Fortress HD0207TB Operating instructions

Type
Operating instructions

This manual is also suitable for

Fortress HD0207TB is easy to assemble, professional-quality scaffolding designed for exterior and interior use. Its 2475 lbs. maximum load capacity is perfect for contracting trades, and the guard panel system makes assembly a breeze. The 7' guardrails and 5' guardrails add an extra layer of safety, while the gravity pins make it easy to adjust the height of the scaffold. The Fortress HD0207TB is perfect for a variety of tasks, from painting and repairs to cleaning and maintenance. With its sturdy construction and easy-to-use features, the Fortress HD0207TB is the perfect tool for any job.

Fortress HD0207TB is easy to assemble, professional-quality scaffolding designed for exterior and interior use. Its 2475 lbs. maximum load capacity is perfect for contracting trades, and the guard panel system makes assembly a breeze. The 7' guardrails and 5' guardrails add an extra layer of safety, while the gravity pins make it easy to adjust the height of the scaffold. The Fortress HD0207TB is perfect for a variety of tasks, from painting and repairs to cleaning and maintenance. With its sturdy construction and easy-to-use features, the Fortress HD0207TB is the perfect tool for any job.

Phone # 800-980-8841 | Fax # 909-627-8211 | info@fortressindustriesinc.com | www.fortressindustriesinc.com
Mailing Address: 12188 Central Ave #188, Chino, CA 91710 | Physical Address: 13860 Benson Ave - Unit B, Chino, CA 91710
Frame Scaolding Towers
Rolling & Stationary
5, 10, 15 and 20 High
OPERATING INSTRUCTIONS
READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT.
SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE.
This manual provides important information on proper operation and maintenance. Every eort has been
made to ensure the accuracy of this manual. We reserve the right to change this product at any time without
prior notice.
STOP! CONTACT CUSTOMER SERVICE WITH QUESTIONS OR PROBLEMS.
If you experience a problem or need parts for this product, please call Fortress Industries customer service at
800-980-8841.
www.fortressindustriesinc.com
TABLE OF CONTENT
General Product Specications
Features
Package Contents
Safety Practices
Assembly of a Scaold Tower
............................................ Page 3
........................................................................... Page 3
........................................................... Page 4-5
................................................................. Page 6
............................................... Page 7
Phone # 800-980-8841 | Fax # 909-627-8211 | info@fortressindustriesinc.com | www.fortressindustriesinc.com
Mailing Address: 12188 Central Ave #188, Chino, CA 91710 | Physical Address: 13860 Benson Ave - Unit B, Chino, CA 91710
www.fortressindustriesinc.com
www.fortressindustriesinc.com
PAGE 3
Phone # 800-980-8841 | Fax # 909-627-8211 | info@fortressindustriesinc.com | www.fortressindustriesinc.com
Mailing Address: 12188 Central Ave #188, Chino, CA 91710 | Physical Address: 13860 Benson Ave - Unit B, Chino, CA 91710
GENERAL PRODUCT SPECIFICATIONS
Features
Built for exterior and interior use
Professional quality for all contracting trades
Guard panel system designed for simple assembly
Easy two-person assembly
Maximum load capacity for scaold tower with baseplates is 2475 lbs.
Maximum load capacity for scaold tower with casters is 2000 lbs.
Pigtails-Gravity Locks
5’ Guard Rail
7’ Guard Rail
Outrigger
8” Casters
Squaring Brace
Base Plate
Scaold Frame 5’ x 5’
Insert Pin /Spring Retainer
Scaold Cross Brace
Sca -Platform 7’x 19”
Snap Pin
Toe Board Set
Screw jack w/Base Plate
Screw jack w/Socket
Toggle Pin
www.fortressindustriesinc.com
PAGE 3
Phone # 800-980-8841 | Fax # 909-627-8211 | info@fortressindustriesinc.com | www.fortressindustriesinc.com
Mailing Address: 12188 Central Ave #188, Chino, CA 91710 | Physical Address: 13860 Benson Ave - Unit B, Chino, CA 91710
BASE PLATES SCAFFOLD TOWERS
20’ Scaold Tower with Baseplates
Package Contents
(8) Ladder frame - 5 ft. x 5 ft. with coupling pins
(8) Cross braces - 7 ft.
(3) Platform - 7 ft. aluminum/plywood
(8) Base plates
(4) Outriggers
(2) 5 ft. end guard panels
(2) 7 ft. side guard panels
(24) Gravity pins
15’ Scaold Tower with Baseplates
Package Contents
(6) Ladder frame - 5 ft. x 5 ft. with coupling pins
(6) Cross braces 7 ft.
(3) 7 ft. aluminum/plywood
(4) Base plates
(2) 5 ft. end guard panels
(2) 7 ft. side guard panels
(16) Gravity pins
Package Contents
(4) Ladder frame - 5 ft. x 5 ft. with coupling pins
(4) Cross braces 7 ft.
(3) 7 ft. aluminum/plywood
(4) Base plates
(2) 5 ft. end guard panels
(2) 7 ft. side guard panels
(12) Gravity pins
Package Contents
(2) Ladder frame - 5 ft. x 5 ft. with coupling pins
(2) Cross braces 7 ft.
(3) 7 ft. aluminum/plywood
(4) Base plates
(2) 5 ft. end guard panels
(2) 7 ft. side guard panels
(8) Gravity pins
10’ Scaold Tower with Baseplates
5’ Scaold Tower with Baseplates
www.fortressindustriesinc.com
PAGE 4
Phone # 800-980-8841 | Fax # 909-627-8211 | info@fortressindustriesinc.com | www.fortressindustriesinc.com
Mailing Address: 12188 Central Ave #188, Chino, CA 91710 | Physical Address: 13860 Benson Ave - Unit B, Chino, CA 91710
CASTERS SCAFFOLD TOWERS
20’ Scaold Tower with Casters
Package Contents
(8) Ladder frame - 5 ft. x 5 ft. with coupling pins
(8) Cross braces - 7 ft.
(3) Platform - 7 ft. aluminum/plywood
(8) Casters 8 in.
(4) Outriggers
(2) 5 ft. end guard panels
(2) 7 ft. side guard panels
(24) Gravity pins
15’ Scaold Tower with Casters
Package Contents
(6) Ladder frame - 5 ft. x 5 ft. with coupling pins
(6) Cross braces 7 ft.
(3) 7 ft. aluminum/plywood
(4) Base plates
(2) 5 ft. end guard panels
(2) 7 ft. side guard panels
(20) Gravity pins
Package Contents
(4) Ladder frame - 5 ft. x 5 ft. with coupling pins
(4) Cross braces 7 ft.
(3) 7 ft. aluminum/plywood
(4) Base plates
(2) 5 ft. end guard panels
(2) 7 ft. side guard panels
(12) Gravity pins
Package Contents
(2) Ladder frame - 5 ft. x 5 ft. with coupling pins
(2) Cross braces 7 ft.
(3) 7 ft. aluminum/plywood
(4) Base plates
(2) 5 ft. end guard panels
(2) 7 ft. side guard panels
(8) Gravity pins
10’ Scaold Tower with Casters
5’ Scaold Tower with Casters
www.fortressindustriesinc.com
PAGE 5
Phone # 800-980-8841 | Fax # 909-627-8211 | info@fortressindustriesinc.com | www.fortressindustriesinc.com
Mailing Address: 12188 Central Ave #188, Chino, CA 91710 | Physical Address: 13860 Benson Ave - Unit B, Chino, CA 91710
• Inspect scaffold daily or before each use.
• Do not exert horizontal force from on top of a free standing scaffold.
When hoisting materials or using side brackets, scaffold must be retrained from tipping by guying or
tying to a permanent structure or other acceptable means.
• Do not use boxes, ladders, or other means to increase working heights.
• Do not stand or sit on guard rails.
• Do not climb or stand on cross brace or horizontal brace.
• Do not swing around corner of scaffold to enter platform from the cross braces side.
• Do not use bricks, boxes, Concrete blocks, or any other unstable objects under scaffold leg.
• NEVER ride a moving Scaffold.
• Never operate scaffolding or any tool under the inuence of alcohol or drugs
• Do not move scaffold by applying a pulling or pushing force at or near the top of scaffold tower.
• Do not use braces as a platform support
• Do not use side brackets on a rolling tower.
Two or more people are recommended for erecting scaffolding.
• Restrict loading to safe working loads.
• Use caution. Keep scaffold away from all electric hazards.
Wear hard hats and safety glasses when required.
WARNING AND
SAFETY PRACTICES
www.fortressindustriesinc.com
PAGE 6
Phone # 800-980-8841 | Fax # 909-627-8211 | info@fortressindustriesinc.com | www.fortressindustriesinc.com
Mailing Address: 12188 Central Ave #188, Chino, CA 91710 | Physical Address: 13860 Benson Ave - Unit B, Chino, CA 91710
Assembly of Scaffold Tower 5’, 10’, 15’ and 20’ High
(Rolling or Stationary)
Check all scaold parts for damage, making sure that they are in proper working condition prior to
assembly and erection of scaold. Equipment that is damaged or is not in proper working condition
should not be used.
Attach (2) scaold frames with (2) cross braces.
Insert (4) casters or base plates into bottom of scaold frame legs, secure with locking pins or gravity
pins. When using leveling jacks (optional) rst insert caster or base plates into leveling jacks, secure
with locking pins or gravity pins, then insert leveling jacks into bottom of scaold frame legs. If using
casters be sure to set brakes to proceed.
When choosing casters for a rolling scaold tower, the installation of a squaring brace is needed and
applied diagonally at base of scaold frames. (On a 20’ Scaold Tower (2) squaring brace are needed
one at the base and one at 15’)
(4) Outriggers are needed for rolling towers 15’ and higher and stationary tower at the 20’ level.
Apply (3) scaold platforms along top horizontal of scaold frames.
Adding Tower Height Add additional scaold frames by installing bottom of additional scaold
frames onto insert pins at the top of scaold frames erected in step #2 and secure with gravity locks.
Then apply (2) cross braces to additional scaold frames. Be sure to install scaold frames so that steps
continue above one another on the same side of frame. Move the scaold platforms to the newly
added frames and install as previous in step #6. With this step you are at a 10’ height, repeat this step
#7 to achieve maximum height of 20’.
After reaching desired height, install guard panel system. First install (2) 5’ end panels onto top of
scaold frames insert pins and secure with gravity locks. Then install (2) 7‘ side panels onto locks of
end panels.
When option for using Toe Boards, rst install 5’ End Toe Boards with brackets onto 5’ End Guard Panel
with U-Bolt provided. Then install 7’ Side Toe Boards into channel bracket provided on 5’ End Guard
Panel secured with Toggle Pins.
1
2
3
4
5
6
7
8
9
5’ X 5’ Scaold Frame
5’ X 5’ Scaold Frame
Gravity Pin
Insert Pin
Cross Brace
Base Plate
Gravity Pin
Scaold Platform
Outrigger
Squaring Brace
Caster
Leveling Jack
Gravity Pin
Locking Pin
Toggle Pin
Guard Panel System
7’ Side Panel
7’ Side Toe Board
5’ End Panel
www.fortressindustriesinc.com
PAGE 7
5’ End Toe Board
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7

Fortress HD0207TB Operating instructions

Type
Operating instructions
This manual is also suitable for

Fortress HD0207TB is easy to assemble, professional-quality scaffolding designed for exterior and interior use. Its 2475 lbs. maximum load capacity is perfect for contracting trades, and the guard panel system makes assembly a breeze. The 7' guardrails and 5' guardrails add an extra layer of safety, while the gravity pins make it easy to adjust the height of the scaffold. The Fortress HD0207TB is perfect for a variety of tasks, from painting and repairs to cleaning and maintenance. With its sturdy construction and easy-to-use features, the Fortress HD0207TB is the perfect tool for any job.

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI