SATELLITE Impact Base Operating instructions

  • Hello! I've reviewed the provided instructions for removing and installing floors on impact bases for Tufway, Global II, MX3 II, MX2 II , Axxis, and Taurus units. The document details the steps for disengaging and securing the floor, including the use of specific tools and hardware. I'm ready to answer your questions about these procedures. How can I help you?
  • What size hex driver is needed to remove the floor screws?
    What size hex driver is needed to remove lag screws?
    How many screws secure the floor to the base?
16/19
Lay unit on rear panel. Remove floor (PN 10032) from base: Disengage 8 screws/washers
in bottom of base into floor using 7/16” hex driver bit w/drill & pull floor from top of base (will
need to remove lag screws in front / side panels on models noted below using a 3/8” hex
driver bit w / drill). Install floor on base: Set floor on top of base inside unit. (Note: bottom of
floor has (8) screw bosses & rear of floor has slots.) (Will need to install lag screws in
front/side panels on models noted below using a 3/8” hex driver bit w/drill.) Secure floor to
bottom of base using 8 screws PN 22727 with 8 washers PN 11360 into 8 bosses on bottom
of floor.
Unit Removing / installing floor on Impact base in an assembled unit
Tufway
Remove / Install 8 screws w/washers securing floor to base. Floor can then be pulled
from or placed on base in an assembled unit.
Global II
Remove / Install 8 screws w/washers securing floor to base. Floor can then be pulled
from or placed on base in an assembled unit. Unit with T
-extrusion or HD extrusion
MX3 II
Remove / Install 8 screws w/washers securing floor to base. Also completely remove /
install 6 lag screws in front to base & 1 lag screw on each panel to base (lag screw at
front of left / right side panels) using a 3/8” hex
driver bit w/drill.
Floor can then be pulled
from or placed on base in an assembled unit.
MX2 II
Remove / Install 8 screws w/washers securing floor to base. Also completely remove /
install 6 lag screws in front to base & 1 lag screw on each panel to base (lag screw at
front of left / right side panels) using a 3/8” hex
driver bit w/drill.
Floor can then be pulled
from or placed on base in an assembled unit.
Axxis
Remove / Install 8 screws w/washers securing floor to base. Floor can then be pulled
from or placed on base in an assembled unit.
Taurus
Remove / Install 8 screws w/washers securing floor to base. Also completely remove /
install 6 lag screws in front to base. Floor can then be pulled from or placed on base in
an assembled unit.
INSTRUCTIONS TO REMOVE / INSTALL FLOOR ON IMPACT BASE
/