Shine Company 7604TO Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Shine Company 7604TO Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Back
Front
Step 1: Attach both & Front Legs to Top Panel using four (650 m/m)
Bolts with four Nuts. Attach & Back Legs to Top Panel using
four (650 m/m) Bolts with four Nuts.
Step 2: Use the included Wrench Tool to help hold the Nuts in place while screwing
the Bolts in from the other end. Tighten all Bolts & Nuts. Enjoy your new
ottoman!
PARTS INCLUDED:
B
D
E
B
C
C
D
E
A
A
A
8 PCS
Nuts
1 PC
Wrench
Tool
B
C
&
A
Top Panel
How To Assemble Your Ottoman (Rev. 03/2017)
8 PCS
Bolts
(650 m/m)
2 PC Bolts (650 m/m)
with
2 PC Nuts
2 PC Bolts (650 m/m)
with
2 PC Nuts
TOOLS NEEDED: Philips screwdriver, power drill optional
CAUTION: When assembling ottoman,
DO NOT completely tighten the bolts
and nuts until all the parts and holes are properly aligned.
Do not sit on ottomans.
B
C
Right Left
D
E
Right Left
Front Legs
D
E
&
Back Legs
/