Installation & Servicing Instructions Rinnai E-Series
3
Content
7 External domestic hot water tanks .................................................42
8 Electrical connections ....................................................................43
9 Boiler controls .........................................................................47
9.1 Explanation of the function buttons ...................................48
10 Starting up: Filling and de-aerating the boiler and installation .......49
10.1 Requirements of the water system ....................................49
10.2 Filling the heating system ..................................................50
11 Adjustments .........................................................................53
11.1 Altering adjustments ..........................................................53
11.2 Activating factory settings (green button function) ...........56
12 Isolating the boiler .........................................................................56
13 Commissioning .........................................................................57
13.1 Testing for gas leaks ..........................................................58
13.2 TestingtheIgnitionSafetyshutodevice .........................58
13.3 Checking the O
2
on full load (Step 1/3) ..............................59
13.3.1 Checking the O
2
on low load (Step 2/3) ............................ 59
13.3.2 Settings on the gas valve (Step 3/3) .................................59
13.4 Measuring the ionization current .......................................60
13.5 Installing the casing ...........................................................60
14 Maintenance .........................................................................61
14.1 Periodic examination of venting systems and boiler .........61
14.2 Inspection .........................................................................61
14.2.1 Visual inspection for general signs of corrosion ................62
14.2.2 Measuring the ionization current .......................................62
14.2.3 Measuring the inlet gas pressure ......................................62
14.2.4 Testing for gas leaks ..........................................................62
14.2.5 Carrying out a pressure test of the heating system ...........62
14.2.6 Checking venting systems .................................................62
14.3 Maintenance activities .......................................................63
14.3.1 Reset service interval counter ...........................................64
14.4 Limited warranty ................................................................65
15 Parts of the boiler .........................................................................66
16 Blocks and Errors .........................................................................67
16.1 Error indication (short reference) .......................................67
16.2 Blocks .........................................................................68
16.3 Errors .........................................................................69
16.4 Other Errors .......................................................................73
17 Spare parts .........................................................................75
18 Parts list vent system .....................................................................83
Appendix A - Outoor Reset Sensor Data and
Resistance table NTC sensors .......................................86
Appendix B - Optional Accessories
Low Loss Header ...........................................................87
Appendix C - Approved system cleaners, inhibitors and antifreeze .....90
French version .........................................................................95
1 Safety and general instructions ........................................................4
1.1 Designated use ...................................................................4
1.2 Hazarddenitions ................................................................4
1.3 Symboldenitions ...............................................................4
1.4 The following instructions must be followed ........................5
1.5 Follow these instructions for the space heating water .........6
1.6 Tools, materials and additional equipment ..........................6
1.7 Relevant Installation, Service and User manuals ................7
1.8 Disposal ...........................................................................7
2 Regulations and guidelines ..............................................................7
3 Description of the boiler ...................................................................8
4 Packaging and transportation ..........................................................9
4.1 Scope of delivery .................................................................9
4.2 Transportation .....................................................................9
5 Installation .........................................................................10
5.1 Requirements for the installation room .............................10
5.2 Fitting the boiler .................................................................11
5.3 Dimensions ........................................................................12
5.3.1 Clearances from boiler ......................................................13
5.4 Technicalspecications .....................................................14
6 Connecting the boiler .....................................................................15
6.1 Central heating system ......................................................15
6.1.1 Safety valve .......................................................................20
6.1.2 Lowwatercuto ...............................................................20
6.2 Boiler expansion tank ........................................................20
6.3 Underoorheatingsystem(plasticpipes) ...........................20
6.4 Gas supply connection ......................................................20
6.4.1 Gas connection with natural gas .......................................21
6.4.2 Gas connection with propane gas .....................................22
6.5 Condensate drain pipe ......................................................23
6.6 Vent system and air supply system ...................................24
6.6.1 Intake / Exhaust Guidelines ...............................................24
6.6.2a Examples vent and air supply systems (parallel) ..............26
6.6.2b Examplesventandairsupplysystems(lowprolePP) ....27
6.6.2c Examples vent and air supply systems (PP Twin pipe
and Flex) .........................................................................28
6.6.2d Boiler Exhaust Vent Hanger and Support (Rigid Pipes) ....29
6.6.3 Installation of the vent system ...........................................31
6.6.3.1 Conversion from parallel to concentric vent system ..........32
6.6.3.2 Installingairlter...............................................................32
6.6.4 Vent/air intake terminal position ........................................33
6.6.5 Direct vent closet and alcove installation ........................35
6.6.6 Dimensioning of the exhaust and air intake duct .............36
6.6.7 Combustion air and vent piping lengths. ...........................37
6.6.8 Calculation of compensation factor ...................................38
6.6.9 Room Air System (indoor combustion air) .........................39