SBA033V1

Everbilt SBA033V1 User guide

  • I have reviewed the provided Quick Reference Guide for the Sump Pump. The document outlines the necessary steps for proper installation, including basin size requirements, discharge pipe setup, electrical connections, and testing to confirm functionality. I am ready to help you with any questions you may have about this document.
  • What is the minimum basin size required?
    Do I need to drill a vent hole?
    What kind of outlet is required?
    How do I test the pump operation?
Submersible
Sump Pump
Quick Reference Guide
See instruction manual for
complete instructional details.
1. Ensure basin is clear of all debris and place pump
on hard level surface (not dirt or gravel). 14” x 22”
minimum basin size required.
2. Measure, cut and install discharge fittings, check
valve, and piping. Drill a 3/16” hole in the discharge
pipe, level with the top of the pump.
3. Plug Pump in to GFCI outlet on dedicated circuit with
15 amp breaker
4. Test operation by adding water until float rises, pump
turns on, and the water level drops. Float will lower
with the water level and turn the pump off.
5. Install optional basin cover.
EB-0052-rev 01/2022
14” Minimum
22” Minimum
Check Valve
1-1/2” Discharge Pipe
3/16” Vent Hole
GFCI Outlet
/