PoolPak PCP Series Start-Up Procedures

Category
Dehumidifiers
Type
Start-Up Procedures
PCP Series
Start-Up Procedures
DOCUMENT: SVW11-SUPROCS-20181009
UPDATED: OCTOBER 2018
PCP Series Start-Up Procedures
© 2018 PoolPak LLC. All rights reserved. www.poolpak.com | 717-757-2648 | 2
TABLE OF CONTENTS
Start-Up & Warranty Registration Package ................................................................................. 3
Start-Up .....................................................................................................................................................3
Start-Up Assistance ......................................................................................................................................3
Prior to Performing a Start-Up: ......................................................................................................................3
Contact Information: ....................................................................................................................................3
Start-up Procedure ...................................................................................................................... 4
General Inspection ...................................................................................................................... 5
Make Sure Following is in Place Before a Start Up ..........................................................................................5
Perform Dehumidifier Inspection – Verify/Perform Following .............................................................................5
Perform Premise and Mechanical Room Inspection - Verify/Perform Following ....................................................6
Power Up the Dehumidifier ...........................................................................................................................7
Start-up Procedure & Touch Display Basic Navigation ................................................................. 8
Intro ...........................................................................................................................................................8
Dehumidifier Operational Modes ..................................................................................................................8
Touch Display Home Page Layout ................................................................................................................. 8
Home Page Features ..................................................................................................................................10
Service Menu Group Layout and Navigating. ...............................................................................................10
Start-Up Procedure ................................................................................................................... 12
Service Mode Operation - Ventilation ........................................................................................ 12
Start-Up Procedure ................................................................................................................... 14
Service Mode Operation – Space Heating .................................................................................. 14
Compressor(s) ........................................................................................................................... 15
Before Running Compressor(s) .....................................................................................................................15
Verify Compressor(s) Operation ..................................................................................................................16
For Two-compressor Dehumidifiers ..............................................................................................................18
Commissioning and Normal Mode Operation ............................................................................ 19
Finish Start-Up and Review Settings .............................................................................................................19
Commission the Dehumidifier and Switch to Normal Mode Operation. ............................................................19
If Dehumidifier has to be Stopped or Restarted .............................................................................................20
© 2018 PoolPak LLC. All rights reserved. www.poolpak.com | 717-757-2648 | 3
PCP Series Start-Up & Warranty
START-UP & WARRANTY REGISTRATION PACKAGE
The Start-Up Package contains the following documentation:
• Pre-Start-Up Check List – to be completed and sent to manufacturer two weeks prior to the Factory Assisted
start-up date.
• Start-Up Procedure
• Start-Up Report – to be completely filled out and returned to manufacturer to validate the equipment warranty.
The Operation and Maintenance Manual with Warranty Statement is provided with the equipment and
is a vital document for a start-up. Read the Warranty Statement carefully before conducting any work on the
equipment. If the manual is missing, please contact Service&Customer Support Team for assistance (see Contact
Information below).
Start-Up
! Only qualified and trained HVAC/R technicians should perform a dehumidifier start-up!
Attempts to perform a Start-Up by non-qualified personnel could lead to dehumidifier malfunction, damage or
personal injury. Manufacturer reserves the right to limit or refuse to provide technical assistance
if personnel attempting a start-up are deemed as not-qualified by the Service & Customer
Support Team member.
Start-Up Assistance
Factory Assisted Start-Up option (please verify with your supplier if this option has been purchased). If this option is
purchased, a manufacturer representative will be present on site to provide assistance and supervision to a qualified
technician. Contact Service & Customer Support Team for more information (see Contact Information below).
To request a Factory Assisted Start-Up, complete this Pre-Start-Up Check List and forward to the Service
& Customer Support Team at least two weeks prior to the start-up date – see Contact Information below.
Every effort will be made to accommodate the requested date(s), however the requested start-up date will depend
on the Service & Customer Support Team personnel availability and will be at their discretion.
Prior to Performing a Start-Up:
Familiarize yourself with ALL documents included in the Start-Up Package, and the equipment manual(s)
before attempting a start-up.
The equipment contains refrigerant under pressure, moving mechanical components and high voltage powered
components. Exercise caution while performing start-up or other work!
Upon start-up completion, the Start-Up Report must be filled out and submitted to the manufacturer within the
terms set in the Warranty Statement to validate the equipment’s warranty.
Contact Information:
To submit a Start-Up report or for general assistance or inquiries - please contact Service & Customer Support Team:
Phone: 1.833.DAS.POOL (1-833-327-7665)
E-mail:
StartUp Requests: [email protected]
Miscellaneous Inquiries: [email protected]
Parts Requests: [email protected]
For additional information, please visit www.dehumidifiedairsolutions.com
START-UP PROCEDURE
General Inspection
Basic Touch Display Navigation
Service Mode Operation – Ventilation
Service Mode Operation – Space Heating
Service Mode Operation – Compressor(s) and Pool Heating
Commissioning
Contact Information:
To submit a Start-Up report or for general assistance or inquiries, please contact
Service & Customer Support Team:
Phone: 1.833.DAS.POOL (1-833-327-7665)
E-mail:
StartUp Requests: [email protected]
Miscellaneous Inquiries: [email protected]
Parts Requests: [email protected]
For additional information, please visit www.dehumidifiedairsolutions.com
PCP Series Start-Up Procedures
© 2018 PoolPak LLC. All rights reserved. www.poolpak.com | 717-757-2648 | 4
PCP Series Start-Up Procedures - GENERAL INSPECTION
© 2018 PoolPak LLC. All rights reserved. www.poolpak.com | 717-757-2648 | 5
START-UP PROCEDURE
GENERAL INSPECTION
1. Make sure following is in place before a Start Up:
• Pre-Start-Up Check List is completed – dehumidifier and premise are ready for a Start-Up
Design conditions (where and what is applicable) are met. Room and pool water temperatures are brought
to design conditions to establish appropriate load; starting up dehumidifier with significantly lower load most
often would not reveal dehumidifier true performance.
Following documents are available (familiarize yourself with following documents, including current Start-Up
Procedure, prior to Start-Up):
Start-Up Report form – shipped from factory with the dehumidifier.
Operation and Maintenance Manual and Touch Display Manual – shipped from factory with
the dehumidifier. Refer to these documents as needed for dehumidifier description, operation, operator
panel navigation etc.
Contact factory to obtain copies of above mentioned documents if needed.
Completed Start-Up Report must be submitted to manufacturer within terms set in Warranty
(see Operation and Maintenance Manual) – otherwise dehumidifier warranty is void!
Take pictures of dehumidifier installation, premise etc. and submit along with Start-Up Report.
Record ALL applicable data in Start-Up Report, note and correct/address all discrepancy prior to starting up the dehumidifier.
! WARNING
2. Perform Dehumidifier Inspection – verify/perform following (where applicable):
Dehumidifier is leveled and firmly affixed.
External systems/components properly connected/installed and tested prior to Start-Up:
Ductwork
Power
Communication lines (internet, BMS, ROP etc.)
Control wires to external components (outdoor condenser/dry cooler, external pumps, fans, dampers,
sensors etc) – verify wiring is per wiring diagram
Outdoor condenser/dry cooler – verify proper installation, piping, charge
! CAUTION
OAC line set MUST comply with length limits and pipe sizes shown on dehumidifier Main Label – verify/address if incorrect.
! WARNING
Any external piping connected to the dehumidifier (heating/cooling liquids, pool water, gas etc.) –
verify correct direction and sizing
PCP Series Start-Up Procedures - GENERAL INSPECTION
© 2018 PoolPak LLC. All rights reserved. www.poolpak.com | 717-757-2648 | 6
Dehumidifiers with NO internally installed space heater (no space heating option included or space heater is installed
externally to the dehumidifier) would require Supply Air (SA) temperature sensor to be installed in the ductwork
downstream of space heater. SA sensor is pre-wired to the control board at the factory; sensor is provided with the
dehumidifier (close to Supply Air duct connection) in the bag with respective label.
NOTE
Some dehumidifier could be equipped with compressor isolating valves and
other manual valves that need to be open prior to dehumidifier start up!
Locate and tighten ALL hose clamps – on ALL pool water, glycol hose connections etc.
! CAUTION
! CAUTION
Drain – verify P-trap is installed correctly and primed
Other systems/devices
For dehumidifiers with water or glycol circuits (heat recovery, space heating, protocol glycol loop etc) –
verify that there is no air in the system (check automatic air vents, manual air bleeding valves etc).
Outdoor condenser/dry cooler is charged according to the dehumidifier label (refrigerant/glycol type
and amount, if applicable).
For dehumidifiers with external dry cooler: verify that static pressure at the compressor pump
is min 25-30 psi after dry cooler is charged (verify that air is bled out of the system – see above).
External pumps performance (pool water, heating/cooling water, GPM etc) is per spec.
Access to ALL dehumidifier components, doors, louvers, filter racks, access ports and covers is not restricted.
CAUTION ! Locate and tighten ALL electrical apparatuses’ wiring terminals:
Contactors and relays
Distribution blocks
Board and additional terminals
Fuses
Other wiring connections
Perform dehumidifier internal and external inspection for any shipping damages, loose articles, fasteners,
wires etc – tighten/address as needed.
3. Perform Premise and Mechanical Room Inspection - verify/perform following (where applicable):
! No chemicals stored in same mechanical room where dehumidifier is installed.
Having chemicals stored in same mechanical room will void warranty!
Floor drain is present in mechanical room
External disconnect for dehumidifier is easily accessible and clearly labeled; same is done for outdoor
condenser/dry cooler.
PCP Series Start-Up Procedures - GENERAL INSPECTION
© 2018 PoolPak LLC. All rights reserved. www.poolpak.com | 717-757-2648 | 7
Before powering up a dehumidifier, verify proper voltage power supply is connected. Check at main disconnect.
Once powered up a dehumidifier, check for proper power supply (phasing, voltage etc) at main
distribution block and at transformers’ secondary lines (24 VAC for main control one, others, if any –
as per transformer label).
Check compressor(s) crankcase heater operation. Insure crankcase heater(s) powered.
Check Voltage Monitor status – address respectively, if any, alarms shown:
If Voltage monitor (VM) indicates phase reversal on three-phase power supply – power dehumidifier
down and reverse/switch any two power leads. All motors, compressors, pumps within the dehumidifier
are synchronized with Voltage Monitor – proper phasing to Voltage Monitor from main power will insure
proper rotation.
Check Operator Panels for response (both, local and remote, ROP, if applicable) – you should see home page
on the display (refer to Touch Display manual, if needed):
Verify that Comm status indicator (on the right side of touch display home page) is green (meaning that
communication between Touch Display and control board is OK); investigate otherwise.
! Important Notes!
Air balancing and fans speed adjustment.
As many other settings, Main Blower and Exhaust fans (if any) speed is set at the factory to certain, default
level. These settings normally have to be checked and adjusted (as needed – increased or reduced) during
Start Up and Air Balancing to ensure dehumidifier proper operation and correct airflow.
Above statement applies to majority of dehumidifiers - with very few exceptions, dehumidifiers are
equipped with fans with ability to modulate/adjust their speed – fan motor could be equipped with VFD
(variable frequency drive) or fan itself could be of EC type.
It is recommended to have Air Balancing completed prior to or, at least, at the beginning of a Start Up,
to ensure proper adjustments of refrigeration, space heating and other components (like TX valve etc) and
systems that are influenced by airflow.
Dehumidifier must be powered up at least 24 hours prior to a Start-Up for crankcase heaters to warm up compressor(s)!
Make sure it is safe to turn power on – exercise caution!
! WARNING
Ductwork is installed in such a manner that:
No short-cycling occurred (no closely located supply and return grills)
No stagnant air zones
Air is supplied onto outer windows, doors (to prevent sweating)
4. Power Up the Dehumidifier
PCP Series Start-Up Procedures - TOUCH DISPLAY BASIC NAVIGATION
© 2018 PoolPak LLC. All rights reserved. www.poolpak.com | 717-757-2648 | 8
START-UP PROCEDURE &
TOUCH DISPLAY BASIC NAVIGATION
Before attempting to operate the dehumidifier, familiarize yourself with Touch Display Layout and Navigation.
Refer to Touch Display Manual and current document.
! WARNING
Intro
Touch Display operator panel could be used
as local or remote operator panel.
Touch Display provides standard operator
panel’s functions (viewing sensors readings,
adjusting settings or operating dehumidifier
etc.), as well as some additional ones, like
extended Help feature, Notes feature, data
logging etc.; menus and settings structure is
very similar to web monitoring online system.
Best way to get accustomed with Touch
Display is to practice – read current document
and surf Touch Display menus, use Help
feature etc.
For more, in depth details on Touch Display layout and features, refer to Touch Display Manual.
Dehumidifier Operational Modes
The dehumidifier could operate in two distinctive control modes:
• Normal Mode (standard automatic operational mode) – dehumidifier operation is automatic and fully
controlled by software algorithm, all safeties are enabled, no person supervision is required.
Service Mode – dehumidifier components could be engaged only manually (from Touch Display Operator
Panel), certain safeties, active during Normal Mode, are omitted during Service Mode.
By default, all dehumidifiers delivered from factory, are set to be in Service Mode (to avoid uncontrolled start of
any component without prior check or proper start-up by qualified person). Therefore, once powered, dehumidifier
should assume Service mode and Touch Display should show Service mode home page. It has distinctive
SERVICE MODE” note displayed – see below
Touch Display home page layout
When dehumidifier is powered up, restarted or rebooted, touch display would by default show home page. Home
page layout is shown on the pictures below (Normal Mode – top, Service Mode – bottom).
PCP Series Start-Up Procedures - TOUCH DISPLAY BASIC NAVIGATION
© 2018 PoolPak LLC. All rights reserved. www.poolpak.com | 717-757-2648 | 9
MAIN MENU
Available
in Service
and Normal
modes;
Access to
Help feature,
logs, User and
Advanced
(factory)
settings from
any sub-level
SERVICE
MODE
WARNING
(Service Mode
home page
indicator)
STATUS
INDICATORS
Available in
Service and
Normal mode
as applicable
(dehumidifier
automatic
operation
indicators.
Blower, Dehum,
etc. are not
available in
Service mode).
Indicates
operation and
communica-tion
status
NOTES
Available in
Service and
Normal modes;
allows to create
new and review
existing notes.
READOUTS
Available in Normal mode only
Display current sensors’ readings
(per dehumidifier configuration)
SERVICE MENU
Available in Service mode only
Allows to operate systems and devices manually and view
sensors’ current readings (per dehumidifier configuration)
CURRENT DATE & TIME
CURRENT
DATE & TIME
PCP Series Start-Up Procedures - TOUCH DISPLAY BASIC NAVIGATION
© 2018 PoolPak LLC. All rights reserved. www.poolpak.com | 717-757-2648 | 10
Home Page Features
• Main Menu is available in both, Service and Normal modes, and provides access from any sub-level to
following features:
Home – returns to the home page from any sub-page
Logs – accesses systems logs and log-related features (Alarm Log, Current Alarms etc.)
User – accesses User’s settings (Set points etc.), allows System Reset and Restart
Advanced – accesses advanced/factory control configurations (that determine dehumidifier operation) as
well as detailed system control and operational statuses and sensors’ readings.
Service feature (part of Advanced), available in Service mode only – allows to Commission or
de-Commission the dehumidifier.
Help – Context sensitive help presenting information related to the viewed page.
Additional Help features are available also per-Alarm and per-Setting.
Status Indicators provide basic status of dehumidifier operation and communication:
Comm – control board to Touch Display communication (green – OK)
Web Monitor – web monitoring/accessibility online tool communication (green – OK)
Alarms – active Alarms or Alerts presence (red – Alarm, yellow – Alert)
Blower – Main Blower operational status (green – Blower is ON).
Available only in Normal mode
Dehum, A/C, Space Heat, Pool Heat – operational mode status (green – demand is present)
Available only in Normal mode and only if dehumidifier is configured respectively (e.g. Pool Heat
indicator would not appear on the page, if dehumidifier is configured to not have pool heating).
Readouts display main control sensors readings – air temperature and humidity (other readings, like pool
water, may be displayed – depending on the dehumidifier type and configuration).
This feature is displayed on home page in Normal Mode only: in Service Mode, in its place,
Service Mode Warning is displayed.
Service Menu (located on the bottom of the display, available in Service Mode only) allows to manually
operate various dehumidifier devices (split in groups) and view various sensors pertinent to respective group.
All home page features are described in more details in Touch Display Manual – refer as needed.
Service menu group layout and navigating.
Vent group includes all Ventilation related controls and respective sensors’ readings (air characteristics).
Heat group includes Space Heating and Pool Heating related controls and sensor readings (air temperatures,
pool water temperatures)
These two groups are always present in Service menu for all dehumidifier’s types and configurations
Compr1 (Compr2) group(s) include Compressor related controls and sensor readings (pressures,
superheat etc.). either of these groups would appear only if respective compressor is enabled.
Compressor group(s) would appear only if dehumidifier is equipped with compressor(s)
What sensors’ readings and what device control buttons would be available, depends on the dehumidifier
configuration – e.g. modulating control for space heating would not appear among Analog Outputs,
if dehumidifier Space heating would be configured to 1 Stage or Two staged (not modulating).
PCP Series Start-Up Procedures - TOUCH DISPLAY BASIC NAVIGATION
© 2018 PoolPak LLC. All rights reserved. www.poolpak.com | 717-757-2648 | 11
On/Off control (top group) and Modular control (bottom group) are separated by wider gap; number
of buttons in each group may vary depending on the dehumidifier specific configuration.
Tap/press on desired button to engage respective signal (send on/off signal – top group, access
modulating signal adjustment – bottom grout): green color indicates that respective signal is engaged
(as shown – RA damper actuator is engaged as well as Exhaust fan 2 contactor).
Picture below shows modulating signal for main blower is accessed (button Blower in bottom group is pressed),
so its speed could be adjusted:
Press “+” to increase
or “-“ to reduce
signal value (it will
be displayed in the
middle - zero on the
picture).
Signal change
is applied
immediately
• Press Close, once
desired signal value
is set
• Press Reset to set
signal to zero.
ON/OFF CONTROL
(DIGITAL OUTPUTS)
Engages On/Off devices
(contactors, solenoids,
Start/Stop signals etc.)
MODULATING
CONTROL
(ANALOG OUTPUTS)
Sets/adjusts modulating
(0-10VDC) control signals
(fan speeds, modulating
actuators etc.)
SENSORS READOUTS
Displays available (configured as such) sensors, pertinent to current group.
PCP Series Start-Up Procedures - VENTILATION
© 2018 PoolPak LLC. All rights reserved. www.poolpak.com | 717-757-2648 | 12
START-UP PROCEDURE -
SERVICE MODE OPERATION - VENTILATION
Verify dehumidifier Ventilation system operation (main blower(s), dampers, fans etc.):
Press Vent (bottom menu)
1. Run Main blower(s):
Send blower start signal:
Press Blower (top button group, DO signals) – observe button turns green.
Observe Blower button in bottom group (AO signals) turns green also (blower speed by default is
pre-set at factory to certain value, which would allow blower to run).
Verify main blower(s) contactor(s)/relay(s) engage and blower(s) start.
Verify/adjust blower speed signal:
Press Blower (bottom button group) and adjust main blower speed:
By pressing+, increase speed to 100% - observe blower respective response.
By pressing-” and reduce speed as desired - observe blower respective response.
Press Close.
Check amp draw at various speeds and make respective records in Start-Up Report
2. Run OA damper(s):
Not all dehumidifiers would be equipped with all systems/components mentioned below. Use following procedure as
applicable to each specific dehumidifier.
To locate respective components/systems (main blower(s), exhaust and purge fans, dampers etc.) refer to dehumidifier
doors labels.
For proper operation verification make sure that Main Blower is running, and OA damper is open while checking, as
applicable, Ventilation, Space Heating and Compressor(s).
Some dehumidifiers could be equipped with main blower VFD – refer to Operation and Maintenance Manual and any
accompanying manuals for VFDs if/when needed.
NOTE
Dehumidifier control supports two types of control devices for OA damper – On/Off and modulating control.
Depending on dehumidifier type and specifics, dehumidifiers could be equipped with both,
none or either of these two control type devices. Verify operation as applicable.
NOTE
Engage OA1 damper(s) actuator(s) per their type and verify respective operation:
On/Off actuator(s):
press OA Damper (top group), observe button turns green; verify OA1 damper opens;
press OA Damper (top group) again – verify OA1 damper closes.
Modulating actuator(s):
Press OA Damper1 (bottom group);
By pressing+, set modulating signal to 100%, verify OA1 damper is open fully/to a max.
By pressing-, reduce modulating signal as desired, verify OA1 damper response.
Press Close.
PCP Series Start-Up Procedures - VENTILATION
© 2018 PoolPak LLC. All rights reserved. www.poolpak.com | 717-757-2648 | 13
3. Run Exhaust Fan(s)1 (EF1).
Send exhaust fan(s) start signal:
Press Exhaust1 (top button group) – observe button turns green.
If applicable – verify exhaust damper actuator(s) open.
Verify exhaust fan(s) contactor(s)/relay(s) engage.
Set/adjust exhaust fan(s) speed signal:
Press Exhaust1 (bottom button group) and adjust fan speed:
By pressing+, increase speed to 100% - observe exhaust fan(s) start and ramp up.
By pressing-” and reduce speed as desired - observe exhaust fan(s) respective response.
Press Close.
Check amp draw at various speeds and make respective records in Start-Up Report
4. Run Exhaust Fan(s)2 (EF2).
Perform same procedure, outlined in step 3 (Exhaust Fan 1) – use Exhaust2 buttons respectively.
NOTE: by pressing Exhaust2 (top button group), along with EF2 contactor(s)/relay(s) OA2 damper(s)
actuator(s) would be engaged also.
5. Run OA2 damper(s). Similar to OA1 – verify type of OA2 damper(s) actuator(s), engage according to their type
and verify their respective operation:
For On/Off actuator(s) – OA2 damper(s) would engage along with EF2 (step 4) contactor(s)/relay(s) (by
pressing Exhaust2 (top button group)).
For modulating actuator(s):
Press OA Damper2 (bottom button group);
By pressing+, set. modulating signal to 100%, verify OA2 damper is open fully/to a max.
By pressing-, reduce modulating signal as desired, verify OA2 damper response.
Press Close.
6. Run Heat Recovery Pump:
Press Heat Rec (top button group) – observe button turns green.
Verify pump contactor engages and pump starts.
Check amp draw, pressures on the pump’s inlet and outlet and make respective records in Start-Up Report
7. Run Return Air damper (RA):
Press RA Damper (top button group) – observe button turns green; verify damper actuator is energizing and
damper closes.
Press RA Damper (top button group) again to open damper; verify damper respective operation.
NOTE: some dehumidifiers could be equipped with modulating RA damper actuators; should this be a
case, these actuators would be controlled from the same signal as OA2 actuators.
Once operation of all applicable Ventilation components is checked, stop/dis-energize respective component(s),
set speeds/modulating signals to zero etc. Refer to steps above.
NOTE
PCP Series Start-Up Procedures - SPACE HEATING
© 2018 PoolPak LLC. All rights reserved. www.poolpak.com | 717-757-2648 | 14
START-UP PROCEDURE
Service Mode Operation – Space Heating
Verify dehumidifier Space Heating system operation (HW coil, gas heater, electric heater etc.)
Verify type of Space Heating control:
On/Off (on/off two- or three- way valves, electric heaters etc.)
Two Staged (electric heaters)
Modulated (modulated two- or three- way valves, electric heaters, gas heaters etc.)
Press Heat (bottom menu) and select respectively to control type:
For staged control (On/Off or two stages):
Engage stage(s) by pressing Heat Stg 1 and/or 2-Heat Stg 2 respectively
(both buttons – top group) – observe respective button turns green; verify respective
component operation
Engage stages one at a time to verify proper operation.
For modulating control:
Press Mod Heat (bottom group), then adjust/set modulating signal as desired by pressing “+”
and/or “-“.
For proper operation verification make sure that Main Blower is running while checking Space Heating components.
Engage OA damper and Exhaust Fan1 as well (if/where applicable).
For dehumidifiers equipped with gas boiler(s) package – press Heat Stg 1
to engage heating pump(s), then set modulating signal as desired.
For dehumidifiers equipped with gas heating components (boilers or indirect heaters),
refer, as needed, to their manuals and other accompanying documents.
For dehumidifiers equipped with indirect gas heater(s) - press Heat Stg 1
to engage start/stop signal to the heater, then set modulating signal as desired.
NOTE
NOTE
NOTE
NOTE
Observe/verify operation, record ALL respective data (pump, electric heater amp draw, temperature
rise, pump pressure readings etc.) in Start-Up Report.
Dis-engage respective components.
PCP Series Start-Up Procedures - COMPRESSOR(S)
© 2018 PoolPak LLC. All rights reserved. www.poolpak.com | 717-757-2648 | 15
SERVICE MODE OPERATION
COMPRESSOR(S)
Before Running Compressor(s):
Read this entire section first before starting and running compressor(s)!
Ensure that present load is sufficient for dehumidifier operation – RH level is at least 45%, RA temperature
is at least 7F. Normally, running dehumidifier with load significantly lower would render Start-Up insufficient
(it would not reflect true dehumidifier operation)
Ensure that, at least, Main blower is running; if dehumidifier is equipped with min exhaust fan and/or
OA damper – engage them also to test compressor under conditions as close to actual as possible; make
respective note in Start-Up Report - what ventilation components are running/active during Compressor(s)
Start-Up operation. Refer if needed to Ventilation section.
Verify dehumidifier following compressor-related configurations:
Press Advanced (top menu), then press Compressor Options
Locate Compressor Design setting and verify it is set to Classic; adjust otherwise – select Compressor
Design and set respectively.
Locate OACC Type setting and verify it is set to 1 Stage (if dehumidifier OAC/fluid cooler fan is EC-type
– modulating control) or Low/High (if dehumidifier fluid cooler fan is two speed fan) – verify visually if
needed); adjust otherwise. Select OACC Type and set respectively.
Scroll through the compressor options by pressing “<” or “>” to locate setting as needed.
Verify evaporator coil by-pass damper operation:
Press Home (top menu) to access home page and Service (bottom) menu.
Press Compr1 (bottom/Service menu)
Press Bypass Open – verify damper proper operation (damper is opening).
Once damper opens approximately half-way, press Bypass Open again - verify that damper stops and
maintains its position. Press Bypass Open again to open damper fully.
Once damper fully opens, press Bypass Open again. Verify that damper stops and stays open.
Press Bypass Close – verify damper proper operation (damper is closing).
Once damper fully closes, press Bypass Close again. Verify damper stops and stays closed.
If load (return air temperature and RH) is rather low – leave damper in closed position for testing
purposes (to maximize airflow/load across the evaporator coil). If load is sufficient - set damper into
half-open position; refer to previous steps
Install pressure gauge set, appropriate for type of used refrigerant, and verify that gauge readings correspond
with operator panel readouts:
Observe High Pressure and Low Pressure readouts and compare to pressure gauge set readings.
Note that low pressure transducer’s pressure reading brackets are 0-200 psi – it will display 200 psi max,
even if actual pressure is higher.
While running compressor(s), monitor load (return air temperature and RH) and adjust dehumidifier operation to maintain load
close to design data, e.g. if running dehumidifier in full AC mode brings return air temperature too low, engage space heating
or switch to full Reheat/Partial mode to compensate. Make a note of it in Start-Up Report.
NOTE
PCP Series Start-Up Procedures - COMPRESSOR(S)
© 2018 PoolPak LLC. All rights reserved. www.poolpak.com | 717-757-2648 | 16
Verify Compressor(s) Operation:
1. Run Compressor in full Dehumidification/Reheat Mode:
Press Pump Down – verify button turns green and Pump Down solenoid valve energizes (check magnetic
pull on the solenoid coil stem)
Press Reheat – verify button turns green and Reheat solenoid valve energizes (check magnetic pull on the
solenoid coil stem)
Allow couple seconds for pressure to balance out, then press Contactor – verify button turns green,
compressor contactor engages and compressor starts.
Allow compressor to stabilize and run for 5 - 10 min, then:
Check and note compressor amp draw, record it in Start-Up Report
Check/adjust superheat - aim for 15 - 25°F of superheat, adjust, if needed. After each adjustment allow
for at least 5 - 10 min of stabilization ran, then re-check superheat.
Once superheat is adjusted and stable - record readings from touch display in Start-Up Report
(refer to Compr1 page for compressor-related readouts and Vent page for air-related readouts).
2. Run Pool Heating with Reheat (skip this step if not applicable):
While compressor is running, engage pool heating solenoid:
Press Heat (bottom menu),
Press Pool Heat – verify pool heating solenoid(s) energize (check magnetic pull on the solenoid coil stem)
If dehumidifier has two pools or staged pool heating configuration, repeat last step for second pool/
stage: press Pool 2 Heat – verify second pool/second stage pool heating solenoid(s) energize (check
magnetic pull on the solenoid coil stem)
Verify compressor pool heating operation – observe pool water temperature readings change respectively
(Pool 1 Water In and Pool 1 Water Out for single pool, Pool 2 Water In and Pool 2 Water Out
for second pool, if applicable)
Allow at least 3 - 5 min for stabilization and record respective data in Start-Up Report (refer to Heat page
for pool water temperatures, Compr1 page for compressor-related readouts and Vent page for air-related
readouts).
Ensure pool water temperature differential (Pool Water Out Minus Pool Water In) is satisfactory – aim for
5 - 15°F; adjust water flow if needed.
Press Heat (bottom menu) and dis-energize pool heating solenoid(s) by pressing Pool Heat (and, if
applicable - Pool 2 Heat) - check that there is no magnetic pull on the solenoid coil stem.
Observe/verify pool water temperatures are equalizing.
Make a judgement call on what mode (AC, Reheat etc.) to start with, based on outdoor and indoor conditions: e.g. if indoor
(RA) temperature is relatively high, you may want to start with full AC or Partial mode (and then do full Reheat) – with high
return air temperature, compressor(s) may not sustain their operation for long period of time in full Reheat mode.
NOTE
PCP Series Start-Up Procedures - COMPRESSOR(S)
© 2018 PoolPak LLC. All rights reserved. www.poolpak.com | 717-757-2648 | 17
3. Run Compressor in full AC Mode:
Verify outdoor condenser/fluid cooler operation (keep compressor running as it is while checking condenser/
cooler fan(s) operation):
Press Compr1 (bottom menu) and engage outdoor condenser/fluid cooler fans according to their type
– EC-type fans (modulating control) or two-speed type fans (refer to previously verified OACC Type
configuration setting):
For EC-type fans:
Press OACC – to issue start signal for condenser/cooler fans (as well as for fluid cooler pump, if
applicable – see below)
Press Head Press and adjust/set fan speed:
Press “+” to set fan speed to 100% (max) – verify fan engages and ramps up respectively; check
amp draw and make respective records in Start-Up Report.
Press “-” to set speed to 40-60% - verify fan slows down and run respectively.
For two-speed type fans:
Press OACC – verify fans engage in low speed; check fan rotation direction and amp draw;
Press OACC again (to dis-engage low speed), then press OACC2 - verify fan(s) switch from low to high
speed; check fan rotation and amp draw; make respective records in Start-Up Report
Press OACC2 again, then press OACC (to revert to low speed) verify respective operation.
For fluid coolers, equipped/packaged with (integral to fluid cooler) pump - pump should engage once
OACC (OACC or OACC2 – for two-speed fans arrangement) is pressed:
Verify pump engages; check rotation and amp draw. Make respective records (pump amp draw, static
and dynamic pressures) in Start-Up Report.
Engage compressor AC operation. While condenser/cooler fan(s) (and pump – if applicable) and compressor
are running:
Press A/C – verify button turns green and AC solenoid valve energizes (check magnetic pull on the solenoid
coil stem)
Press Reheat – verify button turns white and Reheat solenoid valve dis-energizes (check that there is no
magnetic pull on the solenoid coil stem)
Allow compressor to stabilize and run for 5 - 10 min.
Monitor compressor head pressure and adjust condenser/cooler fans speed as needed – aim at
350-480 psi. Note fans speed in Start-Up Report.
Check and note compressor amp draw, record it in Start-Up Report.
Verify that superheat is stable - record readings from touch display in Start-Up Report (refer to
Compr1 page for compressor-related readouts and Vent page for air-related readouts).
4. Run Pool Heating with AC – use sequence, described in step 2 (skip this step if not applicable).
PCP Series Start-Up Procedures - COMPRESSOR(S)
© 2018 PoolPak LLC. All rights reserved. www.poolpak.com | 717-757-2648 | 18
5. Run Compressor in partial mode – Reheat and AC:
While condenser/cooler fan(s) (and pump – if applicable) and compressor are running:
Press Reheat – verify button turns green and Reheat solenoid valve energizes
(check magnetic pull on the solenoid coil stem)
Allow compressor to stabilize and run for 5 - 10 min.
Monitor compressor head pressure and adjust condenser/cooler fans speed as needed –
aim at 350-480 psi. Note fans speed in Start-Up Report.
Check and note compressor amp draw, record it in Start-Up Report
Verify that superheat is stable - record readings from touch display in Start-Up Report
(refer to Compr1 page for compressor-related readouts and Vent page for air-related readouts).
6. Stop Compressor(s) once compressor(s) operation is confirmed:
Stop compressor by pumping it down:
Press Pump Down - verify Pump Down solenoid valve dis-energizes;
Observe compressor pumping down and dis-engaging.
Monitor compressor suction pressure during pump down – stop compressor manually (by pressing
Contactor) if suction pressure drops below 20 psi and compressor has not stopped yet.
Dis-energize all compressor related components (solenoid valves, condenser/cooler fan(s)/pump etc. – refer to
previous/respective steps, if needed).
For two-compressor dehumidifiers:
Same procedures/steps, described above, are applicable to all compressors: if dehumidifier is equipped with
(and configured respectively!) two compressors, use respective Service (bottom) menu buttons – Compr1 for
first compressor and Compr2 for second one.
If permissible, run compressors separately and together (simultaneously).
While running compressors together, if needed to offset separate compressor mode effect on air temperature,
run compressors in opposite modes: e.g. run one compressor in full A/C while running second compressor in
full reheat (and vice versa). This will constitute “partial mode” for two-compressor dehumidifier.
PCP Series Start-Up Procedures - COMMISSIONING
© 2018 PoolPak LLC. All rights reserved. www.poolpak.com | 717-757-2648 | 19
COMMISSIONING AND
NORMAL MODE OPERATION
Finish Start-Up and Review Settings
Once dehumidifier operation in different modes is verified and respective data is recorded, stop the dehumidifier:
Stop/dis-energize main blower and any other, if any, ventilation or space heating components – refer to
respective sections as needed.
Review and set/correct Setpoints and Date & Time:
Press User (top menu), then press Setpoints – review and adjust, as needed, applicable set points values;
once done - press Back. Make respective records in Start-Up Report
It is recommended to maintain room air temperature higher than pool water temperature at least by
couple degrees, at worst – to keep them equal: having pool water temperature maintained higher than
room air temperature will cause excessive evaporating rate.
Press Date & Time – verify date and time are correct, adjust if needed; once done – press Back.
Press System Information and record respective (MAC address etc.) info in Start-Up Report
Commission the dehumidifier and Switch to Normal Mode operation.
Once dehumidifier is ready to run automatically (all systems/components operation is verified):
Enable Compressor(s) (if/as applicable)
If not applicable or if compressor(s) to be left disabled – skip this step:
Press Advanced (top menu)
  Warning note may appear on the display – acknowledge/confirm if needed.
Press Compressors, then press Compressor Options, select Compressors Enabled, set it to Yes and then press
Enter to enable change.
Note, that this would enable all compressors; if, in two-compressor dehumidifier, one of the compressors should stay
disabled, it should be done via Compressor Configuration menu:
Press Back, then press Compressor Configuration;
Select, respectively, Compressor1 or Compressor2, set it to No and then press Enter to enable change.
Press Home (top menu) to return to home page
TO ENABLE COMPRESSOR(S):
PCP Series Start-Up Procedures - COMMISSIONING
• Commission the dehumidifier to allow it to run in Normal Mode.
IF DEHUMIDIFIER HAS TO BE STOPPED OR RESTARTED:
If needed to stop the dehumidifier (for service, adjustment or other purposes) or to switch its operation from
Service Mode to Normal Mode (or back) – Restart the dehumidifier:
Press Advanced (top menu)
  Warning note may appear on the display – acknowledge/confirm if needed.
Press Service, then press Commission
Select Commissioned, set it to Yes and then press Enter to enable change.
  Dehumidifier will perform automatic restart; once Normal/Service mode selection page is displayed –
select as desired.
Press User (top menu)
Press System Restart (right column), then press System Restart
  Message “Unit Shutting Down” will display.
  If Dehumidifier was Commissioned prior, it will automatically restart and display Normal/Service mode selection
page – select as desired.
  If Dehumidifier was Not Commissioned prior, it will automatically restart in Service Mode.
TO COMMISSION THE DEHUMIDIFIER:
TO RESTART THE DEHUMIDIFIER:
PoolPak is a Dehumidified Air Solutions company and member of Dehumidified Air Services, a coast-to-coast service network of
local customer support specialists. Backed by real-time remote monitoring and direct access to the engineers who designed and
built your dehumidifier, Dehumidified Air Services is the only organization in North America that has the scale and expertise to
deliver trouble-free pool dehumidification and unparalleled customer service.
3491 Industrial Drive
York, Pennsylvania 17402 USA
717-757-2648 | Fax 717-757-5085 | www.PoolPak.com
© 2018 PoolPak LLC. All rights reserved. SVW11-SUPROCS-20181009
ASHRAE
62.1 - 2013
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20

PoolPak PCP Series Start-Up Procedures

Category
Dehumidifiers
Type
Start-Up Procedures