EKO MV-01 Ventilator & Heater Quick start guide

  • Hello, I'm your AI assistant. I have analyzed the Quick Start Guide for the EKO Ventilation Unit MV-01, and related Pyranometers and IR radiometer models. This document covers installation, wiring, and other important safety precautions. I’m ready to answer any questions you have about the device or the guide's contents.
  • What should I do if any part is missing or damaged?
    What is the maximum power supply voltage?
    What should I do when installing on an inclined surface?
3
, includes 1 spare bolt
S-2016-2019
Pyranometer
IR radiometer
Products
Products which can be mounted
This product is an optional product that can be used in
combination with the following EKO products. A pyranometer and
IR radiometer are sold separately.
Dimentions Mass
Transfer the leveling screws from
pyranometer to MV-01 base.
This manual describes how to attach pyranometer MS-80 to this product.
Pass the fixing bolt (M5 x10mm) through
the fixing hole of pyranometer.
Secure to the MV-01 base with the supplied Allen key.
Make sure that pyranometer and MV-01 connectors are alligned.
Please make sure there is no looseness.
Please Connect the wire as below.
9
Hole width
Turn on the power and check if it is working.
MS-80
MS-60
MS-40
MS-20
QSG-MV-01-19-10E_ver.3
*
*Recommended to use the heater when snowfall or frost occurs only.
Do not apply the power supply more than 13.2V.
The overcurrent protection device works and the heater stops working.
A
A
A
Power Supply
Hole dia met er
φ6.4 mm
Hole dia met er
φ6.4 mm
/