Lifetime 90469 Owner's manual

  • Hello! I am an AI chatbot trained to assist you with the Lifetime 90469 Owner's manual. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
MODEL N° 90469
OWNER’S MANUAL
COPY
2
INSTRUCTION #1141504 E 7/22/2016
COPY
3
4
Electric Drill
Phillips Screwdriver
(1)
Funnel
(1)
Wood Block
(1)
Cement Mix
(9 Bags, 80 lb each)
(30”)
Rebar
Rubber Mallet
(1)
Water Hose
(1)
(1)
9/16” Wrench
(2)
Ladder
(3)
(1)
Tape Measure
(1)
Shovel
Level
(1)
3/4” Socket Wrench
(2)
7/16” Socket Wrench
(2)
1/2” Socket Wrench
(2)
9/16” Socket Wrench
(2)
5
6
PARTS LIST
HARDWARE LIST
ID Item Description Qty
ALH Top Pole 1
ALF Middle Pole 1
ALE Bottom Pole 1
BGO Upper Extension Arm 2
BGP Lower Extension Arm 2
ALS Rear Lifter Arm 2
AKF Gas Spring 1
AKG Gas Spring Cover 1
ALX Rim 1
AJI Backboard 1
CKH Handle Top 1
CKI Handle Bottom 1
CKJ Handle Frame 1
BAA Left Frame Pad 1
BAB Right Frame Pad 1
AJQ Center Frame Pad 2
BGR U-Bolt Washer Plate 1
ALD Plastic Guard 1
AKZ Net 1
AMA Rim Cover Plate 1
APY Rim Pivot Bracket 1
AOW Spring Retainer Plate 1
ALL Pole Bracket 1
BLC Tie Plate 1
CKM Pump Adjust Link 2
CKG Link Cap 2
ALM Pole Cap 1
CMR Pump Adjust Actuator 2
AQC Extension Arm Caps 2
AKP Height Sticker 1
AMT Warning Sticker (applied to Middle Pole) 1
BGW Alignment Frame (image not shown) 1
ID Item Description Qty
BCO Pole Assembly Hardware
ANF 3/8” x 5” Hex Bolt 2
ANE 1/2” x 3.91” Spacer 2
AAF 3/8” Washer 2
AAA 3/8” Nylock Nut 2
CMV #10 x .62” Self-Drilling Screw 2
7
HARDWARE LIST
ID Item Description Qty
BCS Backboard to Rim Assembly Hardware
EAP 5/16” x 1” Carriage Bolt 2
AAQ 3/8” Push Nut 2
ABK 5/16” Nylock Flange Nut 4
AAV 5/16” Jam Nut 2
ADR #7 x 3/8” Screw 4
AJW Compression Spring 2
APZ 4” U-Bolt 1
ABQ 3/8” x 5 1/2” Axle 1
BCR Backboard to Pole Assembly Hardware
AQB 5/16” x 3/4” Thread-Cutting Bolt 2
ANZ 1/2” x 1/5” Spacer 2
AAX 1/2” Centerlock Nut 4
ANK 1/2” Nylon Washer 4
ABP 1/2” x 3/8” Poly Spacer 2
AOR 1/2” Washer 6
ANP 1/2” x 3/4” Coupler 1
AQD 1/2” x 5” Hex Bolt 1
ANQ 1/2” x 3” Bolt with Nylon Patch 2
ANU 1/2” x 1 3/4” Hex Bolt 2
AAD 1/2” x 7 1/16” Hex Bolt 1
ABN 1/2” x 1/8” Plastic Washer 4
ANS 1/2” Nylon Plug 4
BCT Handle Assembly Hardware
AAD 1/2” x 7 1/16” Hex Bolt 1
AOR 1/2” Washer 2
AAX 1/2” Centerlock Nut 3
ADT #6 x 5/8” Screw 7
ABB 3/8” Centerlock Nut 1
CHQ 3/8” x 1” Hex Bolt 1
CKV 3/8” Clear Plastic Washer 2
CKU 1/2” x .69” Black Poly Spacer 2
ACX 5/16” x 2 1/2” Hex Bolt 1
CKW 3/8” x 6” Hex Bolt 1
CKX .63” x 2 1/2” Spacer 2
AAW 1/2” x 6 1/2” Hex Bolt 2
CKY 1/2” x 1.15” Black Poly Spacer 2
CKZ Gas Shock Rod 1
ANZ 1/2” x 1/5” Spacer 3
AAO 5/16” Nylock Nut 1
AEB 1/4” Washer 2
BFI 3/8” Nylock Jam Nut 1
ABN 1/2” x 1/8” Plastic Washer 4
8
Parts shown at 10% of Actual Size
PARTS IDENTIFIER
BGP (x2)
Lower Extension Arm
BGO (x2)
Upper Extension Arm
ALS (x2)
Rear Lifter Arm
31”
ALH (x1)
Top Pole
ALF (x1)
Middle Pole
ALE (x1)
Bottom Pole
CKJ (x1)
Handle Frame
CKH (x1)
Handle Top
CKI (x1)
Handle Bottom
HARDWARE LIST
ID Item Description Qty
BCT Handle Assembly Hardware, Continued
ANK 1/2” Nylon Washer 2
AAB 1/4” Centerlock Nut 2
CKT .69” x 3-1/2” Poly Spacer 1
AKH Grease Packet 1
BCU Frame Pad Assembly Hardware
ADP #10 x 7/8” Self-Drilling Flat Screw 10
9
AKZ (x1)
Net
ALX (x1)
Rim
AJI (x1)
Backboard
Part shown at 5% of Actual Size
Parts shown at 10% of Actual Size
PARTS IDENTIFIER
AKF (x1)
Gas Spring
AKG (x1)
Gas Spring Cover
BAB (x1)
Right Frame Pad
BAA (x1)
Left Frame Pad
AJQ (x2)
Center Frame Pad
10
Parts shown at 25% of Actual Size
PARTS IDENTIFIER
ALM (x1)
Pole Cap
ALL (x1)
Pole Bracket
BLC (x1)
Tie Plate
AKP (x1)
Height Sticker
CMR (x2)
Pump Adjust Actuator
CKG (x2)
Link Cap
AQC (x2)
Extension Arm Cap
ALD (x1)
Plastic Guard
AMA (x1)
Rim Cover Plate
BGR (x1)
U-Bolt Washer Plate
CKM (x2)
Pump Adjust Link
Parts shown at Actual Size
AOW (x1)
Spring Retainer Plate
APY (x1)
Rim Pivot Bracket
11
HARDWARE IDENTIFIER
POLE ASSEMBLY HARDWARE [BCO]
Hardware shown at Actual Size
BACKBOARD TO RIM ASSEMBLY HARDWARE [BCS]
Hardware shown at Actual Size
CMV (x2)*
#10 x .62” Self-Drilling
Screw
AAA (x2)
3/8” Nylock Nut
AAF (x2)
3/8” Washer
ANF (x2)
3/8” x 5” Hex Bolt
ANE (x2)
1/2” x 3.91” Spacer
*Note: Only one #10 x .62” Self-Drilling
Screw (CMV) will be used in Section 1.
Save the second Screw for use in Section 5.
5”
(Not actual length)
EAP (x2)
5/16” x 1” Carriage Bolt
AAQ (x2)
3/8” Push Nut
ABK (x4)
5/16” Nylock Flange Nut
AAV (x2)
5/16”Jam Nut
ADR (x4)
#7 x 3/8” Screw
Hardware shown at 25% of Actual Size
AJW (x2)
Compression Spring
APZ (x1)
4” U-Bolt
ABQ (x1)
3/8” x 5 1/2” Axle
12
HARDWARE IDENTIFIER
AAD (x1)
1/2” x 7 1/16” Hex Bolt
(Not actual length)
AAX (x4)
1/2” Centerlock Nut
BACKBOARD TO POLE ASSEMBLY HARDWARE [BCR]
Hardware shown at Actual Size
AQB (x2)
5/16” x 3/4”
Thread-Cutting Bolt
ABP (x2)
1/2” x 3/8” Poly Spacer
AOR (x6)
1/2” Washer
ANK (x4)
1/2” Nylon Washer
AQD (x1)
1/2” x 5” Hex Bolt
5”
(Not actual length)
ANQ (x2)
1/2” x 3” Bolt with Nylon Patch
ANZ (x2)
1/2” x 1/5” Spacer
ABN (x4)
1/2” x 1/8” Plastic Washer
ANS (x4)
1/2” Nylon Plug
ANP (x1)
1/2” x 1 3/4” Nut Coupler
ANU (x2)
1/2” x 1 3/4” Hex Bolt
7 1/16”
13
HARDWARE IDENTIFIER
HANDLE ASSEMBLY HARDWARE [BCT]
Hardware shown at Actual Size
ACX (x1)
5/16” x 2 1/2” Hex Bolt
BFI (x1)
3/8” Nylock Jam Nut
CKT (x1)
.69” x 3 1/2” Poly Spacer
CKU (x2)
.69” x 3/4”
Poly Spacer
CHQ (x1)
3/8” x 1” Hex Bolt
AEB (x2)
1/4” Flat Washer
ABN (x4)
1/2” x 1/8” Plastic Washer
ANK (x2)
1/2” Nylon
Washer
CKX (x2)
.63” x 2 1/2” Spacer
CKY (x2)
1/2” x 1.15” Black Poly Spacer
CKZ (x1)
Gas Shock Rod
6”
(Not actual length)
CKW (x1)
3/8” x 6” Hex Bolt
(Not actual length)
AAD (x1)
1/2” x 7 1/16” Hex Bolt
AOR (x2)
1/2” Flat Washer
7 1/16”
14
HARDWARE IDENTIFIER
HANDLE ASSEMBLY HARDWARE (CONTINUED)
Hardware shown at Actual Size
AAX (x3)
1/2” Centerlock Nut
AAO (x1)
5/16” Nylock Nut
ABB (x1)
3/8” Centerlock Nut
AAW (x2)
1/2” x 6 1/2” Hex Bolt
(Not actual length)
ANZ (x3)
1/2” x 1/5” Spacer
AAB (x2)
1/4” Centerlock Nut
CKV (x2)
3/8” Plastic Washer
ADT (x7)
#6 x 5/8” Screw
ADP (x10)
#10 x 7/8” Self-Drilling Flat Screw
FRAME PAD ASSEMBLY HARDWARE [BCU]
Hardware shown at Actual Size
AKH (x1)
Grease Packet
6 1/2”
15
POLE ASSEMBLY
HARDWARE REQUIRED
SEC
1
Hardware shown at Actual Size
CMV (x2)*
#10 x .62” Self-Drilling
Screw
AAA (x2)
3/8” Nylock Nut
AAF (x2)
3/8” Washer
ANF (x2)
3/8” x 5” Hex Bolt
ANE (x2)
1/2” x 3.91” Spacer
5”
(Not actual length)
Note: Only one #10 x .62” Self-Drilling Screw (CMV) will be used in
Section 1. Save the second Screw for use in Section 5.
!
16
PARTS REQUIRED
TOOLS REQUIRED
Parts shown at 10% of Actual Size
Phillips Screwdriver
Wood Block
ALH (x1)
Top Pole
ALF (x1)
Middle Pole
ALE (x1)
Bottom Pole
ALL (x1)
Pole Bracket
Part shown at 25% of Actual Size
9/16” Socket Wrench (x2)
Electric Drill
Warning Sticker
POLE ASSEMBLY
SEC
1
30” Rebar
Shovel
Tape Measure
Cement Mix
Level
17
TOOLS AND HARDWARE REQUIRED FOR THIS PAGE
Dig a round hole 24” deep and 21” in diameter. If you live in an area
where frost heaves may pose a problem, consult your local building
inspector to determine the proper hole depth. The edge of the hole
should be fl ush with the edge of the playing surface.
SEC
1.1
Note: A Ground Sleeve is available as an alternative to cementing
the Pole into the ground. Please contact Customer Service for
more information.
!
NO HARDWARE REQUIRED FOR THIS PAGE
Mix 8 1/2 bags of concrete. Save 1/2 bag of concrete mix to use
later in the assembly. Pour the mixed concrete into the hole until it is
lled to the level of the playing surface.
(9 Bags, 80 lb each)
18
TOOLS AND HARDWARE REQUIRED FOR THIS PAGE
ALE
16”
Make a mark 16 inches from the dimpled end of the Bottom Pole (ALE)
(do not scratch the powder coating). Slide the Alignment Frame (BGW)
over the Bottom Pole.
SEC
1.2
Playing
Surface
ALE
TOP VIEW
BGW
Slide the dimpled end of the Bottom Pole (ALE) into the cement up to
the 16-inch mark. Position the pole next to the playing surface. For
regulation courts, the Alignment Frame (BGW) should cross the playing
surface at the middle of the scored measurements.
SEC
1.3
ALE
BGW
Note: Use a Level to make sure the Bottom Pole is standing vertical. Form
the cement into a downward slope away from the pole to allow water runoff.
Failure to do so may result in premature rusting of the Pole.
!
NO TOOLS OR HARDWARE REQUIRED FOR THIS PAGE
19
TOOLS AND HARDWARE REQUIRED FOR THIS PAGE
Dimpled end
Rebar
Insert the 30” rebar (not included) inside the Bottom Pole (ALE) so it is
about 15” from the top of the pole. Check the pole several times within
the fi rst hour to make sure that all sides are vertical and that the 16-inch mark
remains level with the surface.
SEC
1.4
Note: Allow 1-4 hours for the concrete to set.
!
30” Rebar
NO HARDWARE REQUIRED FOR THIS PAGE
20
TOOLS AND HARDWARE REQUIRED FOR THIS PAGE
Mix the remaining 1/2 bag of concrete. Fill the Bottom Pole (ALE) with
concrete until it reaches the top of the rebar (about 15” from the
top of the pole). Tamp the concrete down in the Bottom Pole with
a broom handle to remove air pockets. Clean all concrete off the
outside of the pole. You may now remove the Alignment Frame (BGW).
Allow the concrete to set for at least 72 hours before installing the rest of the
system onto the Bottom Pole.
SEC
1.5
Cement Level
Inside Pole
15”
Rebar
Note: STOP HERE! The concrete must cure for at least 72 hours (3 days) before
installing the rest of the system. In humid climates or wet weather, allow additional
time for the concrete to cure. Do not proceed until the curing process is complete.
!
NO HARDWARE REQUIRED FOR THIS PAGE
/