QUICKSTART “BASIC” GUIDELINES FOR MODEL 1150 - FOR OVERHEAD GATES UP TO 14 FEET HIGH AND 25 FEET WIDE
120 Glasgow Avenue
Inglewood, California 90301
U.S.A.
1150-066-E-3-13
Assemble Operator
Mount Operator
Secure rails to powerhead assembly
with 4 bolts, nuts and lock washers.
Manual Release
Limit Switches
Unlock,
Pull and
Turn Ring
Double Master Chain Link
Chain Tension Adjustment
Always adjust both sides of rails evenly.
CAUTION
FRAGILE POWERHEAD!
Sprocket
SW1
Auto Close Timer
High Voltage (Rigid Conduit)
Loop (Flexible Dry Conduit)
AC
ON/OFF
Switch
123
Board Adjustments
A
C
B
When SW1, switch 2 is turned ON,
automatic timer can be set from 1-23
seconds to automatically close gate.
1. ON
2. Auto Close Timer
3. ON
4. OFF
5. OFF
6. OFF
7. OFF
8. OFF
1. OFF
2. OFF
3. ON
4. OFF
1
ON
2 3 4
SW 2
Radio Receiver
Loop Detectors
E
Not included - Refer to the Owner’s manual
and Loop Information Manual (available from
www.dkaccess.com) for more information
on loops and loop detectors.
F
115 VAC Connection
Tip: It is recommended that a surge suppressor
be installed on the high voltage power lines.
DANGER
HIGH VOLTAGE!
D
OPERATOR MUST BE
PROPERLY GROUNDED!!
Route chain around gear reducer’s
sprocket and through unlocked
carriage assembly. Connect
chain together with double
master link.
Chain must not rub on steel rail separators.
Push and Hold Tab
Open
Limit
Nut
Push and hold locking plate tab
to adjust limit nuts at full open
and full close gate positions.
PUSH TO OPERATE
technician use only
Model 1150 is intended for installation only on overhead gates used for vehicles.
Pedestrians must be supplied with a separate access opening.
For safety and installation instructions, please refer to the owner’s manual.
F
CLOSE
OPEN
9410
9410
E
E
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
D
Close
Limit
Nut
LIMIT
LIMIT
PA RT
TIME
DELAY
REV SENSE
CLOSE
REV SENSE
OPEN
1
ON
2 3 4 1
ON
2 3 4 5 6 7 8
NO NC
EXIT
LOOP
REVERSE
LOOP
GATE FORCED
C
B
A
IMPORTANT: The carriage assembly’s spring
loaded chain catch will only lock into place
in the double master chain link.
Fill Mark
Install breather cap after operator has been mounted. Check
oil level, use Mobil SHC-629 synthetic gear oil or equivalent.
IMPORTANT: Gearbox should be filled to fill mark only.
Do not overfill.
Chassis Ground
Neutral (White)
Hot (Black)
After DIP-switches are changed, power must be
shut-off, and turned back on for new settings.
Close LED
Open LED
2.5” Minimum
Install the gate bracket “centered” on the top rail of the gate by bolting or welding. Center the header bracket above
the top of the gate bracket a minimum of 2.5 inches from the bottom of the header bracket. Check the gate’s opening
swing path, some gates will swing open higher than the bottom of the header
and could hit the rails if they are mounted too low. Mount header bracket with
lag bolts, anchor sleeves or welding to header.
Header
Install Breather Cap on Gearbox
Gate Bracket
Gate Bracket
Gate
Carriage Assembly
Header Bracket
If a ceiling extension bracket is needed, it must be
fabricated (2” wide L angle steel is recommended).
Install the powerhead with lag bolts or anchor
sleeves. Rails must be mounted level!
Ceiling
Connect the arms together with 2 bolts,
then connect them to the carriage assembly
and gate bracket.
Header
Bracket
Do not let chain rub against steel rail separators.
Chain tension adjustment. Adjust
equally on both sides of rails.
Header
Header and gate brackets must be level
and securely mounted!
Chain
Sprocket
Copyright 2013 DoorKing, Inc. All rights reserved.
See reverse side
See reverse side to wire main terminal.
Not included - Refer to a specific Radio Receiver
Manual (available from www.dkaccess.com) for
more information on radio receivers and antenna
installation. (See reverse side for wiring)