. Neck (and Grommet) 1
4. Handrail (and Grommet) 2
5. Power Cord 1
6. Manual and Warranty Card 1
n/a Hardware Kit 1
Hardware Kit Description Qty
Screw 5/16"-18 x 1 3/4" 4
Washer, Lock, 5/16" 16
Washer, Flat, 5/16" I.D. x 1/2" O.D. 16
Screw 1/4"-28 x 3/8", Button Head 4
Screw 5/16"-18 x 1", Socket Head 12
Screw #10-16 x 1/2" Tapping Pan Head 6
Screw M4 x 0.7 x 19mm, Pan Head 14
TOOLS REQUIRED
Most STAR TRAC treadmills can be assembled using the following tools:
• 1/4” Hex Key (included)
• 5/32” Hex Key (included)
• #2 Phillips Head Screwdriver (included)
• Torque Wrench (not included)
ASSEMBLY
1. Unpack and Position the Base Assembly
CAUTION: The motor end of the base assembly is very heavy. It is recommended that two people lift this end when
moving the base assembly.
Remove all packaging material so the base assembly is sitting on the shipping crate platform. With a helper, lift the
base assembly from the shipping crate platform, and place it in the location where it will be used. Be sure the
selected location is level, and close to a power outlet. Remove the motor shroud for installation of the handrails.