AGI EasyFlow2 U-Trough Horizontal Support Assembly Manual

Type
Assembly Manual
31151 R0
Revised: MARCH 2022 1
202165
Horizontal Support Kit
Farm U-Trough Bin Unload System
Installation Instructions
Applicable Models:
Westeel EasyFlow2 U-Trough Models
Installation
Mounting the C-Channel
1C-channel 2Self-tapping Screw, #14 x 5/8"
2
1
2 31151 R0
Installing the Bottom Flange
1UT Bottom Flange 3Bolt, 7/16" x 1"
2C-channel 4Nylon Lock Nut, 7/16"
Mounting the Base Assembly
2
2
1
1
4
2
3
4
3
Assembly Notes:
There are various positions that the C-
channels can be adjusted to, depending
on the ground surface requirements on
site.
Suggested leg configurations are shown
in the image on the next page.
1Base Assembly
2C-channel
3Bolt, 1/2" x 1-1/4"
4Nylon Lock Nut, 1/2"
4
3
2
1
202165 HORIZONTAL SUPPORT KIT – FARM U-TROUGH BIN UNLOAD SYSTEM
31151 R0 3
Extending the Base Legs
Assembly Notes:
Extend base legs until they contact the
ground or support blocks.
Tighten the nuts to secure in place.
1Hex Nut, 1"
1
AGI is a leading provider of equipment solutions for agriculture bulk commodities including seed, fertilizer, grain, and feed systems with a growing platform in providing
equipment and solutions for food processing facilities. AGI has manufacturing facilities in Canada, the United States, the United Kingdom, Brazil, South Africa, India and Italy
and distributes its products globally.
P.O. Box 39, Rosenort, Manitoba, R0G 1W0 Canada
P866.467.7207 (Canada & USA) or 204.746.2396 │ F866.768.4852 │ E[email protected]
AGGROWTH.COM aggrowthintl
©Ag Growth International Inc. 2022 │ Printed in Canada
202165 HORIZONTAL SUPPORT KIT – FARM U-TROUGH BIN UNLOAD SYSTEM
  • Page 1 1
  • Page 2 2
  • Page 3 3

AGI EasyFlow2 U-Trough Horizontal Support Assembly Manual

Type
Assembly Manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI