  • Hello! I've reviewed the Jetion Solar installation manual. This document includes important details for safely installing your Jetion solar modules such as mounting methods, wiring and grounding guidelines, along with crucial safety warnings. I can help you with specific questions about your modules setup or any other aspect of the manual. Please, feel free to ask.
  • What are the installation environment requirements?
    What is the recommended tilt angle for fixed systems?
    What is the maximum system voltage for modules?
    What should be done for grounding the modules?
Installation Manual
Visionary green energy
Installation Manual
Please read this manual carefully before installation,and keep it for future reference.
Introduction
• JetionSolarPhotovoltaicmodulesconsistofcrystalline
 siliconsolarcells,hightransmissionandlowirontoughened
 glass,anti-agingEVAandhighameresistantbacksheet,and
 anodizedaluminumalloyframe.
• JetionmodulesarequaliedfornationalstandardIEC
 61215.2andIEC61730,whichhavepassedexamination
 oftheauthorisedtytestcenter.Jetionmodulescanbeused
 inroofsolarsystems,PVstations,communicationstations,
 petrol,ocean,meteorological,trafcandPVbuildingsetc.
• Wearecommittedtoprovidingtechnicalandinstallation
 supportforourcustomersworldwide.
• ThisInstallationManualisapplicabletotheinstallation
 ofthefollowingJetionmodules:
JT***SFa/bJT***SAa/bJT***SBa/b
JT***SFcJT***SEcJT***SDcJT***SCcJT***SAc
JT***PFeJT***PEeJT***PDeJT***PCeJT***PAe
JT***SAa/b(Black)JT***SDc(Black)JT***SCc(Black)
Notes: 1.JT***SFa/bisusedhereasanexample.
  2.“***”istheratedpoweroftherelatedJetionmodule.
• Thismanualcontainsimportantinformationregardingthein
 stallation,safehandlingandmaintenanceofPVmodules
 madebyJetion.
• Allinstructionsshouldbereadandunderstoodpriorto
 installingthemodules.Theinstallershouldconformto
 allrequirementsinthismanual.Theappropriatelocalstan-
 dardsandregulations,constructionrulesandsafetyinst-
 ructionsshouldalsobefollowedduringinstallation.Allwork
 onaPVsystemmustbecarriedoutbyappropriatelyqualed
 engineers,whomustbefamiliarwiththemechanicaland
 electricalrequirementsforsuchaPVsystem.
Disclaimer of liability
• Theinstallation,handlinganduseofJetionmodulesarebey-
 ondcompanycontrol.Therefore,Jetionassumesnores-
 ponsibilityforloss,damage,injuryorexpenseresultingfrom
 improperinstallation,handling,useormaintenance.
• Jetionreservestherighttoupdatetheproduct,specications
 orthisInstallationManualwithoutpriornotice.
1) Certificates requests
1.1) IEC 61730
 JetionmodulesaredesignedtofulllthecriteriaofApplica-
 tionclassArequirementsaccordingtoIEC61730-1.
 ModulesratedforuseinapplicationclassAmaybeusedin
 systemsoperatingatgreaterthan50VDCor240W,where
 generalcontactaccessisanticipated.Modulesqualiedfor
 safetythroughIEC61730-1andIEC61730-2withinapplica-
 tionclassAareconsideredtomeettherequirementsfor
 safetyclass.
1.2) UL
• Theelectricalcharacteristicsarewithin+/-10%oftherated
 valuesofIsc,VocandPmpundertestconditions(irradiance
 of100mW/cm2,AM1.5spectrum,andcelltemperatureof
 25°C).
• Thestand-offheightshouldbeatleast100mm(3.94in),and
 therecommendedstand-offheightis115mm(4.53in).If
 othermountingmeansareemployed,thismayaffectthe
 ListingForFireClassRatings.
• ThemoduleshavebeenevaluatedbyULforamaximum
 positiveornegativedesignloadingof30lb/ft²(146.5kg/m²).
• WiringmethodsshouldbeinaccordancewiththeNEC.
• ForinstallationinCanada,theinstallationshallalsobein
 accordancewithCSAC22.1,safetyStandardsforElectrical
 Installations,CanadianElectricalCode,Part1.
2) Installation requirements
2.1) Installation environment requirements
Avoidshading:
 Evenifthesmallestlocalshelter/shadow(suchasdustdepo-
 sition)willalsodecreasetheoutputpower.
Adequateventilation:
 Hightemperatureofthemodulemayreducetheperfor-
 manceandoutputpowerofthemodule.Goodventilation
 caneffectivelyavoidtheoverheatingofPVmodules.
• Others:
- Donotinstallthemodulenearinammablegas(suchas
 gasstation,gastanketc.)
- Donotinstallthemodulenearnakedameorammable
 materials.
- Donotinstallthemoduleinalocationwithpotentialforextre-
 mesandanddustdamage.
- Donotinstallthemoduleinalocationwithextremeair
 pollution,suchaschemicalvapors,acidrain,and/orsoot.
- Donotexposethemoduletoalasersource.
- Donotinstallthemoduleinalocationwithextremehailand/
 orsnow.
- Donotinstallthemoduleinalocationwhereitcouldbe
 immersedinwaterorcontinuallyexposedtowaterfroma
 sprinklerorfountain.
- Donotinstallthemoduleinamarineenvironmentand/or
 areawheresaltywindhitdirectly.Itisrecommendedthatthe
 modulebeinstalledatleast500mfromthesea.
- Environmenttemperature-20°Cto40°C.
- Operatingtemperature-40°Cto85°C.
2.2) Orientation and tilt for modules installation
• Solarmodulesproducethemaxpowerwhentheyare
 pointeddirectlyatthesun.Inordertoachievemaximum
 annualyield,optimumorientationandtiltofPVmodulesis
 necessary.Themodules,whichconnectedinasystem,must
 beinsameorientationandtilt,otherwise,itwilllosethepow-
 erbecauseofthedifferencesofsunshineradiation.
• Themodulesmustbefacingthenorthinthesouthhemis-
 phere,andfacingsouthinnorthhemisphere.
• Foroff-gridinstallationswheretheJetionmodulesareat-
 tachedtoapermanentlystructure,theJetionmodules
 shouldbetitledforoptimumwinterperformance.Asarule,
 ifthesystempowerproductionisadequateinwinter,itwillbe
 satisfactoryduringtherestoftheyear.Themoduletiteangle
 ismeasuredbetweenthesolarmodulesandtheground.
Fig.1: ModuleTiltAngle
RECOMMENDEDTILTANGLESFORAFIXEDSYSTEM
SITELATITUDEINDEGREES FIXEDTILTANGLE
0°to15°    15°
15°to25°   SAMEASLATITUDE
25°to30°   LATITUDE+5°
30°to35°   LATITUDE+10°
35°to40°   LATITUDE+15°
40°+   LATITUDE+20°
Table1: ModuleTiltAngle
2.3) Materials requirements
• Supportstructure
 Thesupportstructureofthemoduleismadeofabrason
 proof,corrosionresistantandUVresistantmaterialswhich
 correspondstotheappropriatestructuralrequirements.The
 mountingstructureandthemoduleattachmentsmustbe
 designedinaccordancewiththelocalwindandsnowloads.
• Bypassdiode
 Partialshadingofanindividualmodulecancauseareverse
 voltageacrosstheshadedmodule.Currentisthenforced
 gothroughtheshadedareabytheothermodules.Whena
 bypassdiodeiswiredinparallelwiththeseriesstring,the
 forcedcurrentwillowthroughthediodeandbypassthe
 shadedmodule,therebyminimizingmoduleheatingandarray
 current losses.
• Supportstructure
 Inasystemthatusesabattery,blockingdiodesaretypically
 placedbetweenthebatteryandthemoduleoutputtoprevent
 batterydischargeatnightandrainyweather.Diodesthatare
 usedasblockingdiodesmusthavea:
a)RatedAverageForwardCurrent[[IF(AV)][abovethemaximum
 systemcurrentathehighestmoduleoperatingtemperature.
b)RatedRepetitivePeakReverseVoltage[(VRRM)[abovethe
 maximumsystemvoltage[(Vmax)[atthelowestmodule
 operatingtemperature[(IEC:[Vmax=1000V;[UL:[Vmax=600V).
• Battery
 Whensolarmodulesareusedtochargebatteries,thebattery
 mustbeinstalledinamannerwhichwillprotecttheperfor-
 manceofthesystemandthesafetyofitsusers.Thebattery
 shouldbeawayfromthemainowofpeopleandanimal
 trafc.Selectabatterysitethatisprotectedfromsunlight,
 rain,snow,debris,andiswellventilated.Mostbatteries
 generatehydrogengaswhencharging,whichisexplosive.
 Donotlightmatchesorcreatesparksnearthebatterybank.
 Whenabatteryisinstalledoutdoors,itshouldbeplacedin
 aninsulatedandventilatedbatterycasespecicallydesigned
 forthepurpose.
• Cableandothercomponents
a)Ensurethatallcomponentsmeettherequirementsofthe
 system´smaximumvoltage,current,moistureandtempera-
 turewhentheyareexposedtosunlight.Werecommended
 thatallwiringandelectricalconnectionscomplywiththe
 appropriatenationalelectricalcode.
b)Undernormalcondition,aphotovoltaicmoduleislikelyto
 experienceconditionsthatproducemorecurrentand/or
 voltagethanreportedatstandardtestconditions.
 Accordingly,thevaluesofIscandVocmarkedonthismodule
 shouldbemultipliedbyafactorof1.25whendetermining
 componentvoltageratings,conductorcurrentratings,fuse
 sizesandsizeofcontrolsconnectedtothePVoutput.Refer
 tosection690-8oftheU.S.NationalElectricCodeforan
 additionalmultiplyingof1.25whichmaybeapplicable.
c)Onlycableswithoneconductoraretobeused.
Module
Sunlight
Tilt Angle
Horizontal
d)Theareaofthecablematedwiththeconnectorisre-
 commendedtobe4~6mm²,length:1000mm,tempera-
 turerange:-40[to90.Themaximumseriesfuse[IMax.Series
 fuse[(Mono-125:[IMax.Seriesfuse=10A[Mono-156&Poly-156
 IMax.Seriesfuse=15A)[.
2.4) The requirements for different types of mount
Groundmount
 Selecttheheightofthemountingsystemtopreventthe
 lowestedgeofthemodulefrombeingcoveredbysnowfora
 longtimeinwinterinareasthatexperienceheavysnowfalls.
 Inaddition,assurethelowestportionofthemoduleisplaced
 highenoughsothatitisnotshadedbysandandstone
 drivenbywind.
Roofmount
a)Wheninstallingamoduleonarooforbuilding,ensurethatit
 issecurelyfastenedandcannotfallasaresultofwindor
 snowload.
b)Themodulesaresupportedparalleltosurfaceofthebuilding
 wallorroof.Clearancebetweenthemoduleframesand
 surfaceofthewallorroofisrequiredtopreventwiringdama-
 geandtoallowairtocirculatebehindthemodule.
 Thestandoffheightshouldbeatleast100mm[(3.94in).The
 recommendedstand-offheightis115mm[(4.53in).[
c)Theroofinstallationofmodulesmayaffectthereproofper-
 formanceofbuildingstructure.
d)ThemodulesmustbeinstalledontoaClassiedRoong
 system.ThemodulesareClassC.Youcanmountthemover
 aClassC,BorAroof.Theamountofareathemodules
 covermaydegradetheroof‘soriginalreratinginsomeloca-
 tions.Donotinstallmodulesonarooforbuildingduring
 strongwindsincaseofaccident.
Polemount
 Wheninstallingamoduleonapool,chooseapoleand
 modulemountingstructurethatshouldwillwithstandantici-
 patedwindsforthearea.
3) Mounting Methods
 Topreventbending,vibration,mechanicalstressor
 warpage,mountthemoduleontoaatcontactsurface.The
 minimaldistancebetweenmountedmodulesshouldbeno
 lessthan20mm.Useallthemountingpointsprovidedand
 avoiddirectcontactbetweenglassandmetal[(e.g.mounting
 rails).
Option1:ClampingMounting
 Theclampsmustnotoverlaptheglassorshadethemodule
 surface,ordistorttheframe.Recommendedtorqueis5Nm.
Fig.2
ModuleType Frame Type1 Type2 Type3
JT***SFa/b 30mm
JT***SAa/b
JT***SAa/b(Black) 40mm
JT***SC-Fc 40mm
JT***SC-Dc(Black) 40mm
JT***PC-Fe 40mm
JT***PAe/JT***SAc 45mm
JT***SBa/b 45mm
Table2
Notes:
1)JT***SFa/bisusedasanexample.
2)Where“***”istheratedpoweroftheJetionmodule.
3)“indicates5400paavailable;““indicates2400pais
 available;““indicatesnoallowed.
4)Differentframeheightshouldchooseappropriateclampand
 bolt.
5)MechanicalloadtestperformedaccordingtoIEC
 standard,notapplicableforULproducts.
Type 1 Type 2 Type 3
Standard Mounting Short Side Mounting Triangle Mounting
FringeModules
Installation
MountingRail
Clamp
JT***SFa/b
JT***SAa/b
JT***SAa/b(Black)
JT***SBa/b
JT***PFe/JT***SFc
JT***PEe/JT***SEc
JT***PDe/JT***SDc/
JT***SDc(Black)
JT***PCe/JT***SCc/
JT***SCc(Black)
JT***PAe/JT***SAc
Mono
Mono
Mono
Poly/Mono
Poly/Mono
Poly/Mono
Mono
Poly/Mono
Mono
Poly/Mono
4x9
6x12
8x12
4x9
6x8
6x9
6x10
6x12
Type1:StandardMounting
Fig.3
ModuleTypeCellTypeCellDimensions(mm)
Quantity AxBJKMNP
 Table3(Foryourinformation)
Notes:
1)JT***SFa/bisusedasanexample.
2)Where“***”istheratedpoweroftheJetionmodule.
3)Dimension„N“representsthedistancebetweenclampandframe.
4)Dimension„P“representsthethicknessofclamp.
Themovementofthe
mountingrailandthe
clampscenter-lineare
recommendedtobe
withintheblackarrow
area.Pleasendspecic
datafromTable3.
MountingRail
M8Screw
MiddleModules
Installation
Frame(longside)
200
200
200
200
200
200
200
200
1195×541
1580×808
1580×1069
1482×676
1324×992
1482×992
1655×992
1956×992
50
50
50
50
50
50
50
50
12
12
12
12
12
12
12
12
0.5~2
0.5~2
0.5~2
0.5~2
0.5~2
0.5~2
0.5~2
0.5~2
2.5~3
2.5~3
2.5~3
2.5~3
2.5~3
2.5~3
2.5~3
2.5~3
M8Screw
MiddleModules
Installation
Frame(longside)
MountingrailClamp
Themovementofthe
mountingrailandthe
clampscenter-lineare
recommendedtobe
withintheblackarrow
area.Pleasendspecic
datafromTable4.
FringModules
Installation
Type2:ShortSideMounting
Fig.4
ModuleTypeCellTypeCellDimensions(mm)
Quantity AxBJKMNP
 Table4(Foryourinformation)
Notes:
1)JT***SFa/bisusedasanexample.
2)Where“***”istheratedpoweroftheJetionmodule.
3)Dimension„N“representsthedistancebetweenclampandframe.
4)Dimension„P“representsthethicknessofclamp.
200
200
200
200
200
200
200
200
1195×541
1580×808
1580×1069
1482×676
1324×992
1482×992
1655×992
1956×992
50
50
50
50
50
50
50
50
12
12
12
12
12
12
12
12
0.5~2
0.5~2
0.5~2
0.5~2
0.5~2
0.5~2
0.5~2
0.5~2
2.5~3
2.5~3
2.5~3
2.5~3
2.5~3
2.5~3
2.5~3
2.5~3
JT***SFa/b
JT***SAa/b
JT***SAa/b(Black)
JT***SBa/b
JT***PFe/JT***SFc
JT***PEe/JT***SEc
JT***PDe/JT***SDc/
JT***SDc(Black)
JT***PCe/JT***SCc/
JT***SCc(Black)
JT***PAe/JT***SAc
Mono
Mono
Mono
Poly/Mono
Poly/Mono
Poly/Mono
Mono
Poly/Mono
Mono
Poly/Mono
4x9
6x12
8x12
4x9
6x8
6x9
6x10
6x12
Option2:BoltingMounting
 Eachmoduleshouldsecuretheframesofmoduletosup-
 portingstructurethroughatleast4mountingholes(corres-
 pondingtothemountingrail2and3).Forhighwindand
 snowloads,8holes(correspondingtothemountingrail1to
 4)shouldbesecured.Themoduleframemustbeattached
 tothemountingrailsusingM8corrosion-proofscrews
 togetherwithspringwashersandatwashers.Recommen-
 dedtorqueis5Nm.Usetheexitinginstallationholesinstead
 ofdrillingadditionalholesforinstallation(Drillingholesis
 againstthereliabilityandwarrantyofJetionmodules).Please
 usecorrosion-resistantinstallationandattachmentmaterials.
Fig.5
Mountingrail1
Mountingrail2
Mountingrail4
Mountingrail3
8-[ 9×14
Nut
Mountingrail
M8srew
960
1300
1300
1100
1044
1100
1225
1676
1195×541x30
1580×808x40
1580×1069x45
1482×676x40
1324×992x40
1482×992x40
1655×992x40
1956×992x45
660x508
800x758
800x1019
700x626
544x942
700x942
725x942
1176x942
JT***SFa/b
JT***SAa/b
JT***SAa/b(Black)
JT***SBa/b
JT***PFe/JT***SFc
JT***PEe/JT***SEc
JT***PDe/JT***SDc/
JT***SDc(Black)
JT***PCe/JT***SCc/
JT***SCc(Black)
JT***PAe/JT***SAc
Mono
Mono
Mono
Poly/Mono
Poly/Mono
Poly/Mono
Mono
Poly/Mono
Mono
Poly/Mono
4x9
6x12
8x12
4x9
6x8
6x9
6x10
6x12
ModuleTypeCellTypeCellDimensionsMountingHoleMountingHole
Quantity AxBxC(mm) E (mm) GxF(mm)
Table5
Notes:
1)JT***SFa/bisusedasanexample.
2)Where“***”istheratedpoweroftheJetionmodule.
4) Grounding
 Toavoidtheriskofelectricalshockorre,themoduleframe
 shouldbegroundedbeforetheelectricalconnectionofthe
 modulesisoperated.
 TheframeshallbegroundedinaccordancewithNECArticle
 250[USA[orCECinCanada.
 Foranadequateground,thegroundinghardwareshould
 penetratetheanodizationlayer.
 OnlyULlistedcomponentsshouldbeusedforgrounding.
 Jetionrecommendsusingthefollowingcomponentsorequi-
 valents.
1 StainlesssteelboltM4x30
2 StainlesssteelnutM4
3 StainlesssteelspringwasherM4
4&6StainlesssteelatwasherM4
5 Stainlesssteellock-toothedwasherM4
7 StainlesssteelcupwasherM4
8 Groundingwire
Fig.6
Washer
ModuleTypeCellTypeCellDimensionsMountingHoleMountingHole
Quantity AxBxC(mm) E (mm) GxF(mm)
 Attachaseparateconductorasgroundingwiretothe4mm
 diametergroundingholeswithasetofM4bolt,cup
 washer,atwasher,lock-toothedwasher,springwasherand
 nut.
 Exposedcopperofthegroundingwireshallnotcontactsthe
 moduleframeincaseofcorrodingtheframe.
5) Wiring
For the wiring, pay attention to:
• Tominimizetheriskofindirectlightingstrike,avoidforming 
 closedloopswhendesigningthesystem.Checkthatwiring 
 iscorrectbeforestartingthegenerator.Ifthemeasuredopen
 circuitvoltage(Uoc)[andshort-circuitcurrent[(Isc)different
 fromthespecications,theremaybeawiringfault.
• JetionmodulesusetheJ-Box,onthebacksideofthemodule,
 isweatherproofandisdesignedtobeusedwithstandard
 wiringorconduitconnections.Wiringmethodsshouldbein
 accordancetotheNEC(NationalElectricalCode).Bypass
 diodesandcableclampsareincludedwitheachmodulewhen
 shippedfromthefactory.
• Usemodulesofthesamecongurationsinthesamesystem.
 Whenconnectedinseries,allmodulesmusthavethesame
 current.Whenconnectedinparallel,themodulesmustallhave
 thesamevoltage.Thequantityofmodulesconnectedshould
 matchthevoltagespecicationsofthedevicesusedinthe
 system.Themodulesmustnotbeconnectedtogetherto
 createavoltagewhichishigherthanthepermittedsystem
 voltage.WhendesigningtheJetionsystem,pleasealways
 takeintoconsiderationthevariationofthevoltageunder
 differenttemperatures(pleasechecktherespectivetempera-
 turecoefcientsofthemodules,theVocofthemoduleswillbe
 risewhenthetemperaturedrops).
• Thenumberofmodulesinseriesandinparallelinasystem.
• Whileconnectingthemodulesinseries,thetotalvoltage
 shouldbelessthanthemaximumsystemvoltageUmax[(IEC:[
 Umax=1000V;[UL:[Umax=600V).
• Whileconnectingthemodulesinparallel,thetotalcurrent
 shouldbelessthanthemaximumsystemcurrent.
6) Maintenance and Cleaning
• DonotchangethePVcomponentsoptionally(diode,junction
 box,plugconnectors).
• Givenasufcienttilt(atleast15°C),itisnotgenerallyneces-
 sarytocleanthemodules(rainfallwillhaveaself-cleaning
 effect).Incaseofheavysoiling(whichwillresultinoutput
 reductions),werecommendcleaningthemodulesusing
 plentyofwater(fromahose)withmilddetergentandusing
 agentlecleaningimplement(asponge).CAUTION[DON’T
 USEDETERGENTSCONSISTINGOFABRASIVE,ACETONE
 OROTHERCORROSIVEELEMENTS.Donotcleanthe
 moduleswithcoldwaterduringthewarmerhoursoftheday
 inordertoavoidcreatinganythermalshockthatmaybe
 damagethemodule.
 Dirtmustneverbescrapedorrubbedawaywhen
dry,asthiswillcausemicro-scratches.Werecommendthat 
 thesystemisbeinginspectedatregularintervals.
7) Checklists
 Allfasteningsaretightandsecureandfreeofcorrosion.
 Allcableconnectionsaresecure,tight,cleanandfreeof
 corrosion.
 Cablesarenotdamagedinanyway.
 Checkingtheearthingresistivelyofmetals.
8) Warning
 Themaximumloadonthemodulemustnotexceed30lb/ft²
 (146.5kg/m²).Toavoidexceedingthemaximumload,site-
 specicliveloadssuchaswindandsnowshouldtakeinto
 account.
 Werecommendthatthemaximumnumberofmodulesin
 parallelshouldbenomorethan2.Whenmorethantwo
 modulesorstringsareplannedtobeputinparallel,usestring
 fuses.Thenumberofmodulesinserieshastobemade
 accordingtothemaxsystemvoltageoftheinverterwhichis
 beingused.HowevertheVocVoltageofallmodulesinseries
 shouldneverexceedmorethan1000V.
 Theplugconnectorhasitsownpolarity.Makesurethatthe
 connectionissafeandtight.Ensurethattheyareingood
 electricalandmechanicalcondition.
 Theplugconnectorshouldnotreceiveexternalstress.
 Donotattempttodrillholesintheglasssurfaceofthe
 modules.
 Donotdrilladditionalmountingholesintheframeofthe
 modules.
 DonothoistthemodulethroughtheJ-Boxorcable.
 Neveruseamodulewithbrokenglassortornsubstrate.
 Brokenmodulescannotberepairedandcontactwithany
 modulesurfaceorframecanleadtoelectricalshock.
Donotinstallorhandlemoduleswhentheyarewetorduring 
 theperiodofhighwind.
 Keepchildrenwellawayfromthesystemwhiletransporting
 andinstallingmechanicalandelectricalcomponents.
 Donotstrikeorphysicallydamagethemodule.
 Avoidcuttinganddamagingtheframeandthefrontsideor
backsidesurfaceofthemoduleduringhandlingandinstallati- 
 on.
 Donotstandorsteponthemodule.
 Donotputextraobjectsonthemoduleincaseofglass
 broken.
 TheJ-Boxmustbeonthehighersideofthemodulewhenitis
 mounted.
 Donotdismantleordropthemoduleanddonotremoveany
 attachednameplateorcomponentsfromthemodule.
 Donotbendortwistthemodule.
 Donotapplypaintoradhesivetomoduletopsurface.
 Donotusepointedorsharpobjectswiththemodule.
 Articiallyconcentratedsunlightshallnotbedirectedonthe
 module.
 Precipitationcanrunoffthroughsmallopeningsonthe
 backsideofthemodule.Makesurethattheopeningsare
 notmaskedaftermounting.
 Donotwearingrings,watches,ormetaljewelryduringinstal-
 lations.
9) Hazard Warnings
Danger of death from electric shock!
PVmodulesgenerateelectricityassoonastheyareexposedto
sunlight.Onemodulegeneratesasafe,extralowvoltagelevel,
butmultiplemodulesconnectedinseries(summingthevoltage)
orinparallel(summingthecurrent)representadanger.Thefol-
lowingpointsmustbenotedwhenhandlingthesolarmodules
toavoidtheriskofre,sparkingandfatalelectricshock.
Donotinsertelectricallyconductingpartsintotheplugsor
 sockets!
• Donottsolarmodulesandwiringwithwetplugsand
 sockets!
• Exerciseutmostcautionwhencarryingoutworkonwiring
 andsafetyequipment(useinsulatedtools,insulatedgloves,
 etc.)!
• Donotusedamagedmodules!Donotdismantlemodules!
 Donotmarkontherearofthemoduleusingsharpobjects!
• Exerciseutmostcautionwhenworkingonwiringandthe
 inverter.Besurecarefullytofollowmanufacture’sinstallation
 instructions!
Danger of death from arcing!
Modulesgeneratedirectcurrentwhenlightshinesonthem.An
electricarcmaybegeneratedwhenconnectorsareusedto
turnthecircuitonoroff.Wethereforerecommendedcovering
moduleswithalightproofclothduringinstallation.Whenbrea-
kingaconnectedstringofmodules(e.g.whendisconnecting
theDClinefromtheinverterunderload),alethallystrongarc
canoccur.
Neverdisconnectthesolargeneratorfromtheinverterwhile
 theinverterisconnectedtothemainsgrid—removethefuse
 fromtheACsideontheinverterrst!
• Ensuretheconnectorsarecleanandhavenotbeenconta-
 minatedandthattheelectricalconnectionandmechanical
 jointaregood!
JTInstallationsguideen©JetionSolar|11/2011
Printedonenvironmentallyfriendlypaper.
JETION SOLAR EUROPE
JetionSolar(Europe)Ltd.
Industriering10
9491Ruggell
Liechtenstein
Phone: +4232653830
Fax: +4232653839
E-Mail:info@jetion.biz
www.jetion.biz
JETION SOLAR CHINA
JetionSolar(China)Co.,Ltd.
No.1011,ZhenchengRoad
Shengang,JiangyinMunicipality
JiangsuProvince214443
PeoplesRepublicofChina
Phone:+8651086687300
Fax: +8651086687315
E-Mail:marketing@jetion.com.cn
www.jetionsolar.com
JETION SOLAR USA
10900-ASouthCommerceBlvd
Charlotte,NC28273
Phone: +17049441069
Tollfree: 8006068569
Fax: +17049441080
www.JetionSolarUS.com
/