7 Installation in a new fireplace.................................................................35
7.1 Install the appliance - general procedure...................................................................................35
7.2 Preparation for installation......................................................................................................... 35
7.3 Install the appliance................................................................................................................... 35
7.4 Horizontally align the appliance................................................................................................. 36
7.4.1 Aligning with adjustable feet............................................................................................36
7.4.2 Aligning with adjustable height frame..............................................................................37
7.5 Make the electrical connection...................................................................................................37
7.6 Connect the flue gas pipe.......................................................................................................... 38
7.7 Connection on the combustion air box.......................................................................................38
7.8 Connect the convection set (optional)........................................................................................39
7.9 Connect the convection air outlet...............................................................................................40
7.10 Insulate the appliance................................................................................................................41
7.11 Build the fireplace...................................................................................................................... 41
7.12 NTC room temperature sensor (Opti-Air system only)...............................................................42
7.13 Battery holder (Opti-Air system only).........................................................................................43
7.14 Final check on the appliance..................................................................................................... 43
8 Installation of the Opti-Air app ...............................................................44
9 Maintenance.......................................................................................... 45
9.1 Appliance................................................................................................................................... 45
9.2 Access to inside of door ............................................................................................................45
9.3 Combustion air supply............................................................................................................... 46
9.4 Convection air system................................................................................................................46
9.5 Chimney.....................................................................................................................................46
9.6 Removal of the interior of the combustion chamber.................................................................. 47
9.6.1 Remove the heat shield.................................................................................................. 47
9.6.2 Remove the lower baffle................................................................................................. 48
9.6.3 Remove the upper baffle.................................................................................................48
9.6.4 Remove the grate............................................................................................................48
9.6.5 Remove the cast iron rear panels................................................................................... 49
9.6.6 Remove the steel bottom plates......................................................................................50
9.6.7 Remove the cast iron side panels...................................................................................50
9.6.8 Remove the vermiculite panels.......................................................................................50
9.7 Installation of the interior of the combustion chamber............................................................... 51
9.7.1 Install the vermiculite panels...........................................................................................51
9.7.2 Install the cast iron side panels.......................................................................................51
9.7.3 Install the steel bottom plates .........................................................................................52
9.7.4 Install the cast iron rear panels....................................................................................... 52
9.7.5 Install the grate................................................................................................................53
9.7.6 Install the upper baffle.....................................................................................................53
9.7.7 Install the lower baffle..................................................................................................... 54
9.7.8 Install the heat shield...................................................................................................... 56
9.8 Opti-Air system ......................................................................................................................... 57
Contents
4EVO-7 50-40