Procom PF09B Installation guide

Type
Installation guide

This manual is also suitable for

Installation of Base Stand
Before installing heater to base, please make sure you have
a hardware packet that contains the following items:
2 - Base Feet
4 - Sheet Metal Screws
1. Carefully lay heater on its back on a table with the bottom
of the heater extending outside the table edge.
2. Attach base feet to heater using sheet metal screws.
Base Feet
Sheet Metal Screws
200023-01
Rev A
02/13
ProCom Heating, Inc.
Bowling Green, KY 42101
www.usaprocom.com
1-866-573-0674
  • Page 1 1

Procom PF09B Installation guide

Type
Installation guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI